ML17347B510

From kanterella
Jump to navigation Jump to search
Notification of 900118 Mgt Meeting W/Util in Region II Ofc to Discuss Issues Identified During Design Validation Insp
ML17347B510
Person / Time
Site: Turkey Point  
Issue date: 01/02/1990
From: Crlenjak R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 9001110105
Download: ML17347B510 (2)


Text

OFFICIAL dAN 0%

f990 NOTICE OF SIGNIFICANT MEETING Name of Licensee:

Florida Power and Light Company Name of Facility:

Turkey Point, Units 3 and 4

Docket Numbers:

50-250 and 50-251 Date and Time of Meeting:

January 18, 1990 at 1:00 p.m.

Location of Meeting:

NRC Region II Office, Executive Conference Room Purpose of Meeting:

Management meeting to discuss the issues identified during the Design Validation Inspection.

NRC Attendees:

S.

D. Ebneter, Regional Administrator, RII L. A. Reyes, Director, Division of Reactor Projects (DRP), RII A.

F. Gibson, Director, Division of Reactor Safety (DRS)

C. A. Julian, Chief, Engineering

Branch, DRS M. V. Sinkule,'hief, Reactor Projects Branch 2, DRP F. Jape, Chief, Quality Programs
Section, DRS R.

V. Crlenjak, Chief, Reactor Projects Section 2B, DRP P.

M. Madden, Project Engineer, Reactor Projects Section 2B, DRP S. J.. Vias, Project Engineer, Reactor Projects Section 2B, DRP G.

E. Edison, Senior Project Manager, Office of Nuclear

'eactor Regulation (NRR)

E.

V. Imbro, Chief, Team Inspection Section B, Special Inspection

Branch, NRR Licensee Attendees:

H.

N. Paduano, Manager of Nuclear Engineering R;

D. Gill, Manager of Civil Engineering - Nuclear L.

F. Papst, Project Manager, Design Basis Reconstitution R.

L. Wade, Project Supervisor - Turkey Point R.

E.

Rose, Supervisor Configuration Control - Turkey Point J. J.

Hutchenson, Manager Plant Support G.

Madden, Senior Licensing Engineer NOTE:

Attendance by NRC personnel at this NRC/Licensee meeting should be made known by 4:00 p.m., January 16, 1990, via telephone call to P.

M. Madden, FTS:

841-5561.

Di stribution (See page 2)

Approved by:

R.

V.

enjak, Ch' Reactor Projects, Section 2B Division of Reactor Projects

'+OOi.<10i05 DA ariiiu:

IQ

~

Notice of Significant Meeting JAN OR 1ggg Distribution:

J.

M. Taylor, Executive Director for Operations J.

H. Sniezek, Deputy Director, NRR G.

C. Lainas, Assistant Director for Region II Reactors, NRR H.

N. Berkow, Director, Project Directorate II-2, NRR R.

W. Borchardt, Regional Coordinator, EOO G.

E. Edison, Senior Project Manager, NRR bcc:

NRC Resident Inspector Document Control Desk All NRC attendees

, "Concurrences

  • R
ORP PM dden ter 12+)/89 RI: DRP R r enjak 12/ij /89 W/~ /89 R I P

eye

/g.f89 R

P J ilhoan 01/g /P