REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9306020160
DOC.DATE: 93/05/14.
NOTARIZED: NO
DOCKET
g
FQCIL:50-250 Turkey Point Plant, Unit 3, Florida Power
and Light C
05000250
50-251 Turkey Point Plant, Unit 4, Florida Power
and Light C
05000251
AUTH.NAME
AUTHOR AFFILIATION
EBNETER,S.D.
Region
2 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
GOLDBERG,J.H.
Florida Power
6 Light Co.
SUBJECT:
Forwards final SALP repts
50-250/93-03
& 50-.251/93-03 for
period 910929-930130.Weakness
in engineering
oversight of
contractors
noted.
DISTRIBUTION CODE:
IE40D
CQPIES
RECEIVED:LTR 2 ENCLj SIZE: +7 5 5
TITLE: Systematic
Assessment
of Licensee
Performance
(SALP) Report
NOTES:
RECIPIENT
ID CODE/NAME
PD2-2
LA
RAGHAVAN,L
INTERNAL: AEOD/DOA
COMMISSION
NRR/DORS/OEAB
NRR/DRCH/HOLB
NRR/DRIL/RSIB
NRR/DRSS/PRPB
NRR/PMAS/ILRB
OE- L
EG FIL
02
EXTERNAL
EGSG/BRYCE s J
~ H
NRC
COPIES
LTTR ENCL
1
1
1
1
1
1
5
5
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
'ID CODE/NAME
PD2-2
AEOD/DSP/TPAB
DEDRO
NRR/DRCH/HHFBPT
NRR/DRIL/RPEB
NRR/DRSS/PEPB
NRR/DRSS/RSGB
NUDOCS-ABSTRACT
OGC/HDS3
RGN2
FILE
Ol
L ST LOBBY WARD
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
29
ENCL
29
I
~
Docket Nos. 50-250,
50-251
License
Nos.
Florida Power
and Light Company
ATTN:
Hr. J.
H. Goldberg
President
- Nuclear Division
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
Gentlemen:
SUBJECT:
SYSTEMATIC ASSESSMENT
OF LICENSEE
PERFORMANCE
(INSPECTION
REPORT
NOS. 50-250/93-03
AND 50-251/93-03)
FINAL SALP REPORT
This refers to the
NRC Systematic
Assessment
of Licensee
Performance
(SALP)
Report for your. Turkey Point facility which was sent to you on April 2,
1993,
our meeting
on April 15,
1993,
and your SALP response letter of April 23,
1993.
Thank you for your review of the
SALP report
and your participation in the
SALP meeting
on April 15.
Your specific
comments
have
been evaluated.
The first paragraph
on page
19
does contain information about hardware installation
and the control of the
contractor work during an installation that occurred in the previous
period.
The weakness
in engineering
oversight of contractors
was noted during
inspection activity conducted
between
October
28 and
November 8,
1991, that
resulted
in a violation.
The inspection occurred very early in this
period
as discussed
in
NRC Inspection
Report 50-250,251/91-45,
dated
January
2,
1992.
Additionally, your letter,
L-92-016, dated January
29,
1992,
which responded
to the violation, discussed
corrective actions to be completed
in early 1992.
The
SALP Board is obligated to consider all inspection
activity and enforcement
which occurs during the
SALP period.
As described
in
Enclosure
1,
page
23 of the
SALP Report
has
been revised to incorporate your
comment.
The Final
SALP Report is provided
as Enclosure
2.
Again, thank you
for your review and comments.
After the
SALP presentation,
the
NRC met with the local public officials and
the media to reaffirm the NRC's role and address
any questions
on items of
mutual interest.
The enclosures
consist of a Revision Sheet,
Final
SALP Report,
Meeting
Summary,
the
SALP presentation
slides,
and
a copy of your written comments.
In accordance
with Section
2.790 of the NRC's "Rules of Practice, " a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room.
/
9306020ih0 9305i4
ADOCK 05000250
Q
g
ro
Florida Power
and Light Co.
NY l4 II
No reply to this letter is required.
However,
should you have
any questions,
I would be pleased
to discuss
them with you.
Sincerely,
Original signed
by
Stewart
D. Ebneter
Regional Administrator
Enclosures:
1.
SALP Board Report Revision Sheet
2.
Final
SALP Report
- Turkey Point
3.
