L-90-461, Forwards Turkey Point Simulator Initial Certification, Vol 1 & Turkey Point Simulator Initial Certification, Vol 2
| ML17348A799 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 01/02/1991 |
| From: | Plunkett T FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17348A800 | List: |
| References | |
| L-90-461, NUDOCS 9101080141 | |
| Download: ML17348A799 (6) | |
Text
ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR: 9101080141 DOC. DATE: 91/01/02 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light, C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION PLUNKETT,T.F.
Florida Power S Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOCKET g
05000250 05000251
SUBJECT:
Forwards "Turkey Point Simulator Initial Certification," Vol 1
6 "Turkey Point Simulator Initial Certification," Vol 2.
DISTRIBUTION CODE: A005D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Simulator Facility Certification NOTES:
l Po RECIPIENT ID CODE/NAME INTERNAL: CE~
FIL N
LPQ/*LO'@310 EXTERNAL: NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 RECIPIENT ID CODE/NAME IRM MCKNIGHT,J.
COPIES LTTR ENCL 1
0 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P l-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 4
ENCL 3
P.. Box 029100, Miami, FL, 33102-9100 JAN 0 2 ]ggi L-90-461 10 CFR 55. 45 (b)
Director of Nuclear Reactor Regulation U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555 Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 10 CFR 55.45 "Certification of Plant-Referenced Simulator" Gentlemen:
10 CFR 55.45(b) (5) (i) requires licensees to certify via NRC Form 474, that the simulation facility meets the Commission's regulations.
Enclosed is Florida Power and Light Company's submittal for certifying the Turkey Point Units 3
and 4 simulator as a plant referenced simulator per 10 CFR 55.45(b).
Included in this submittal is a
completed, signed NRC Form 474 for each unit, and two volumes of information to support this submittal.
The Certification submittal is organized into two volumes.
Volume I contains the Certification submittals for Turkey Point Units 3 and 4.
The Unit 3 section of Volume I is organized in a manner similar to ANSI/ANS 3.5-1985, Appendix A,
Guide for Documenting Simulator Performance.
The Unit 4 section of Volume I references the Unit 3
Certification submittal and analyzes the differences between the two units.
Volume II contains the abstracts of the Simulator Certification Tests which were performed to verify that the Turkey Point simulator operates in accordance with ANSI/ANS 3.5.
Table 0-1 of Volume I provides a cross-reference between ANSI/ANS 3.5 sections and the sections of this submittal.
10 CFR 55.45 (b)(5)(ii) requires that licensees "submit, every four years on the anniversary of the certification, a
report to the Commission which identifies any uncorrected performance test failures."
Also 10 CFR 55.45 (b) (5) (vi) requires the submittal of "a schedule for the conduct of approximately 25 percent of the performance tests per year for the subsequent four years."
Section 3.0 of Volume I presents the Test Plan that will be implemented to comply with these requirements.
Should there be any questions, please contact us.
Very truly yours, T ~ F. Plunkett Vice President Turkey Point Plant Nuclear TFP/RJT/rjt Attachments (4) cc:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspectors USNRCI Turkey Point Plant
- US Ng,(ocument Contro1 Desk w3 PDO<
NRC FORM 474 (14)0)
'55,4 and 55)5 U.S. NUCLEAR REGULATORYCOMMISSION SIMULATION FACILITYCERTIFICATION APPROVED BY OMB: NO. 3)504))3B EXPIRES: 0304)2 ESTIMATED BURDEN PER
RESPONSE
TO COMPLY WITH THIS INFORMATION COLLECTION REGUEST:
120 HRS. FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE INFOR.
MATION AND RECORDS MANAGEMENT BRANCH (MNBB 7714)
U.S.
NUCLEAR REGULATORY COMMISSION, WASHINGTON, Dd 20555, AND TO THE PAPERWORK REDUCTION PROJECT l3150.
0138), OFFICE OF MANAGEMENT AND BUDGET, WASHINGTON, OC 20503.
