ML17348B451

From kanterella
Jump to navigation Jump to search
Requests Written Response to Proposed Alert Re Problem ABB Relay Type RXMH2
ML17348B451
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/24/1992
From: Cwalina G
Office of Nuclear Reactor Regulation
To: Jans D
ABB POWER DISTRIBUTION, INC.
References
NUDOCS 9204030274
Download: ML17348B451 (5)


Text

ard General Manager ABB Power T&D Compan~tnc.

Relay Division 4300 Coral Ridge Drive Coral Springs, Florida 33065

Dear Mr. Jans:

March 24, 1

SUBJZC1".

PROPOSED AIZfG'S5-A-92-01 CONCERNING PROBLEM WITH ABB RELAY TYPE RXMH2 The enclosed draft of the subject Alert describes a problem encountered with your ccaapany's type RXMH2 relay by the Florida Power

& Light Caatpany at its Turkey Point Generating Station.

Fifteen working days from the date of this letter, the Alert will be sent to the Governtnent-Industry Data Excharge Program (GIDEP) offices for distribution to government and industry program participants.

As you may know, governlrent and irdustry organizations participate in GIDEP to exchange information on parts, components, materials, specifications, test equipment and safety problems.

GIDEP Alerts are issued to highlight significant problems of immediate general concern to GIDEP participants.

We solicit your ccaaments regarding the subject Alert. It is suggested that your reply address the following concento:

U l.

2 ~

3 ~

4, What was the root cause of the problem?

What corrective actions are being implemented to prevent recurrence of the problem?

What lots or date codes are affected?

Does the problem affect similar part types made by your company using the same manufacturing process?

Other companies?

Any written responses received within the fifteen working days will be included in the subject Alert submitted for distribution.

Responses submitted later will be distributed as an amerdmnt to the Alert. If you have any questions, I can be contacted at (301) 504-3221 and (301) 504-2260 (Fax).

Sincerely, Gregory C. Cwalina GIDEP Representative

Attachment:

GIDEP Alert BS5-A-92-01 (Draft) cc:

GIDEP Operations Center SEE PREVIOUS CONCtH%1XCE DISTRIBUTION:

Central Files VIB R/F

~rrholm PDR DRIS R/F OFC NAME:

DATE VIB/DRIS:

VIB/DRIS WHa ass GCwalina 3/10/91*

3/10/91*

3/ gg91 OFFICIAL RECORD COPY DOCUMENT'NAME:

A:

EGDPAL1M'204030274 920324 PDR ADOCK 05000250 I

UZUUgg t'09 ppg

~e I

r F

g 8 P

l

UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. Ci 20555

'~p,S Rfay~

Vp

+

O~

Cy

,j e March 24, 1992 Mr. Donald L. Jans, Vice President and General Manager ABB Power T&D Company, Inc.

Relay Division 4300 Coral Ridge Drive Coral Springs, Florida 33065

Dear Mr. Jans:

SUBJZXT:

PROPOSED AL1~ BS5-A-92-01 CONCIXNING PROBZZM WI'lH ABB RELAY TYPE RXNH2 lt

'lhe enclosed draft of the subject Alert describes a problem encountered with your company's type RXMH2 relay by the Florida Pmrer

& Light Company at its Turkey Point Generating Station.

Fifteen working days from the date of this letter, the Alert will be sent to the Government-Industry Data Exchange Program (GIDEP) offices for distribution to goverrmIent and industry program participants.

As you may knew, government and irdustry organizations participate in GIDEP to exchange information on parts, components, materials, specifications, test equipment and safety problems.

GIDEP Alerts are issued to highlight significant problems of immediate general concern to GIDEP participants.

We solicit your comments regarding the subject Alert. It is suggested that your reply address the following concerns:

1.

2 0 3.

4 ~

What was the root cause of the problem?

What corrective actions are being implemented to prevent recurrence of the problem?

