Forwards Final SALP Repts 50-250/93-03 & 50-251/93-03 for Period 910929-930130.Weakness in Engineering Oversight of Contractors Noted
ML17349A872
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/14/1993
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17349A873 List:
References
NUDOCS 9306020160
Download: ML17349A872 (6)


See also: IR 05000250/1993003

Text

X &~ L

4"

w

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9306020160

DOC.DATE: 93/05/14.

NOTARIZED: NO

DOCKET

g

FQCIL:50-250 Turkey Point Plant, Unit 3, Florida Power

and Light C

05000250

50-251 Turkey Point Plant, Unit 4, Florida Power

and Light C

05000251

AUTH.NAME

AUTHOR AFFILIATION

EBNETER,S.D.

Region

2 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

GOLDBERG,J.H.

Florida Power

6 Light Co.

SUBJECT:

Forwards final SALP repts

50-250/93-03

& 50-.251/93-03 for

period 910929-930130.Weakness

in engineering

oversight of

contractors

noted.

DISTRIBUTION CODE:

IE40D

CQPIES

RECEIVED:LTR 2 ENCLj SIZE: +7 5 5

TITLE: Systematic

Assessment

of Licensee

Performance

(SALP) Report

NOTES:

RECIPIENT

ID CODE/NAME

PD2-2

LA

RAGHAVAN,L

INTERNAL: AEOD/DOA

COMMISSION

NRR/DORS/OEAB

NRR/DRCH/HOLB

NRR/DRIL/RSIB

NRR/DRSS/PRPB

NRR/PMAS/ILRB

OE- L

EG FIL

02

EXTERNAL

EGSG/BRYCE s J

~ H

NRC

PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

5

5

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

'ID CODE/NAME

PD2-2

PD

AEOD/DSP/TPAB

DEDRO

NRR/DRCH/HHFBPT

NRR/DRIL/RPEB

NRR/DRSS/PEPB

NRR/DRSS/RSGB

NUDOCS-ABSTRACT

OGC/HDS3

RGN2

FILE

Ol

L ST LOBBY WARD

NSIC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION

LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

29

ENCL

29

IC

I

~

Docket Nos. 50-250,

50-251

License

Nos.

DPR-31,

DPR-41

Florida Power

and Light Company

ATTN:

Hr. J.

H. Goldberg

President

- Nuclear Division

P. 0.

Box 14000

Juno

Beach,

FL

33408-0420

Gentlemen:

SUBJECT:

SYSTEMATIC ASSESSMENT

OF LICENSEE

PERFORMANCE

(INSPECTION

REPORT

NOS. 50-250/93-03

AND 50-251/93-03)

FINAL SALP REPORT

This refers to the

NRC Systematic

Assessment

of Licensee

Performance

(SALP)

Report for your. Turkey Point facility which was sent to you on April 2,

1993,

our meeting

on April 15,

1993,

and your SALP response letter of April 23,

1993.

Thank you for your review of the

SALP report

and your participation in the

SALP meeting

on April 15.

Your specific

comments

have

been evaluated.

The first paragraph

on page

19

does contain information about hardware installation

and the control of the

contractor work during an installation that occurred in the previous

SALP

period.

The weakness

in engineering

oversight of contractors

was noted during

inspection activity conducted

between

October

28 and

November 8,

1991, that

resulted

in a violation.

The inspection occurred very early in this

SALP

period

as discussed

in

NRC Inspection

Report 50-250,251/91-45,

dated

January

2,

1992.

Additionally, your letter,

L-92-016, dated January

29,

1992,

which responded

to the violation, discussed

corrective actions to be completed

in early 1992.

The

SALP Board is obligated to consider all inspection

activity and enforcement

which occurs during the

SALP period.

As described

in

Enclosure

1,

page

23 of the

SALP Report

has

been revised to incorporate your

comment.

The Final

SALP Report is provided

as Enclosure

2.

Again, thank you

for your review and comments.

After the

SALP presentation,

the

NRC met with the local public officials and

the media to reaffirm the NRC's role and address

any questions

on items of

mutual interest.

The enclosures

consist of a Revision Sheet,

Final

SALP Report,

Meeting

Summary,

the

SALP presentation

slides,

and

a copy of your written comments.

In accordance

with Section

2.790 of the NRC's "Rules of Practice, " a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

/

9306020ih0 9305i4

PDR

ADOCK 05000250

Q

PDR

g

ro

Florida Power

and Light Co.

NY l4 II

No reply to this letter is required.

