April 7,
1992
Florida Power
and Light Company
ATTN:
Hr. J.
H. Goldberg,
President
Nuclear Division
P. 0.
Box 14000
Juno
Beach,
FL 33408-0420
Gentlemen:
SUBJECT:
TURKEY POINT RE(UALIFICATION EXAMINATION REPORT
NO. 50-250/92-300
II
During the period February
24 through Harch
6 1992,
the
NRC administered
requalification examinations
led by Richard
S. Baldwin to employees of your
company
who currently hold licenses
to operate
the Turkey Point Nuclear Plant.
At the conclusion of the examination,
the examination questions
and prelim-
inary findings were discussed
with those
members of your staff identified in
the Examination Report,
Enclosure l.
A copy of the written examination
questions
and answer
keys is included in
this report
as Enclosure
2.
A Requalification
Program Evaluation Report is
included
as Enclosure
3.
The evaluation report finds that the Turkey Point
requalification program is classified
as satisfactory.
A Simulator Fidelity
Report is provided
as Enclosure
4.
Even though the proposed
simulator scenarios
met or were modified to meet the
Examiner Standards
(ES); 604-1,
"Simulator Review Checklist," the
NRC is
concerned
with the content of the evaluation scenarios.
Details of this
concern
can
be found in Enclosure
2, paragraph
1.b.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of
this letter and the enclosures will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this examination,
please
contact us.
Sincerely,
(original signed
by T. A. Peebles)
Thomas
A. Peebles,
Chief
Operations
Branch
Division of Reactor Safety
Enclosures:
1.
Examination Report
No. 50-250/92-300
2.
Written Examination(s)
and Answer Key(s)
(Document Control
Desk Only)
3.
Requalification
Program Evaluation Report
4.
Simulator Fidelity Report
cc w/encls:
(See
page
2)
9206020124
920407
ADOCK 05000250
V
t
Florida Power
and Light Company
April 7,
1992
cc w/encls:
1, 3,
and 4:
L.
W. Pearce,
Turkey Point Plant Manager
P.
N. McCullough, Manager,
Nuclear Training,
Turkey Point Nuclear Plant
K. E. Beatty,
Turkey Point Training Superintendent
cc w/encl
1:
State of Florida
bcc w/encls
1, 3,
and 4:
R. Auluck,
E. Merschoff,
K. Landis,
J.
Moorman,
R. Baldwin,
G. Harris,
D. Starkey,
Vogtle Resident
Inspector
R. Butcher,
Turkey Point
Senior Resident
Inspector
Operator Licensing Branch,
DLP(}, NRR
bcc w/encls
1, 2, 3,
and 4:
Document Control
Desk
bcc w/o encls:
IMS, Region II
RII:DRS
RBaldwin:rb/btm
/ ) /92
RII:DRS
CCasto
4/ Q/92
RII:
KL
is
4/ g
/92