Meeting
Summary
4.
SALP Presentation
Slides
5.
FPL letter dated April 23,
1993
cc w/encls:
R.
E. Grazio, Director
Nuclear Licensing
Florida Power
and Light
Company'.
0.
Box 14000
Juno
Beach,
FL
33408-0420
L.
W. Pearce
Plant General
Manager
Turkey Point Nuclear Plant
P. 0.
Box 029100
Miami,
FL
33102
T.
F. Plunkett
Site Vice President
Turkey Point Nuclear Plant
P. 0.
Box 029100
Miami,
FL
33102
T. V. Abbatiello
Site equality
Manager
Turkey Point Nuclear Plant
P. 0.
Box 029100
Miami,
FL
33102
E. J.
Weinkam, Licensing Manager
Turkey Point Nuclear Plant
P. 0.
Box 029100
Miami,
FL
33102
Harold F. Reis,
Esq.
Newman
and Holtzinger,
P.C.
1615
L Street,
NW
D.
C.
20036
cc w/encls cont'd:
(See
page 3)
Florida Power and Light Co.
cc w/encls cont'd:
John T. Butler,
Esq.
Steel,
Hector and Davis
4000 Southeast
Financial
Center
Hiami,
FL
33131-2398
Attorney General
Department of Legal Affairs
The Capitol
Tallahassee,
FL
32304
Bill Passetti
Office of Radiation Control
Department of Health
and
Rehabilitative Services
1317 Winewood Boulevard
Tallahassee,
FL
32399-0700
Jack Shreve
Public Counsel
Office of the Public Counsel
c/o The Florida Legislature
111 West Hadison Avenue,
Room 812
Tallahassee,
FL
32399-1400
Administrator
Department of Environmental
Regulation
Power Plant Siting Section
State of Florida
2600 Blair Stone
Road
Tallahassee,
FL
32301
Joaquin Avino
County Hanager of Hetropolitan
Dade County
ill NW 1st Street,
29th Floor
Hiami,
FL
33128
Joe Hyers, Director
Division of Emergency
Preparedness
Department of Community Affairs
2740 Centerview Drive
Tallahassee,
FL
32399-2100
bcc w/encls:
(See
page
4)
Florida Power
and Light Co.
bcc w/encl:
L. Raghavan,
K. Landis, RII
S. Vias, RII
Document Control
Desk
Ross
Butcher
Senior
Resident
Inspector
U.S. Nuclear Regulatory
Commission
P. 0.
Box l448
Homestead,
FL
33090
The Chairman
K. C. Rogers,
Commissioner
J.
R. Curtiss,
Commissioner
F.
J
~ Remick,
Commissioner
E.
G.
De Planque,
Commissioner
J.
M. Taylor,
H. L. Thompson, Jr.,
J.
F. Mechselberger,
Regional
Coordinator,
T.
E. Murley,
S.
Varga,
F. Allenspach,
SALP Coordinator,
Regional Administrators,
RI, RIII,
RIV, and
RV
K: Clark, RII,
PAO
M. Sinkule,
DRP, RII
K. Landis,
DRP, RII
RE Schin,
DRP, RII
S. Vias, Chief,
(2 copies)
NRC Resident
Ins ector
HAY
I 4 593
DRS and
DRSS Branch Chiefs,
and
DRSS Section Chiefs
Document Control
Desk'ffice
NRR
Initials
Date
Rag
ven
r HBer ow
.04
(/93
04/
/93
Office
Name
Initials
Date
RII:DRP
RII:DRP
RButc
r
KLand'4/5/93
04/5/93
RII:DRP
MSinkule
04
/93
RII:DRP
EN rs boff
~
/93
RII:D
LR
0/ 93
/>a/gx
ll
ENCLOSURE
1
BOARD REPORT
REVISION SHEET
PAGE
23
LINE(S)
32-34
NOW READS .
The licensee's
guality
Department
was reorganized
in November
1991 with
guality Assurance
and
guality Control
becoming
one
organization reporting to
a
Site guality Manager.
SHOULD READ
The licensee's
guality
Department
was reorganized
in November
1991 with
guality Assurance
and
guality Control continuing
to report to
a Site guality
Manager.
Basis:
The original reorganization
which resulted
in both groups reporting
to a single Site guality Manager occurred in April 1990
and the November