Text

ACCELERATED DISTRIBUTION DEMONSTPA,TION SYSTEM REGULA'Y INFORMATION DZSTRZBUTICYSTEM (RIDE)

ACCESSION NBR:9203020118 DOC.DATE: 92/02/28 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 50-335 St. Lucie Plant, Unit 1, Florida Power

& Light Co.

50-389 St. Lucie Plant, Unit 2, Florida Power

& Light Co.

AUTH.NAME AUTHOR AFFILIATION BOHLKE,N.H.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET 05000250 05000251 05000335 05000389

SUBJECT:

Forwards "Fitness for Duty Program Performance Data" for Jul-Dec 1991.

NOTES:

D DISTRIBUTION CODE:

A021D COPIES RECEIVED:LTR

[

ENCL 2 SIZE: /0 TITLE: "Semiannual Fitness for Duty Program Performance Rept/Data" 10CFR26.7

/

RECIPIENT ID CODE/NAME PD2-2 LA AULUCKFR INTERNAL: ACRS NUDOCS-ABSTRACT RGN2 02 COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-2 PD NORRIS,J NRR DRIS/RSGB FIL 01 COPIES LTTR ENCL 1

1 1

1 1

1 1

1 D

D EXTERNAL: NRC PDR 1

1 NSIC 1

1 D

NOTE TO ALL"RIDS" RECIPIENTS:

D D

PLEASE HELP US TO REDUCE WARM CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 11 ENCL 11

P.O. Box140, uno Beach, FL 33408-0420 FEB 28 1992 L-92-56 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.

C.

20555 Gentlemen:

Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 St. Lucie Units 1 and 2

Docket Nos.

50-335 and 50-389 Semi-Annual Fitness For Duty Pro ram Performance Data In accordance with 10 CFR 26.71(d),

please find attached the fitness-for-duty program performance data for the six (6) month period ending December 31, 1991.

Should you have any questions, please contact us.

Very truly yours, H. Bohlke Vice President Nuclear Engineering and, Licensing WHB/DMB Attachment cc:

Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant 9203020118 920228 PDR ADOCK 05000250 R

PDR an FPL Group company gp&i Cpg

E li,,

Fitness for Duty Program Performance Data Personnel Subject to 10 CFR Part 26 Company:

Florida Power and Light Location:

Turkey Point. Plant Reporting Period 6 months ending:

December 31,1991 Average Number with Unescorted Access for Reporting Period:

2619

Contact:

J.

G. West

Title:

Manager-Nuclear Security Phone:

(407) 694-4253 FAX (407) 694-5084 Screening Cutoff Levels (ng/ml)

Substance Screen Confirm Cutoff Levels Substance Cutoff Levels Screen Confirm Marijuana Cocaine Opiates 50 300 300 10 150 200 Amphetamines Phencyclidine Alcohol (TABAC) 300 25

. 04ro 500 25

. 04<a Test Results Licensee Employees Contractor Employees Categories Tested ¹ Pos.

¹ to Results EAP ¹ Access Restored

¹ Tested ¹ Pos.

¹ to Results EAP ¹ Access Restored Pre-Employment N/A N/A Pre-Badging Periodic 66 N/A 438 N/A

, 0 For Cause 20 Post Accident Random Follow-up 836 19 801 Other

'/A N/A Total 922 1264 12 NOTE All confirmed positive test results were above DHHS/HRC confirmation cutoff levels.

~I I'

Turkey Point Plant Pre-Badging Testing Program Results Test Year 1989 1990 1991 1992 1993 Number of Individuals Tested Number of Positive Tests 4 Positive N/A N/A 2030 N/A N/A 42 N/A N/A 2.07l 1874 1790 20 30

l. 07< 1. 67%

504

.79%

Graph of 4 Positive Confirmed Positive Tests for Specific Substances Substance Marijuana Cocaine Opiates Amphetamines Barbiturates Alcohol Refusal to Test 1989 1990 N/A N/A

'N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 27 N/A N/A 12 12 1991 17 10 1992 1993

~ ~

ll

Turkey Point Plant Random Testing Program Results Test Year Number of Tests Conducted Number of Positive Tests 1989 N/A N/A N/A N/A 1990 2033 2042 20 1991 2141 1637 15 1992 1993 4 Positive N/A N/A

.984

.39%

.704

.24%

Graph of 4 Positive Confirmed Positive Tests for Specific Substances it Substance Marijuana Cocaine 1989 N/A N/A N/A N/A 1990 10 1991 1992 1993 Opiates Amphetamines Barbiturates Alcohol Refusal to Test N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

~ >

~

~

MANAGEMENT ACTIONS TURKEY POINT PLANT An NRC Fitness for Duty inspection was conducted at Turkey Point in September of 1991 and resulted in no violations.

