Notice of Violation from Insp on 920125-0228.Violation Noted:Failure to Maintain safety-related 4 Kv Switchgear in Seismically Qualified Configuration as Required by 10CFR50
ML17348B446
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/09/1992
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML17348B445 List:
References
50-250-92-03, 50-250-92-3, 50-251-92-03, 50-251-92-3, NUDOCS 9204010055
Download: ML17348B446 (4)


Text

ENCLOSURE 1

NOTICE OF VIOLATION Florida Power and Light Company Turkey Point, Units 3 and 4 Docket Nos. 50-250, 50-251 License Nos.

DPR-31, DPR-41 t

During an NRC inspection conducted on January 25 through February 28, 1992, a violation of NRC requirements was identified.. In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions,"

10 CFR Part 2, Appendix C (1991), the violation is listed below:

10 CFR 50, Appendix A, Criterion 2 requires structures,

systems, and components important to safety be designed to withstand-the effects of natural phenomena, such as earthquakes, without loss of capability to perform their safety function.

The Turkey Point Final Safety Analysis Report, paragraph 1.3, General Design Criteria, states that this section presents a brief description of related features which are provided to meet the design objectives-reflected, in the general design criteria.

Final Safety Analysis Report, paragraph 1.3.1, Overall Requirements (GDC 1-GDC 5), states that all systems and components designated Class 1 are designed so that there is no loss of capability to perform their safety function in the event of the maximum hypothetical seismic ground acceleration acting in the horizontal and vertical directions simultaneously.

Contrary to the above, the Class lE 4 kv switchgear was not designed to be seismically qualified with the breakers in the racked-out position and prior to October 10, 1991, there was no procedural requirement to restrain the breakers while in the racked-out position.

Also, breakers 3AA09, 3AA22, 3AB22, 4AA09, 4AA22 and 4AB22 were normally in a racked-out position which may have affected the Class 1E 4 kv switchgear during a seismic event.

This is a Severity Level IV violation (Supplement 1).

Pursuant to the provisions of 10 CFR 2.201, Florida Power and Light Company is hereby required to submit a written statement or explanation to the U.S.

Nuclear Regulatory Comnission, ATTN:

Document Control Desk, Washington, D.C.

20555, with a copy to the Regional Administrator, Region II, and a copy to the NRC Resident Inspector at the facility that is the subject of this notice, within 30 days of the date of the letter'transmitting this Notice of Violation-(Notice).

This reply should be clearly marked as a "Reply to a Notice of Violation"- and should include for each violation:

(1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results

achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the 9204010055 920309 PDR ADOCK 05000250 8

PDR

Florida Power and Light Company 2

Turkey Point, Units 3 and '4 Docket Nos. 50-250, 50-251 License Nos. DPR-31,'PR-41

, date when full compliance will be achieved.

If an adequate reply is not received within the time specified in this Notice, an order or demand for information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken.-,

Where good cause is shown, consideration will be given to extending the response time.

Dated at Atlanta, Georgia this 9th day of March 1992