Forwards Request for Addl Info Re Reactor Protection Sys Setpoints
ML17348A930
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/06/1991
From: Rajender Auluck
Office of Nuclear Reactor Regulation
To: Goldberg J
FLORIDA POWER & LIGHT CO.
References
TAC-79402, TAC-79403, NUDOCS 9106110288
Download: ML17348A930 (6)


Text

Docket'os.

50-250 and 50-251 Mr. J.

H. Goldberg President - Nuclear Division Florida Power and Light Company P.O.

Box 14000 Juno Beach, Florida 33408-0420

Dear Mr. Goldberg:

June 6, 199l DISTRIBUTION (Docket File

,/

NRC 6 LPDRs PD22 Rdg file SVarga GLainas HBerkow DMiller RAuluck OGC EJordan MNBB-3701 ACRS(10)

MSinkule RII JMauck 8/H/3

SUBJECT:

TURKEY POINT UNITS 3 AND 4 - REQUEST FOR ADDITIONAI INFORMATION ON REACTOR PROTECTION SYSTEM SETPOINTS (TAC NOS.

79402 AND 79403)

The purpose to this letter is to request additional information regarding the reactor protection system (RPS) setpoints.

The staff has reviewed your submittals in support of RPS setpoints and has identified that additional information is needed.

The questions are described in the enclosure and were discussed by telephone with your staff on May 6, 1991.

We request that you provide the responses by June 14,

1991, so that the staff can complete its review in a timely manner.

This requirement affects fewer than 10 respondents, and therefore, is not subject to Office of Management and Budget review under P.I.96-511.

Any questions you may have concerning the enclosure should be directed to me.

Sincerely,

Enclosure:

As stated cc w/enclosure:

See next page Original signed by Rajender Auluck, Sr. Project Manager Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation OFC

LA'PD "2
PM:PDII"2
SICB I"2 NAME:D '

DATE

06/

/91

06/0 /91
06/5 /91 ow
0 /$ /91 OFFICIAL RECORD COPY Document Name:

RAI TURKEY PDR ADOOK 05000250 gmg Pg g gfp~(ttft~l

~

'I

l*

Mr. J.

H. Goldberg Florida Power and Light Company Turkey Point Plant CC:

Harold F. Reis, Esquire Newman and Holtzinger, P.C.

1615 I, Street, N.W.

Washington, DC 20036 Jack Shreve, Public Counsel Office of the Public Counsel c/o The Florida Legislature

11) West Madison Avenue, Room 812 Tallahassee, Florida 32399-1400 John T. Butler, Esquire
Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr. Thomas F. Plunkett, Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 Joaquin Avino County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission Post Office Box 1448 Homestead, Florida 33090 Mr. Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Intergovernmental Coordination and Review Office of Planning 6 Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 Mr. R. E. Grazio Director, Nuclear Licensing Florida Power and Light Company P.O.

Box 14000 Juno Beach, Florida 33408-0420

r

~ 'I4v 4

I l

r" ENCLOSURE RE UEST FOR ADDITIONAL INFORMATION REACTOR PROTECTION SYSTEM SETPOINTS (1)

Has FPL verified that the bases document used by Westinghouse to determine the instrument allowances (uncertainties) is correct and applicable to Turkey Point as configured?

In addition, please provide the following:

a.

What are the inputs for the bases document?

b.

Were there any "generic" allowance (uncertainty) values used by Westinghouse when plant-specific information was not available or not based on Turkey Point specifications and procedures?

If so, what confidence level does FPL have that these values reflect (or bound) the as-configured condition of the plant?

c.

Are the allowance (uncertainty) values used applicable and conservative with respect to the as-configured plant' (2)

Recently approved Amendments 135 and 140 approved specific values in the OTbT and OPbT equations (table notes 1,3).

The amendment under current review proposes some of those values in a different form, i.e, from note 1:

proposed p~

R 2235 I

from note 3:

prop'osed K4 5 1.09 K

>.02/

F t(Tau)7 R 10 secs.

Are these new proposed values conservative (in the conservative direction) with respect to the existing TS (Amendments 135 and 140)?

v N

~

L'