ML17352A556

From kanterella
Jump to navigation Jump to search

Submits Results & Conclusions of Operational Safeguards Response Evaluation Conducted by NRC Ofc of NRR at Plant, Units 3 & 4 from 940110-13
ML17352A556
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/18/1994
From: Varga S
Office of Nuclear Reactor Regulation
To: Goldberg J
FLORIDA POWER & LIGHT CO.
References
TAC-M88440, NUDOCS 9404270326
Download: ML17352A556 (4)


Text

ep,R too~

P C

L w}

z Cl 1

0

~~~ SAFEGUARDS INFOMCATION ~~~t UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Docket Nos.:

50-250 50-251 Mr. J.

H. 'Goldberg President, Nuclear Division Florida Power

& Light Company P.O.

Box 14000 Juno Beach, FL 33408-0420 April 18, 1994

Dear Mr. Goldberg:

SUBJECT:

TURKEY POINT UNITS 3

& 4 OPERATIONAL SAFEGUARDS

RESPONSE

EVALUATION (TAC NOS.

M88440 AND M88441)

This letter conveys the results and conclusions of the Operational Safeguards

Response

Evaluation

{OSRE) conducted by the NRC's Office of Nuclear Reactor Regulation at Turkey Point's Units 3

& 4 from January 10 through 13, 1994.

The OSRE team was composed of NRC personnel assisted by personnel from the U.S.

Army.

One purpose of the OSRE program is to evaluate a licensee's ability to respond in a contingency to an external threat by focusing on the interactions between operations and security in establishing priorities for protection of equipment and on the defensive strategies used.

The OSRE also includes a safety/safeguards interface review to assure that safeguards measures do not adversely affect safe operation of the facility.

The OSRE conclusions are documented in the enclosed report (Part',

Operational Safeguards Readiness Review; and Part II, Safety/Safeguards Interface Review).

This enclosure, which contains safeguards information of a type specified in 10 CFR 73.21, will not be placed in the Public Document

Room, and must be protected against unauthorized disclosure.

The drills, exercises, and demonstrations observed by the team and the results of interviews conducted by the team indicated weaknesses in four areas that should be addressed.

The weaknesses that warrant your attention are identified in the report as concerns.

The team also observed some items of minor significance which are provided for your consideration.

Ne expect that Florida Power and Light will review the discussions and observations for appropriate action.

The team also concluded that effective provisions were in place to assure that safeguards measures did not adversely affect the safe operation of the facility.

~SO -Vio4boa ofIsebxtioa mysbaueots for SAFFl:VARDON IM'XIRMATlOMsubject to Wl1. souI RIMPIAI.Peoalties RoeIosure eoatsias MFFXi ARDS INFORMAYI N Vpoo rauoral ofeorjosure this donsaeot is DIXONYROI.I.RD

~~~ SAFEGUARI)S INFORMATION ~~~

~~o4oroso6r4o~<<>

,"lRC BM gal@'m gsPP

~~~ AFE<GUAEWS INFOMfATI

~'~

Mr. J.

H. Goldberg The enclosed report does not convey any new regulatory requirement.

Its findings have been considered with respect to your ability to meet the general performance objective and requirements of 10 CFR 73.55(a).

We request that you review the report and provide a response to this office within 60 days after receiving this letter.

Your response should specifically address each of the concerns identified in the report.

Except for those findings identified as observations, your response should include a discussion of why you believe corrective action is not warranted for any of those findings for which you do not intend to take action.

This letter affects one respondent and, therefore, is not subject to the Office of Management and Budget review under Public Law 96-511.

Sincerely, fop s(@en A. margi, blrector 0 i inal si ed b

G.

j ainas Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

Enclosure:

Operational Safeguards

Response

Evaluation (Part I, Operational Safeguards Readiness Review; Part II, Safety/Safeguards Interface Review)

Enclosure contains SM~UARDS INPORNATION Upon reaoval of enclosure this docuaent is DECONTROLLED ~

PSGB R/F DRSS R/F SVarga PMckee RDube MWarren HBerkow GLainas NRC PDR Local PDR ~

FCongel DOrrik RHsu LRaghavan ETana cc w/enclosure:

Thomas P. Johnson (SRI)

USNRC P.O.

Box 1448 Homestead, FL 33090 DISTRIBUTION W 0 ENCL SURE DISTRIBUTION W ENCLOSURE Docket File 50-250, 50-251 PSGB OSRE Turkey Point File E.

McCabe, R-I D. McGuire, R-II J.

Creed, R-III B. Murray, R-IV OFFICE PSGB:NRR PSGB:NRR RHs

'Orri PSGB:NRR RGN-II Mwarren+ ATillma PSGB:NRR RDube ~~

PSGB

/

P DATE 02/ >/94 02/ 0 /94 02/iP /94 04/ 9-/94 04/ II /94 l0

/94 OFFICE D:DRSS:N PD2-2:NRR PD2-2:NRR D:PD

NRR A/.ADR2/NRR D

NRR NAME DATE FCon el ETana 157 04/

/94 04/ /g/94 LRa ha 04/I'4 /94 lr HBe'w 1.

S 04/ ((/94 04/ ~/94 SVar 04/ ~/94

~~~ SAFEGUAIU)S INFORMATION ~~~

Hr. J.

H. Goldberg Florida Power and Light Company Turkey Point Plant CC:

Harold F. Reis, Esquire Newman and Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 Jack Shreve, Public Counsel Office of the Public Counsel c/o The Florida Legislature 111 West Madison Avenue, Room 812 Tallahassee, Florida 32399-1400 John T. Butler, Esquire

Steel, Hector and Davis 4000 Southeast Financial Center Hiami, Florida 33131-2398 Hr. Thomas F. Plunkett, Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 Joaquin Avino County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission P.O.

Box 1448 Homestead, Florida 33090 Hr. Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Hr. Joe Hyers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Plant Hanager Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 Hr. H. N. Paduano, Manager Licensing 5 Special Projects Florida Power and Light Company P.O.

Box 14000 Juno

Beach, Florida 33408-0420 Hr.

Edward J.

Weinkam Licensing Manager Turkey Point Nuclear Plant P.O.

Box 4332 Princeton, Florida 33032-4332

~

"1

~l C

1'i "4

I