Discusses Clarification of Relief from Reactor Coolant Pump Exam.Relief from Exam Requirements Appropriate & Acceptable
ML17348A787
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/20/1990
From: Berkow H
Office of Nuclear Reactor Regulation
To: Goldberg J
FLORIDA POWER & LIGHT CO.
References
TAC-77074, TAC-77075, NUDOCS 9012310049
Download: ML17348A787 (4)


Text

December 20, 1990 Docket Nos.

50-250 and 50-251 Mr. J.

H. Goldberg President - Nuclear Division Florida Power and Light Company P.O.

Box 14000 Juno Beach, Florida 33408-0420

Dear Mr. Goldberg:

DISTRIBUTION NRC 5 LPRDs PD22 Rdg File TMurley/FMiraglia JPartlow 12/G/18 CRossi 11/E/4 SVarga GLainas DMiller GEdison HBerkow MSinkule RII ACRS (10)

GPA/PA 12/G/18 OC/LFMB RBorchardt, 17/G/21 CYCheng 7/D/4 RHermann 7/D/4 DSellers 7/D/4 RButcher RII RCrlenjak RII

SUBJECT:

TURKEY POINT UNITS 3 AND 4 - CLARIFICATION OF RELIEF FROM REACTOR COOLANT PUMP EXAMINATION (TAC NOS.

77074 AND 77075)

The purpose of this letter is to clarify relief granted from examination requirements for welds and internal surfaces of reactor coolant pumps (RCPs) at Turkey Point Unit Nos.

3 and 4 in a letter dated October 17, 1990.

The staff's Safety Evaluation concluded that the relief from the examination requirements was appropriate and acceptable to the NRC staff and added that the licensee will perform a surface examination of a portion of the casing welds during the inspection interval.

The staff's understanding is that the licensee will perform a visual examination of the internal surfaces whenever a

pump is disassembled for maintenance.

This was part of the alternate examination requirements for Cast Austenitic Pump Casings included in the Code Case N-481, which was approved by ASME on March 5, 1990.

If you have any questions, please call Raj Auluck, Project Manager, at (301) 492-1480.

Sincerely, (Original Signed By)

Herbert N. Berkow, Director Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc:

See next page

  • See Previous Concurrence NAME DATE
/~/90

~

~

uck:kdj

RHermann*

0 WW

/90

12/20/90 ocumen arne:
GEdl

~

~

~

~

HB r
gfgo/90 gg00+9 90i220 PDR ADOCK 0500>DR p

I pe I,

P t

Mr. J.

H. Goldberg Florida Power and Light Company Turkey Point Plant CC:

Harold F. Reis, Esquire Newman and Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 John T. Butler, Esquire

Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr. Thomas F. Plunkett, Site Vice President Turkey Point'uclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission Post Office Box 57-1185 Miami, Florida 33257-1185 Mr. Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Tal 1 ahassee, Florida 32399-0700 Intergovernmental Coordination and Review Office of Planning

& Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of F'lorida 2600 Blair Stone Road Tallahassee, Florida 32301 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street,,

N.W. Suite 2900 Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Tallahasse, Florida 32304 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102