Forwards Insp Repts 50-250/91-52 & 50-251/91-52 on 911228- 920124 & Notice of Violation.Nrc Concerned About Violation Because of Importance of Conducting Adequate pre-job Briefings in Order to Properly Anticipate Sys Problems
ML17348B424
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/20/1992
From: Sinkule M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17348B425 List:
References
NUDOCS 9203180144
Download: ML17348B424 (3)


See also: IR 05000250/1991052

Text

FEB 2O 1992

Docket Nos. 50-250,

50-251

License

Nos.

DPR-31,

DPR-41

Florida Power and Light Company

ATTN:

Mr. J.

H. Goldberg

President - Nuclear Division

Nuclear Energy Department

P. 0.

Box 14000

Juno

Beach,

FL

33408

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC

INSPECTION

REPORT

NOS. 50-250/91-52

and 50-251/91-52)

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

Mr.

R.

C.

Butcher of this office on

December

28,

1991,

through

January

24,

1992.

The inspection

included

a review of activities authorized for your

Turkey Point facility.

At the conclusion of the inspection,

the findings were

discussed

with those

members

of your staff identified in the

enclosed

Inspection

Report.

Areas

examined

during the inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

Based

on the results of this inspection,

certain of your activities appeared

to

be in violation of

NRC requirements,

as specified

in the enclosed

Notice of

Violation (Notice).

We are

concerned

about

the violation because

of the

importance

of conducting

adequate

pre-job briefings

in order to properly

anticipate possible

system

responses

or problems.

You are required to respond

to this letter

and should follow the instructions

specified

in the

enclosed

Notice

when

preparing

your response.

In your

response,

you should

document

the specific actions

taken

and

any additional

actions

you plan to prevent recurrence.

After reviewing your response

to this

Notice, including your proposed

corrective

actions

and the results

of future

inspections,

the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with

10 CFR 2.790 of the

NRC's

"Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

The responses

directed

by this letter

and the enclosed

Notice are not subject

to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork

Reduction Act of 1980,

Pub.

L. No. 96.511.

9203180144

920220

PDR

ADOCK 05000250

8

PDR

Florida Power and Light Company

FEB 20 1992

Should you have

any questions

concerning this letter,

please

contact us.

Sincerely,

ORfQtgpf gag@ p

~".<RYIN V'. QNKi4E

Marvin V.

S inkuTe, Chi ef

Reactor Projects

Branch

2

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

NRC Inspection

Report

cc w/encls:

K. N. Harris, Senior Vice President

Nuclear Operations

P. 0.

Box 14000

Juno

Beach,

FL

33408

T.

F. Plunkett, Site Vice President

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami,

FL 33102

R.

E. Grazio, Director

Nuclear Licensing

Florida Power

and Light Co.

P. 0.

Box 14000

Juno

Beach,

FL

33408-0420

L.

W. Pearce,

Plant General

Manager

Turkey Point Nuclear Plant

P.

0.

Box 029100

Miami, FL

33102

L.

W. Bladow, Site equality

Manager

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami,

FL

33102

E. J.

Weinkam, Licensing Manager

Turkey Point Nuclear Plant

P. 0.

Box 029100

Miami, FL

33102

Harold F. Reis,

Esq.

Newman

and Holtzinger,

P.C.

1615

L Street,

NW

Washington,

D.C.

20036

cc w/encls:

(Cont'd

on page

3)

Florida Power

and Light Company

3

(cc w/encls cont'd)

John T. Butler, Esq.

Steel,

Hector,

and Davis

4000 Southeast

Financial

Center

Miami, FL

33131-2398

Attorney General

Department of Legal Affairs

The Capitol

Tallahassee,

FL

32304

Jacob

Daniel

Nash

Office of Radiation Control

Department of Health

and

Rehabilitative Services

1317 Winewood Boulevard

Tallahassee,

FL

32399-0700

Jack

Shreve

Office of the Public Counsel

Room 4, Holland Building

Tallahassee,

FL

32304

Administrator

Department of Environmental

Regulation

Power Plant Siting Section

State of Florida

Twin Towers

2600 Blair Stone

Road

Tallahassee,

FL

32301

Joaquin

Avino

County Manager of Metropolitan

Dade County

111

NW 1st Street,

29th Floor

Miami,

FL

33128

Intergovernmental

Coordination

and Review

Office of Planning

and Budget

Executive Office of the Governor

The Capitol Building

Tallahassee,

FL

32301

State of Florida

bcc w/encls:

Rajender Auluck,

NRR

Document Control

Desk

K.

D. Landis, RII

R

.

P

RII

~~ ~0 199P

Ross

C. Butcher, Senior Resident

Inspector

U.S. Nuclear Regulatory

Commission

P. 0.

Box 1448

Homestead,

FL

33090

chin

02//92

KLa

s

02/1

/92