Requests Addl Info to Continue Review of Util Response to GL 92-01, Rv Structural Integrity, Rev 1
ML17352A190
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/29/1993
From: Raghavan L
Office of Nuclear Reactor Regulation
To: Goldberg J
FLORIDA POWER & LIGHT CO.
References
GL-92-01, GL-92-1, TAC-M83742, TAC-M83743, NUDOCS 9308190176
Download: ML17352A190 (6)


Text

c gP,S RtG0 D$

+

~O

++*<<~

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 29, 199$

Docket Nos.

50-250 and 50-251 Mr. J.

H. Goldberg Executive Vice President Florida Power and Light Company Post Office Box 14000 Juno

Beach, Florida 33408-0420

Dear Mr. Goldberg:

SUBJECT:

TURKEY POINT UNITS 3 AND 4 REQUEST FOR ADDITIONAL INFORMATION-GENERIC LETTER (GL) 92-01, "REACTOR VESSEL STRUCTURAL INTEGRITY" REVISION 1

DATED MARCH 6, 1992 (TAC NOS.

M83742 AND M83743)

By letter dated July 1,

1992, you provided response to GL 92-01 "Reactor Vessel Structural Integrity," Revision 1, dated March 6, 1992, for Turkey Point Units 3 and 4.

We have completed our initial review and determined that we will need additional information identified below to continue our review.

Your response to quesion 2b in GL 92-01 refers to Table 3 of BAW-2166 which indicates that a generic initial RT>>> of -5 'F, which is the mean RTgpT value for 34 Linde 80 welds (BAW-1803, RevVsion 1), is used for all welds except weld SA-1101.

Please provide justification for not using the generic mean value for Linde 80 welds of 0 'F as required by 10 CFR 50.61.

Your response to questions 2b(5) in GL 92-01 refers to Table 5 of BAW-2166 and indicates that the copper content for beltline material 122S146VA1 is not known.

Please confirm this and justify that embrittlement for this material is not a concern.

In order for us to maintain our review schedule, your response is requested within 60 days of the date of this letter.

If you cannot provide a full response within the requested time, please provide your full response schedule within 60 days of the date of this letter.

The information requested by this letter is within the scope of the overall burden estimated in Generic Letter 92-01, Revision 1, "Reactor Vessel Structural Integrity, 10 CFR 50.54(f)."

The estimated average number of burden hours is 200 person hours for each adressee's response.

This estimate pertains only to the identified response-related matters and does not include the time required to implement actions required by the regulations.

This action is covered by the Office of Management and Budget Clearance Number 3120-0011, which expires June.30, 1994.

930819017b pS000P50 q30729 PDR'DO.

PDR p

I 3

I'

'Ia)P lj+I f~~~']l(

(0

>0

Please contact me at (301) 504-1471 if you have any questions concerning this letter.

Sincerely, cc:

See next page Distribution-----

'RC 5 Local PDRs-4++~W+'- ~

PDI I-2 RF S.

Varga G. Lainas H. Berkow E.

Tana L. Raghavan OGC ACRS (10)

H. Sinkule, RII L. Raghav

, Project Manager Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation OFFICE LA:PDII-2 PM: PD I 1-2 D:P I-DATE ETana Sg<

07 gF 93 LRa hava HBerkow 07/R,

/93 07 7 93 OFFICIAL RECORD COPY -

DOCU ENT NAME: C:i UTOSiWPDOCSiTURKEYiTP83742.RAI ENCLOSURE

0 1

Mr. J.

H. Goldberg Florida Power and Light Company Turkey Point Plant CC:

Harold F. Reis, Esquire Newman and Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 Jack Shreve, Public Counsel Office of the Public Counsel c/o The Florida Legislature 111 West Madison Avenue, Room 812 Tallahassee, Florida 32399-1400 John T. Butler, Esquire

Steel, Hector and Davis 4000 Southeast Financial Center Ni ami, Florida 33131-2398 Mr. Thomas F. Plunkett, Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 Joaquin Avino County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission P.O.

Box 1448 Homestead, Florida 33090 Mr. Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Mr, Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 Mr.

R.

E

~ Grazio Director, Nuclear Licensing Florida Power and Light Company P.O.

Box 14000 Juno

Beach, Florida 33408-0420

Eg