What, lots or date codes are affected?

Does the problem affect similar part typm made by your company using the same manufacturing process?

Other coIIIpanies?

Any written responses received within the fifteen working days will be included in the subject Alert submitted for distribution.

Responses submitted later will be distributed as an amendment to the Alert. If you have any questions, I can be contacted at (301) 504-3221 and (301) 504-2260 (Fax).

GIDEP Representative

Attachment:

GIDEP Alert BS5-A-92-01 (Draft) cc:

GIDEP Operations Center

GOVERNMtNI+HOUSIRY OATA EXCHANGE PROGRAM ALERT please Type AN Informal>>on see Instruct>>ont on Reverse Porm Approved Olid Ncs 01044 I00 1L NOM ENCLA TURE puNic reporting burden for this collecuon ot intormauon is estunated to average 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> per respome. mduding the ume tor reviewing snstrucuons. searching exist>>ng data soiirces, 9athenng and m<<ntiunmg \\he >>tata needed. and completing and rewewing the collection of Information. send comments re9arding this)>>urden estimale or any other aspect ol thn collection ol information. including suggestions tor redunng this burden, to washington He<<souaners seniices, oirectorate lor Inlormat>>on operauons and Reports. 1)ss >>elle>>son oavis Highway. sune 1)04.A>>lington. vA )))0)A)0),and totheotficeof Management and 4udgel, paperworh Reductfpn protect (07044194).

washington.

OC )010). p>>ease oo Not RETURN your torm to either of these addresses.

I. NOMENCLATURE (pan>>starer>>al>>rrarard>>salary problems)

). ALERIISAIE ALERT No.

3. OATE (lear, Montls Oay) 4, IIANUIACTURERAHO ADDRESS S. NSN ABB Power T&D ~)3nyr inc.

4~ Coral Ridge Drive Coral Springs, H

%OS

6. PROCVREMEt>>T SPEC>>I ICATION N/A
0. MANVIACTVRER'S PART NVMRB1 R982 (AC or DC)

T. Rsf EREt>>CE

9. LOT/OATE COOE OR SENAL No
10. SPECIAL REOUiREMEHts 0R ENv>>lioNMENT (Requ>>remen>>I placed on. or eat>>erne env>>ronment to wruch item wal a>>posed)

'/A I l. PROBLEM SITUAT>>ON Ar>>o cAUSE (state Iactl ol prod>>eiii arid cause Ial>>ure mode 4nd meehan>>tm-protect and tune(ion)

Relay failed to change state up(m being energized during a ~raticmal test.

Zhiture M)s attzibuted to a ~rt circuit of the wirding at a point near the beginning lead of the coil due to inadequate placement of a separation tape used to hold the beginning lead in a charnel in the end flange of the coil spool.

2m ~x)se of the separatim tape is to hold the beginr~ lead in place to prevent abrasion fr(m the subs~

wir)dinIp during tho wirding process.

2m aanufacturer attributed the assembly problem to the lack of proper nanufacturing technique by cx)e factory employee.

I). ACTIOt>>s TA>>cEN isla>>e <>tuat>>on and to prevent itt recurrence)

Ig. ALERT/

SAPE ALERT No.

See attacI d)d resI)onse frcm the manufacturer.

I), OAIE MfR Hol>>fi(O (year, Montn. Oay)

14. MAHVIACTURERRESPONSE C3 CORRESPONOENCE ATTACHEO OIO NOT REPLV IS. CONTACT PoINts foR IHfoIUAAIION(Name, Atf>>dat>>on, Phone)

BillRogexs, USNRC (Xn} ~2C85

16. ALERl COORO>>HAlOR IName. Affiliation)

Gregory C. Cwctlina, USNRC DD Form 1938, FEB 90 Previous editions are obsolere.

17. SIGNATURE Of ALERT COOIIOINAIOR 64)>>094

V~,

(i e

5 el.