A previous inspector follow-up item from the St. Lucie inspection regarding insufficient weekend testing was closed out during this inspection.

2 ~

During this reporting

period, Roche Biomedical Laboratories issued two false negative
test, results for blind specimens submitted by the Turkey Point Plant.

One incident resulted from a

transcription error and the other from an improper identification of an accession number.

Although Roche s false negative rate of l.5% for 1991 is well below the 10% error rate allowed by the Department of Health and Human Services standards for NIDA certification, they were instructed to take steps to eliminate the type of human errors which caused these false negatives.

3 ~

FFD Reportable Events for 1991 Turkey Point Plant 3.1 On July 11, 1991, in response to an anonymous allegation, a contractor supervisor was given a for-cause-test and was confirmed positive for alcohol at.04 BAC.

The individual stated that he had not consumed alcohol within the Protected Area of the plant.

The individual's unescorted access to the site was revoked.

3.2 On August 6,

1991, in response to observed
behavior, a

contractor supervisor was given a for-cause-test and was confirmed positive for alcohol at.07 BAC.

The individual had not yet been given unescorted access to the site and his access was denied.

5

5 3 '

On August 9,

1991, in response to observed
behavior, a

contractor supervisor was given a for-cause-test and tested positive for alcohol at

.09 BAC.

The individual "was detected while attempting to gain access to.the site and had not consumed alcohol within the Protected Area of the plant.

His unescorted access to the site was revoked.

U 3.4 On September 17, 1991, in response to observed behavior, a

licensee supervisor was given a for-cause-test and tested positive for alcohol at

.07 BAC.

The individual was detected while attempting to gain access to the site and

.had not consumed alcohol within the Protected Area of the site.

The individual's unescorted access to the site was suspended and was later

- restored after completion of a

rehabilitation program.

0 o

Fitn~ for Duty Program Perform~e Data Personnel Subject to 10 CFR P~

26 Company:

Florida Power and Light Reporting Period 6 months ending:

December 31,1991 Location:

St. Lucie Plant Average Number with Unescorted Access for Reporting Period: '124

Contact:

J.

G. West

Title:

Manager-Nuclear Security Phone:

(407) 694-4253 FAX (407) 694-5084 Screening Cutoff Levels (ng/ml)

Cutoff Levels Cutoff Levels Substance Marijuana Cocaine Opiates Screen 50 300 300 Confirm 10 150 200 Substance Amphetamines Phencyclidine Alcohol (TABAC)

Screen 300 25

. 04>o Confirm 500 25

. 04<o Test Results Licensee Employees Contractor Employees Categories Tested g Pos.

g to Results EAP g Access Restored Tested g Pos.

g to Results EAP g Access Restored Pre-Employment N/A N/A Pre-Badging Periodic For Cause 66 N/A 1273 N/A 12 Post Accident Random Follow-up Other 700 14 N/A 465 N/A Total 780 1750 15 NOTE:

Alt confirmed positive test results Mere above DHHS/HRC confirmation cutoff levels.

St. Lucie Plant

~

~

IB

St. Lucie Plant Pre-Badging Testing Program Results Test Year Number of Individuals Tested 1989 N/A N/A 1990 1589 1233 1991 262 1339 1992 1993 Number of Positive Tests N/A N/A 44 21 12

% Positive N/A N/A 2.774 1.70>

1 ~ 15+0

~ 894 Graph of 4 Positive Confirmed Positive Tests for Specific Substances Substance Marijuana Cocaine Opiates Amphetamines Barbiturates 1989 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 1990 26 12 1991 0

5 0

5 0

0 1992 1993 Alcohol Refusal to Test N/A N/A N/A N/A 0

1

St. Lucie Plant Random Testing Program Results

~

~

Test Year

. Number of Tests Conducted 1989 N/A N/A 1990 1392 818 1991 956 1165 1992 1993 Number of Positive Tests Positive N/A N/A N/A N/A

.434

.49%

~ 314

. 174 Graph of

% Positive Confirmed Positive Tests for Specific Substances Substance Marijuana Cocaine 1989 N/A N/A N/A N/A 1990 1991 0

1992 1993 Opiates Amphetamines Barbiturates Alcohol Refusal to Test N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

I

~ ~

Cq II v i4

MANAGEMENT ACTIONS ST.

LUCIE PLANT During the second half of 1991, the St Lucie Plant Fitness for Duty, Program continued to meet all regulatory requirements as well as FPL Nuclear Division objectives.

There were no reportable events for the St Lucie FFD Program during this period and management actions pertaining to NRC inspections and false negative test results are covered in the Turkey Point Plant report.