ML17348B452
| ML17348B452 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/31/1992 |
| From: | Plunkett T FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17348B453 | List: |
| References | |
| L-92-93, NUDOCS 9204060127 | |
| Download: ML17348B452 (4) | |
Text
N V
.CELERATED DISTRIBUTION DHMONST$&TION SYSTEM DOCKET 05000250 05000251 D
/
05000250 05000251 A
D
, ~ REGULAT INFORMATION DISTRIBUTIOtISTEM (RIDE)
Sg ACCESSION iC3R:9204060127 DOC.DATE: 92/03/31 NOTARIZED:
NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION PLUNKETT,T.F.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)@g~
SUBJECT:
Forwards nonproprietary Rept BAW-2118, "Low Upper-Shelf Toughness Fracture Analysis of Reactor Vessels of Turkey Point Units 3
4 for Load Level A B Conditions," per 10CFRSO,App G,Section VE,by 920204 ltr.
DISTRIBUTION CODE:
GOOSD COPIES RECEIVED:LTR 4 ENCL g SIZE:
+ lO0 TITLE: Babcock
& Wilcox gB&W) Owners Group Corr spondence
% e. ~ +~pet-M NOTES:NRR RAGHAVAN,L NRR RAGHAVAN,L RECIPIENT ID CODE/NAME INTERNAL: AEOD DIR AEOD/TTC BELL,L NRR ALEXION,T NRR HERNAN,R NRR SlEGEL,B NRR WIENSFL.
NRR/DET/ESGB 8D NRR/DLPQ/LPEB10 NRR/DRSP 3/4/5 NRR/DST/EMEB9H3 NRR/DST/SICB8H3 NRR/DST/SRXB 8E RES DE RGN1 RGN3 RGN5 EXTERNAL: *LPDR 50-302
- LPDR 50-313
- LPDR 50-460
- LPDR50-289/320 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 2
2 1
1 RECIPIENT ID CODE/NAME A OD%DSS E
NRR HALLFR.
NRR KALMANFG NRR SILVER,H NRR/DET/ECMB 9H NRR/DLPQ/LHFB11 NRR/DRP 1/2 14E NRR/DST 8E2 NRR/DST/SELB 8D NRR/DST/SPLB8D1 OC/LFMB RES/DSIR/EIB RGN2 RGN4
- LPDR 50-312
- LPDR 50-346
- LPDR OCONEE
- LPDR50-329/330 NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
0 1
1 1
1 1
0 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 D
I, I
D NOTES:
1 1
NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 43 ENCL We
~
~
P.O. Sox 029100, Miami, FL, 33102-9100 MAR 8 1 tri9P L-92-93 10 CFR 50, Appendix G
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.
20555 Gentlemen:
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 Low Upper-Shelf Toughness Fracture Analysis of Reactor Vessels of Turkey Point Units 3
and 4 for Load Level A and B Conditions In accordance with the requirements of 10 CFR 50 Appendix G, Section V.E., by letter L-92-02 dated February 4,
1992, Florida Power and Light Company (FPL) submitted an analysis on low upper-shelf toughness fracture of the Turkey Point Units 3 and 4 reactor vessels for load level A and B conditions, (BAW-2118P, dated November 1991)
The information provided in that report is, proprietary to, and provided by, the B&W Owners Group.
- Enclosed, please find two copies of the non-proprietary version of the same
- report, "The B&W Owners Group Materials Committee, Low Upper-Shelf Toughness Fracture Analysis of Reactor Vessels of Turkey Point Units 3 and 4 for Load Level A
& B Conditions,"
BAW-2118, dated November 1991.
Should there be any questions, please contact us.
Very truly yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/OIH enclosure cc:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC (w/o enclosure)
Senior Resident Inspector,
.USNRC, Turkey Point Plant (w/o enclosure)
James H. Taylor, B
W Utility Owners Group, B
W Nuclear Service Company (w/o enclosure) 92040b0127 920331 PDR ADOCK 05Q00250, P
.-"'DR an FPL Group company
I l-Il