ML17348A532
| ML17348A532 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 08/28/1990 |
| From: | Berkow H Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17348A533 | List: |
| References | |
| NUDOCS 9009050245 | |
| Download: ML17348A532 (8) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 FLORIDA POWER AND LIGHT COMPANY DOCKET NO. 50-250 TURKEY POINT PLANT UNIT.NO.
3 AHENDMENT TO FACILITY OPERATING LICENSE Amendment No.
137 License No.
DPR-31 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Florida Power and Light Company (the licensee) dated June 5, 1989, as supplemented July 12, 1989,,
November 3, 1989, February 13, 1990, May 1, 1990, June 21, 1990 and July 20, 1990, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
90082 2~<0 0<0 pQC--
90090 >gQC(
pog
~ %
- t. tI IJ
e 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.8 of Facility Operating License No. DPR"3l is her eby amended to r ead as follows:
(8)
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 137, are hereby incorporated in the license.
The Environmental Protection Plan contained in Appendix 8 is hereby incorporated into the license.
The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of issuance.
This license amendment shall be implemented prior to entering mode 6 for restart following a complete defueling of the reactor, or within 12 months, which-ever occurs first.
FOR THE NUCLEAR REGULATORY COMMISSION He bert N. Berkow, Director Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
August 28, 1990
ha f~'
t, gq'
~g R ~ECo, c<"
P
+@+
+**++
UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 FLORIDA POWER AND LIGHT COMPANY DOCKET NO. 50"251 TURKEY POINT PLANT UNIT NO. 4 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. I32 License No.
DPR-41 I
1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Florida Power and Light Company (the licensee) dated June 5, 1989, as supplemented July 12, 1989, November 3, 1989, February 13, 1990, May 1, 1990, June 21, 1990 and July 20, 1990, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the "Commission; C.,
There is reasonable assur ance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
~ g 4.
I ~
4 iZ
/f1
. ~
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.8 of Facility Operating License No.
DPR-4l is hereby amended to read as follows:
(8)
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 132, are hereby incorporated in the license.
The Environmental Protection Plan contained in Appendix 8 is hereby incorporated into the license.
The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of issuance.
This license amendment shall be implemented prior to entering mode 6 for restart following a complete defueling of the reactor, or within 12 months, which-ever occurs first.
FOR THE NUCLEAR REGULATORY COMMISSION Her ert N. Berkow, Director Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
August 28, 1990
ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO.
137 FACILITY OPERATING LICENSE NO.
DPR-31 AMENDMENT NO.
132 FACILITY OPERATING LICENSE NO.
DPR-41 DOCKET NOS.
50-250 AND 5Q"251 Revise Appendix A as follows:
Remove Pa es Al 1 Insert Pa es Al 1