ML17349A241

From kanterella
Jump to navigation Jump to search
Forwards Exam Rept 50-250/92-300 on 920224-0306.Based on Results of Exam,Util Requalification Program Has Been Determined to Be Satisfactory
ML17349A241
Person / Time
Site: Turkey Point 
Issue date: 04/07/1992
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17349A242 List:
References
NUDOCS 9206020124
Download: ML17349A241 (2)


See also: IR 05000250/1992300

Text

April 7,

1992

Florida Power

and Light Company

ATTN:

Hr. J.

H. Goldberg,

President

Nuclear Division

P. 0.

Box 14000

Juno

Beach,

FL 33408-0420

Gentlemen:

SUBJECT:

TURKEY POINT RE(UALIFICATION EXAMINATION REPORT

NO. 50-250/92-300

II

During the period February

24 through Harch

6 1992,

the

NRC administered

requalification examinations

led by Richard

S. Baldwin to employees of your

company

who currently hold licenses

to operate

the Turkey Point Nuclear Plant.

At the conclusion of the examination,

the examination questions

and prelim-

inary findings were discussed

with those

members of your staff identified in

the Examination Report,

Enclosure l.

A copy of the written examination

questions

and answer

keys is included in

this report

as Enclosure

2.

A Requalification

Program Evaluation Report is

included

as Enclosure

3.

The evaluation report finds that the Turkey Point

requalification program is classified

as satisfactory.

A Simulator Fidelity

Report is provided

as Enclosure

4.

Even though the proposed

simulator scenarios

met or were modified to meet the

Examiner Standards

(ES); 604-1,

"Simulator Review Checklist," the

NRC is

concerned

with the content of the evaluation scenarios.

Details of this

concern

can

be found in Enclosure

2, paragraph

1.b.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of

this letter and the enclosures will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this examination,

please

contact us.

Sincerely,

(original signed

by T. A. Peebles)

Thomas

A. Peebles,

Chief

Operations

Branch

Division of Reactor Safety

Enclosures:

1.

Examination Report

No. 50-250/92-300

2.

Written Examination(s)

and Answer Key(s)

(Document Control

Desk Only)

3.

Requalification

Program Evaluation Report

4.

Simulator Fidelity Report

cc w/encls:

(See

page

2)

9206020124

920407

PDR

ADOCK 05000250

V

PDR

t

Florida Power

and Light Company

April 7,

1992

cc w/encls:

1, 3,

and 4:

L.

W. Pearce,

Turkey Point Plant Manager

P.

N. McCullough, Manager,

Nuclear Training,

Turkey Point Nuclear Plant

K. E. Beatty,

Turkey Point Training Superintendent

cc w/encl

1:

State of Florida

bcc w/encls

1, 3,

and 4:

R. Auluck,

NRR

E. Merschoff,

DRS

K. Landis,

DRP

J.

Moorman,

DRS

R. Baldwin,

DRS

G. Harris,

DRS

D. Starkey,

Vogtle Resident

Inspector

R. Butcher,

Turkey Point

Senior Resident

Inspector

Operator Licensing Branch,

DLP(}, NRR

bcc w/encls

1, 2, 3,

and 4:

Document Control

Desk

bcc w/o encls:

IMS, Region II

RII:DRS

RBaldwin:rb/btm

/ ) /92

RII:DRS

CCasto

4/ Q/92

RII:

KL

is

4/ g

/92