INsTRUGTIONS. This form is to be fihd for initial certification, racertification (ifrequired), and for any change to a simulation facility performance testing plan made after initial submittal of such a plan. Provide the following information, and check the appropriate box to indicate reason for subminal.
FACILITY TURKEY POINT NUCLEAR GENERATING UNIT NUMBER 3 LICENSEE FLORIDA PO'IVER AND LIGHT COMPANY DOCKET NUMBER
- 50. 250 DATE 12/31/90 This is to certify that:
The above named facility licensee is using a simulation facilityconsisting solely of a p)ant-referenced simulatorthat meets the requirements of 10 CF R 55.45.
2.
Documentation is available for NRC review in accordance with 10 CFR 55.45(b).
3.
This simulation facility meats the guidance contained in ANSI/ANS3 5, 1085, as endorsed by NRC Regulatory Guide 1.149.
Ifthere are any exceptions to the certification of this item, check hare
( Aj and describe fullyon Nlditional pages as necessary.
NAME (or ocheridencificeclonJ AND LOCATIONOF SIMULATIONFACILITY TURKEY POINT SIMULATOR 9>- MILES EAST OF FLORIDA CITY ON PALM DRIVE FLORIDA CITYr FLORIDA 33034 SIMULATIONFACILITYPE R F OR M ANCE TEST ABSTRACTS ATTACHED.(Forperfonnance casts conductedin the period end/ng with the dace ofthis can/fleer/on/
DESCRIPTION OF PERFORMANCE TESTING COMPLETED (Attach additional pagels/ as necessary, and identifythe irem descript(on being continued/
SEE ATTACHED DOCUMENT SIMULATIONFACILITYPERFORMANCE TESTING SCHEDULE ATTACHED. (For rhe conduct ofapproxlnxrcely 25% ofperformance tears per year forthe four yaer period commencing with the date ofthis cart(((cat/on J DESCRIPTION OF PERFORMANCE TESTING TO BE CONDUCTED, (Attach addnional page(sJ as necessary, and ident/fy che irem description being continued J SEE ATTACHED DOCUMENT PERFORMANCE TESTING PLAN CHANGE. (For any modification to a perfonnance tasting plan submitted on a previous certificationJ DESCRIPTION OF PERFORMANCE TESTING PLAN CHANGE (Attach add/tfona/page(sJ as necessary, and Identify the /tern descript/on being conc(nued/
INITIALCERTIFICATION NOT APPLICABLE R ECERTIF ICATION (Decor(be conect(reactions taken, attach resuks ofcomp/aced perfonnance testing in acconfance with ID CFR g 6545(bJ(5//r/,
Attach addhiona/page(sJ as necessary, and identify the Item deter(pt(on being continued /
INITIALCERTIFICATION NOT APPLICABLE Any false statement or omission in this document, including attachments, may be subject to c)vil and criminal sanctions.
I certify under penalty of perjury that the fnformation fn this document and attachments h true and correct.
SIGNATURE-AUTHORIZEDREPRESENTATIVE TITLE VICE PRESIDENT TURKEY POINT JAN 0 2 19gl In accordance with 10 cFR (I 555;communicat)ons, this form shall be submitted to the NRc as follows:
BY MAILADDRESSED TO: Director,Offkeof Nuchar Reactor Regulation BYDELIVERYIN PERSON One Wh)ta Flint North UA. Nuchar Reguhtory Commfsshn TO THE NRC OFF ICE AT:
11666 Rockvllh Pike Washington, DC 20566 Rockvllh, MD NRC FORM 474 (140)
I II al II LI II II
NRC FORM 474 (14>0>
>0 CFR 55AS(bl, S5.4 ux> ESB U.S. NUCLEAR REGULATORYCOMM(BE(ON SIMULATION FACILITY CERTIFICATION APPROVED BY OMB> NO. 3>500>38 EXPIRES: 90042 ESTIMATED BURDEN PER
RESPONSE
TO COMPLY WITH THIS INFORMATION COLLECTION REQUEST:
120 HRS. FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE INFOR.
MATION AND RECORDS MANAGEMENT BRANCH (MNBB 77>a>,
U.S.
