L-92-012, Forwards ISI Summary Rept,Second Interval,Third Period, First Outage (1991)

From kanterella
(Redirected from ML17348B354)
Jump to navigation Jump to search
Forwards ISI Summary Rept,Second Interval,Third Period, First Outage (1991)
ML17348B354
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 01/27/1992
From: Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17348B355 List:
References
L-92-012, L-92-12, NUDOCS 9202030140
Download: ML17348B354 (4)


Text

i.,+,CELERATED DI YRIBUTION DEMONS TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9202030140 DOC.DATE: 92/01/27 NOTARIZED:

NO FACIL:50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION PLUNKETT,T.F.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET 77 05000251 RECIPIENT ID CODE/NAME PD2-2 PD

SUBJECT:

Forwards five repts in accordance w/provisions of this requirement.

g OO DISTRIBUTION CODE:

A047D COPIES RECEIVED:LTR J ENCL SIZE:

l ~

TITLE: OR Submittal: Inservice Inspection/Testa.ng/Relic from ASME Code NOTES:Q~g~PDf f$

RECIPIENT COPIES COPIES ID. CODE/NAME LTTR ENCL LTTR ENCL PD2-2 LA 1

0 1

1 AULUCK,R 2

2' D

INTERNAL: NRR/DET/ECMB 9H

'NUDOCS-ABSTRACT

'OGC/HDS3 RES/DSIR/EIB EXTERNAL: EG &G BROWN, B NRC PDR NRR/DET/EMEB 7E OC/LFMB EG&G RANSOME,C NSIC 1

1 1

0 1

1 1

1 1

1 D

8 R

D NOTE TO ALL"RIDS" RECIPIENTS:

D D

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 15 ENCL 12

igi i

Iy)

)V t

'I

APL

.0. Box 029100, Miami, FL, 33102-9100 JAN z 1 issz L-92-012 10 CFR 50.55a U.

S' Nuclear Regulatory Commission Attn:

Document Contro'l Desk Washington, DE C ~

20555 Gentlemen:

Re:

Turkey Point Unit 4

Docket No ~ 50-251 Inservice Ins ection Re ort ASME Code,Section XI, (IWA-6230) requires. that Inservice Inspection (ISI)

Summary Reports be submitted within 90 days of completion of ISI conducted during a refueling outage,.

Please find attached the reports listed below, in accordance with the provisions of this requirement.

Form NIS-1 Owners'ata Report for Inservice Inspections.

Form NIS-. BB Owners'eport for Eddy Current Examination

Results,

~

Form NIS-.2 Owners'eport for Repairs and Replacements..

Summary Report of Visual Examination and Functional Testing of 'Snubbers

~

Summary.of Inservice Inspection Examinations.

Should there be any questions concerning this report, please contact us

~

Very truly yours, T ~

F

~ Plunkett Vi.ce President Turkey Point Nuclear TFP/RJT/rt Attachments cc:

Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspectorr

'USNRCg Turkey: Point Plant 9202030140'20127 PDR ADOCK '05000251 PDR uu Fpl. Group comp>>Y

ll Il y>>l

~~g r S,g r

C~

I