L-92-012, Forwards ISI Summary Rept,Second Interval,Third Period, First Outage (1991)

From kanterella
(Redirected from L-92-012)
Jump to navigation Jump to search
Forwards ISI Summary Rept,Second Interval,Third Period, First Outage (1991)
ML17348B354
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 01/27/1992
From: Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17348B355 List:
References
L-92-012, L-92-12, NUDOCS 9202030140
Download: ML17348B354 (4)


Text

i.,+,CELERATED DI YRIBUTION DEMONS TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9202030140 DOC.DATE: 92/01/27 NOTARIZED:

NO FACIL:50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION PLUNKETT,T.F.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET 77 05000251 RECIPIENT ID CODE/NAME PD2-2 PD

SUBJECT:

Forwards five repts in accordance w/provisions of this requirement.

g OO DISTRIBUTION CODE:

A047D COPIES RECEIVED:LTR J ENCL SIZE:

l ~

TITLE: OR Submittal: Inservice Inspection/Testa.ng/Relic from ASME Code NOTES:Q~g~PDf f$

RECIPIENT COPIES COPIES ID. CODE/NAME LTTR ENCL LTTR ENCL PD2-2 LA 1

0 1

1 AULUCK,R 2

2' D

INTERNAL: NRR/DET/ECMB 9H

'NUDOCS-ABSTRACT

'OGC/HDS3 RES/DSIR/EIB EXTERNAL: EG &G BROWN, B NRC PDR NRR/DET/EMEB 7E OC/LFMB EG&G RANSOME,C NSIC 1

1 1

0 1

1 1

1 1

1 D

8 R

D NOTE TO ALL"RIDS" RECIPIENTS:

D D

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 15 ENCL 12

igi i

Iy)

)V t

'I

APL

.0. Box 029100, Miami, FL, 33102-9100 JAN z 1 issz L-92-012 10 CFR 50.55a U.

S' Nuclear Regulatory Commission Attn:

Document Contro'l Desk Washington, DE C ~

20555 Gentlemen:

Re:

Turkey Point Unit 4

Docket No ~ 50-251 Inservice Ins ection Re ort ASME Code,Section XI, (IWA-6230) requires. that Inservice Inspection (ISI)

Summary Reports be submitted within 90 days of completion of ISI conducted during a refueling outage,.

Please find attached the reports listed below, in accordance with the provisions of this requirement.

Form NIS-1 Owners'ata Report for Inservice Inspections.

Form NIS-. BB Owners'eport for Eddy Current Examination

Results,

~

Form NIS-.2 Owners'eport for Repairs and Replacements..

Summary Report of Visual Examination and Functional Testing of 'Snubbers

~

Summary.of Inservice Inspection Examinations.

Should there be any questions concerning this report, please contact us

~

Very truly yours, T ~

F

~ Plunkett Vi.ce President Turkey Point Nuclear TFP/RJT/rt Attachments cc:

Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspectorr

'USNRCg Turkey: Point Plant 9202030140'20127 PDR ADOCK '05000251 PDR uu Fpl. Group comp>>Y

ll Il y>>l

~~g r S,g r

C~

I