NUCLEAR REGULATORY COMMISSION, WASHINGTON, OC
- 20555, ANO TO THE PAPERWORK REDUCTION PROJECT (3150 0138>, OFFICE OF MANAGEMENT ANO BUDGET, WASHINGTON.
OC 20503.
INSTRUCTIONS. This form Is to be filed for Initial cert((ical(on, rcccrti(ication Iifrequired), and for any change to a simulation feei(ity performance test(ng plan made after Initial subm(Ital of such a plan. Piovida the following information, and check the appropriate box to indicate reason for subminal.
FACILITY TURKEY POINT NUCLEAR GENERATING UNIT NUMBER 4
DOCKET NUMBER BG. 251 LICENSEE FLORIDA POWER AND LIGHT COMPANY DATE 12/31/90 This is to certify that:
1.
The above named facilitylicensee is using a simulation (acilityconsisting solely of a plant referenced simulator that meets the requirements of 10 CF R 55.45.
2.
Documentation is available for NRC review in accordance with 10 CFR 55.45(b).
3.
This simulation facilitymeets the guidance contained in ANSI/ANS3.5, ISBS, as endorsed by NRC Regulatory Guide 1.149.
Ifthere are any exceptions to the certification of this item, check here
( XI and describe fullyon additional pages as necessary.
NAME (or other identification/ AND LOCATIONOF SIMULATIONFACILITY TURKEY POINT SIMULATOR 9E MILES EAST OF FLORIDA CITY ON PALM DRIVE FLORIDA CITY, FLORIDA 33034 X
SIMULATIONFACILITYPERFORMANCE TEST ABSTRACTS ATTACHED.(Forperformance rests condiicredin the period ending with the dare ofthis ceirlf/car/on J 0 ESCR IPTION OF PERFORMANCE TESTING COMPLETED (Arrach afditiona/pape(sJ ss necessary, and identifythe hem description beinp continued J SEE ATTACHED DOCUMENT SIMULATIONFACILITYPERFORMANCE TESTING SCHEDULE ATTACHED. (For the conduct ofapprox/mately 25% ofperfonnance teas per year forthe lour year period commencing with the date ofthis catlficsrlonJ DESCRIPTION OF PERFORMANCE TESTING TO BE CONDUCTED, fAttach afdiriona/pape(sJ as necessary, and Identify the nem descrlprlon be/np cont/nued J SEE ATTACHED DOCUMENT pEAFOAMANCE TESTING PLAN CHANGE. (For any mod/f/cation ro s perfonnance resrinp p/an submirraf on a pniv/ous cert/fiarr/on/
DESCRIPTION OF PER FOA MANGE TESTING PLAN CHANGE (Attach afdirionalpape(sJ ss necessary, snd identify the iten descripr/on being conrlnuedJ-INIT.IAL CERTIFICATION NOT APPLICABLE AE CERT( F ICATION (Dascr/be conective actions taken, attach resuks ofcompleted perfonnance testing In accordance with 70 CFR (I 55 45(bJ(5JlvJ.
Attach addn/one/pape(sJ as necessary, snd identifythe iran descript(on beinp contlnuaf J INITIALCERTIFICATION NOT APPLICABLE Any fake statement or omission in this documern, including attachments, may be subject to civilsnd criminal sanctions.
I certify under penahy of perjury that the information in thb document snd attachments B true and correct.
SIGNATURE AUTHORIEED AEPRESENTATIVE TITLE DATE VICE PRESIDENT TURKEY POINT JAN 0 2 1991 In accordance with 10 CFR 55$, Communications, this form shall be submitted to the NAGas foliowra BY MAILADDRESSED TO:
Director, Of(he of Nudur Reactor Regu(st(on BY DELIVERYIN PERSON One White Fl(nt North U4. Nut(ear Regu(story Commlssk>n TO THE NRC OFFICE AT:
11666 Rocks(lie Pike Washington, DC 20666 Rocks(((e, ILlD NRC FORM 474 (14>0)
1 I [
h I
I I
% P