However,

should you have

any questions,

I would be pleased

to discuss

them with you.

Sincerely,

Original signed

by

Stewart

D. Ebneter

Regional Administrator

Enclosures:

1.

SALP Board Report Revision Sheet

2.

Final

SALP Report

- Turkey Point

3.

Meeting

Summary

4.

SALP Presentation

Slides

5.

FPL letter dated April 23,

1993

cc w/encls:

R.

E. Grazio, Director

Nuclear Licensing

Florida Power

and Light

Company'.

0.

Box 14000

Juno

Beach,

FL

33408-0420

L.

W. Pearce

Plant General

Manager

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami,

FL

33102

T.

F. Plunkett

Site Vice President

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami,

FL

33102

T. V. Abbatiello

Site equality

Manager

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami,

FL

33102

E. J.

Weinkam, Licensing Manager

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami,

FL

33102

Harold F. Reis,

Esq.

Newman

and Holtzinger,

P.C.

1615

L Street,

NW

Washington,

D.

C.

20036

cc w/encls cont'd:

(See

page 3)

Florida Power and Light Co.

cc w/encls cont'd:

John T. Butler,

Esq.

Steel,

Hector and Davis

4000 Southeast

Financial

Center

Hiami,

FL

33131-2398

Attorney General

Department of Legal Affairs

The Capitol

Tallahassee,

FL

32304

Bill Passetti

Office of Radiation Control

Department of Health

and

Rehabilitative Services

1317 Winewood Boulevard

Tallahassee,

FL

32399-0700

Jack Shreve

Public Counsel

Office of the Public Counsel

c/o The Florida Legislature

111 West Hadison Avenue,

Room 812

Tallahassee,

FL

32399-1400

Administrator

Department of Environmental

Regulation

Power Plant Siting Section

State of Florida

2600 Blair Stone

Road

Tallahassee,

FL

32301

Joaquin Avino

County Hanager of Hetropolitan

Dade County

ill NW 1st Street,

29th Floor

Hiami,

FL

33128

Joe Hyers, Director

Division of Emergency

Preparedness

Department of Community Affairs

2740 Centerview Drive

Tallahassee,

FL

32399-2100

INPO

bcc w/encls:

(See

page

4)

Florida Power

and Light Co.

bcc w/encl:

L. Raghavan,

NRR

K. Landis, RII

S. Vias, RII

Document Control

Desk

Ross

Butcher

Senior

Resident

Inspector

U.S. Nuclear Regulatory

Commission

P. 0.

Box l448

Homestead,

FL

33090

The Chairman

K. C. Rogers,

Commissioner

J.

R. Curtiss,

Commissioner

F.

J

~ Remick,

Commissioner

E.

G.

De Planque,

Commissioner

J.

M. Taylor,

EDO

H. L. Thompson, Jr.,

EDO

J.

F. Mechselberger,

Regional

Coordinator,

EDO

T.

E. Murley,

NRR

S.

Varga,

NRR

F. Allenspach,

SALP Coordinator,

NRR

Regional Administrators,

RI, RIII,

RIV, and

RV

K: Clark, RII,

PAO

M. Sinkule,

DRP, RII

K. Landis,

DRP, RII

RE Schin,

DRP, RII

S. Vias, Chief,

TSS

(2 copies)

NRC Resident

Ins ector

HAY

I 4 593

DRS and

DRSS Branch Chiefs,

and

DRSS Section Chiefs

Document Control

Desk'ffice

NRR

NRR

Initials

Date

Rag

ven

r HBer ow

.04

(/93

04/

/93

Office

Name

Initials

Date

RII:DRP

RII:DRP

RButc

r

KLand'4/5/93

04/5/93

RII:DRP

MSinkule

04

/93

RII:DRP

EN rs boff

~

/93

RII:D

LR

0/ 93

/>a/gx

ll

ENCLOSURE

1

SALP

BOARD REPORT

REVISION SHEET

PAGE

23

LINE(S)

32-34

NOW READS .

The licensee's

guality

Department

was reorganized

in November

1991 with

guality Assurance

and

guality Control

becoming

one

organization reporting to

a

Site guality Manager.

SHOULD READ

The licensee's

guality

Department

was reorganized

in November

1991 with

guality Assurance

and

guality Control continuing

to report to

a Site guality

Manager.

Basis:

The original reorganization

which resulted

in both groups reporting

to a single Site guality Manager occurred in April 1990

and the November

1991 reorganization

did not change that reporting structure.