Girl=I.",'ALCopy JUN 2 8 1991 NOTICE OF SIGNIFICANT MEETING Name of Licensee:
Florida Power and Light Company Name of Facility:
Turkey Point Units 3 and 4
Docket Numbers:
50-250 and 50-251 Date and Time of Meeting:
July 10, 1991, at 9:30 a.m.
Location of Meeting:
Turkey Point, Florida City RII Cognizant Division:
Division of Reactor Projects Purpose of Meeting:
To review Turkey Point restart readiness.
NRC Attendees:
S.
D. Ebneter, Regional Administrator, Region II (RI.I)
E.
W. Merschoff, Deputy Director, Division of Reactor Projects (DRP), RII H. N. Berkow, Director, Project Directorate II-2, Office of Nuclear Reactor Regulation (NRR)
R. Auluck, Licensing Project Manager, Turkey Point, NRR R.
C. Butcher, Senior Resident Inspector, Turkey Point, DRP, RII G. A. Schnebli, Resident Inspector, Turkey Point, DRP, RII L. Trocine, Resident Inspector, Turkey Point, DRP, RII A. F. Gibson, Director, Division of Reactor Safety (DRS), RII C. A. Julian, Chief, Engineering
- Branch, DRS, RII N.
D. Hunt, Reactor Inspector, Plant Systems
V. Crlenjak, Chief, Reactor Projects Section 2B, DRP, RII C.
R. Ogle, Project Engineer, DRP, RII Licensee Attendees:
K. N. Harris, Senior Vice President, Nuclear Operations T.
F. Plunkett, Site Vice President W. H. Bohlke, Vice President, Nuclear Engineering and Licensing J.
E. Geiger, Vice President, Nuclear Assurance V. A. Kaminskas, Operations Superintendent N. B. Wayland, Maintenance Superintendent F.
R. Timmons, Site Security Superintendent S. T. Hale, Engineering Project Supervisor L.
W. Bladow, guality Manager D.
R. Powell, Superintendent, Plant Licensing A. T. Zielonka, Technical Department Supervisor R. J. Daly, Outage Manager L. C. Huenniger, Startup Superintendent R.
E. Grazio, Director, Nuclear Licensing L.
W. Pearce, Plant Manager 9i07i60229 9i0628 PDR
- DOCK 05000250 P
PDR i g8/ '4D
Notice of Significant Meeting JUN 2 8 1991 J.
B. Hosmer, Director, Nuclear Engineering D. Tomaszewski, Outage Management K. E. Beatty, Training Superintendent H. H. Johnson, Operations Supervisor J.
D. Webb, Assistant Superintendent, Planning and Scheduling G. Salamon, Supervisor, Licensing NOTE:
Attendance by NRC personnel at the NRC/Licensee meeting should be made known by 4:00 p.m., July 8, 1991, via telephone call to R.
P.
- Schin, FTS:
841-5561.
Distribution:
Approved by:
Richard V. Crlenkjak, Chief Projects Section 2B Division of Reactor Projects J. Sniezek, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research J.
G. Partlow, Associate Director for Projects, NRR H. L. Thompson, Jr.,
Deputy Executive Director for Nuclear Materials Safety and Safeguards and Operations Support T.
E. Murley, Director, Office of Nuclear Reactor Regulation S. A. Varga, Director, Division of Reactor Projects I/II, NRR H.
N. Berkow, Director, Project Directorate II-2, NRR J.
F. Wechselberger, Regional Coordinator, EDO R. Auluck, Project Manager, NRR bcc:
S.
D. Ebneter J. L. Milhoan J.
P. Stohr A. F. Gibson L. A. Reyes R. J.
Maley G.
R. Jenkins All NRC Attendees K.
M. Clark NRC Resident Inspector document Control Room R
'DRP gl e 06/~/91 R I'DRP c ln 06/~/91 RI 'P lenjak 06/W/91 RI IDRP MSinkule 06gg /91