Confirms 930628 Telcon Between J Holt & R Schin Re Meeting to Be Held in Atlanta on 930716.Purpose of Meeting for Util to Make Presentation on Engineering Initiatives.Proposed Agenda Encl
ML17352A118
Person / Time
Site: Turkey Point, Saint Lucie  NextEra Energy icon.png
Issue date: 07/02/1993
From: Merschoff E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
References
NUDOCS 9308060160
Download: ML17352A118 (6)


Text

JUL 091993 Docket Nos. 50-250, 50-251, 50-335, 50-389 License Nos.

DPR-31, DPR-41, DPR-67, NPF-16 Florida Power and Light Company ATTN:

Mr. J.

H. Goldberg President

- Nuclear Division P. 0.

Box 14000 Juno

Beach, FL 33408-0420 Gentlemen:

SUBJECT:

MEETING TO DISCUSS FLORIDA POWER AND LIGHT ENGINEERING INITIATIVES This letter confirms the telephone conversation between Mr. J. Holt of Florida Power and Light and Mr. R. Schin of my staff on June 28,

1993, concerning a

meeting to be held at the NRC office in Atlanta at 10:00 a.m.

on July 16, 1993.

The purpose of this meeting is for FPL to make a presentation on engineering initiatives.

A proposed agenda is enclosed.

Should you have any questions regarding these arrangements, we will be pleased to discuss them.

Sincerely, Original signed by Ellis W. Merschoff, Director Division of Reactor Projects

Enclosure:

Proposed Meeting Agenda cc w/encl:

R.

E. Grazio, Director Nuclear Licensing Florida Power and Light Company P. 0.

Box 14000 Juno

Beach, FL 33408-0420 cc w/encl cont'd:

(See page 2) 9308060ih0 930702 PDR DR ADOCH, 050002 PDR P

Florida Power and Light Company cc w/encl cont'd:

D. A. Sager Site Vice President St. Lucie Nuclear Plant P. 0.

Box 128 Ft. Pierce, FL 34954-0128 T. F. Plunkett Site Vice President Turkey Point Nuclear Plant P. 0.

Box 029100 Miami, FL 33102 G. J.

Boissy Plant General Manager St. Lucie Nuclear Plant P. 0.

Box 128 Ft. Pierce, FL 34954-0128 L.

W. Pearce Plant General, Manager Turkey Point Nuclear Plant P. 0.

Box 029100 Miami, FL 33102 T. V. Abbatiello Site guality Manager Turkey Point Nuclear Plant P. 0.

Box 029100 Miami, FL 33102 E. J.

Weinkam, Licensing Manager Turkey Point Nuclear Plant P. 0.

Box 029100

Miami, FL 33102 Harold F. Reis, Esq.

Newman and Holtzinger, P.C.

1615 L Street, NW Washington, D. C.

20036 John T. Butler, Esq.

Steel, Hector and Davis 4000 Southeast Financial Center
Miami, FL 33131-2398 Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 cc w/encl cont'd:

(See page 3)

Florida Power and Light Company cc w/encl cont'd:

Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, FL 32399-0700 Jack Shreve Public Counsel Office of the Public Counsel c/o The Florida Legislature 111 West Hadison Avenue, Room 812 Tallahassee, FL 32399-1400 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, FL 32301 Joaquin Avino County Hanager:of Hetropolitan Dade County ill NW 1st Street, 29th Floor

Hiami, FL 33128 Joe Hyers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Thomas R. L. Kindred County Administrator St. Lucie County 2300 Virginia Avenue Fort Pierce, FL 34982 Charles B. Brinkman Washington Nuclear Operations ABB Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, HD 20852 bcc w/encl:

L. Raghavan, NRR J. Norris, NRR bcc w/encl cont'd:

(See page 4)

Florida Power and Light Company bcc w/encl cont'd:

K. Landis, RII S. Vias, RII Document Control Desk NRC Resident Inspector U.S. Nuclear Regulatory Commission 7585 South Highway A1A Jensen

Beach, FL 34957-2010 Ross Butcher Senior'Resident Inspector U.S. Nuclear Regulatory Commission P. 0.

Box 1448 Homestead, FL 33090 R

'QRP RI:

P R chin Landis 7/m/93 7/~93 RII:DRP HSinkule 7/g-/93

ENCLOSURE AGENDA FPL/NRC HEETING ON ENGINEERING INITIATIVES FRIDAY JULY 16, 1993 - 10:00 A.H.

ATLANTA, GEORGIA PURPOSE PSL RCP SHAFT ROOT CAUSE PSL PRESSURIZER INCONEL 600 NOZZLES PSL CODE SAFETIES PSL CONTROL ELEHENT DRIVE HECHANISH CONTROL SYSTEH PSL LESSONS LEARNED PROCESS IHPROVEHENTS TO SUPPORT OPERATIONS AND HAINTENANCE W. Bohlke D. West / H.

Paduano J. Scarola D. Wolf L. Rogers G. Boissy J.

Hosmer