Discusses Significance of Corrective Actions Taken in Response to Bulletin 86-003.Licensee Replaced air-operated Valves with MOVs
ML17352A218
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/23/1993
From: Berkow H
Office of Nuclear Reactor Regulation
To: Rosenthal J
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
References
IEB-86-003, IEB-86-3, NUDOCS 9309090218
Download: ML17352A218 (4)


Text

August 25, 1993 MEMORANDUM FOR:

FROM:

Jack E. Rosenthal, Chief Reactor Operations Analysis Branch Division of Safety Programs Office for Analysis and Evaluation of Operational Data Herbert N. Berkow, Director Project Directorate II-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

SUBJECT:

SAFETY SIGNIFICANCE OF CORRECTIVE ACTIONS TAKEN IN RESPONSE TO IE BULLETIN 86-03 This responds to your memorandum dated August 9, 1993, regarding the safety significance of corrective actions taken by licensees in response to IE Bulletin (IEB) 86-03, "Potential Failure of Multiple ECCS Pumps Due To Single Failure of Air-Operated Valve In Minimum Flow Recirculation Line."

In the August 9,

1993, memorandum, you expressed potential concern about the Turkey Point initial short-term commitments (similar to the Point Beach Units) to address IEB 86-03, i.e., reliance on operator'ctions outside the control room to establish suction from the containment sump for ECCS after a loss-of-coolant-accident.

In a telephone conversation on August 18, 1993, the licensee indicated that by Plant Change Hodification Nos.86-181 and 86-184, for Units 3 and 4, respectively, the air-operated valves in question were replaced with motor-operated valves which can be operated from the control room.

Implementation 'of these modifications is documented in the licensee's System Acceptance Turnover Sheets dated April 23,

1990, and March 27, 1989, for Units 3 and 4, respectively.

As a result, the potential concerns raised in your August 9,

1993, memorandum are no longer valid for the Turkey Point Units.

cc:

S. Varga G. Lainas J.

Shannon W. Butler L. Raghavan Distribution See next a

e (Original Signed By)

Herbert N. Berkow, Director Project Directorate II-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation Document Name G: IEB8603.TP OFC 'A:PDII-2

'M:PDII-2 NAME ETana 87~

LRa havan DATE I'Q 93

~

2S 93 D: PDI I-2 H e 93 93090902i8930823

'DR 'ADOCK 05000250',I, 9

""PDRp~l'II',gg @NICER QP

I I

MEMORANDUM DATED Au us% 23, 1993 Distribution

,. Docket File,

'RC

& Local PDRs PDII-2 RF H. Berkow E. Tana J.

Hannon OGC ACRS (10)

M. Sinkule, RII

L