ML17347B510
| ML17347B510 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 01/02/1990 |
| From: | Crlenjak R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 9001110105 | |
| Download: ML17347B510 (2) | |
Text
OFFICIAL dAN 0%
f990 NOTICE OF SIGNIFICANT MEETING Name of Licensee:
Florida Power and Light Company Name of Facility:
Turkey Point, Units 3 and 4
Docket Numbers:
50-250 and 50-251 Date and Time of Meeting:
January 18, 1990 at 1:00 p.m.
Location of Meeting:
NRC Region II Office, Executive Conference Room Purpose of Meeting:
Management meeting to discuss the issues identified during the Design Validation Inspection.
NRC Attendees:
S.
D. Ebneter, Regional Administrator, RII L. A. Reyes, Director, Division of Reactor Projects (DRP), RII A.
F. Gibson, Director, Division of Reactor Safety (DRS)
C. A. Julian, Chief, Engineering
- Section, DRS R.
V. Crlenjak, Chief, Reactor Projects Section 2B, DRP P.
M. Madden, Project Engineer, Reactor Projects Section 2B, DRP S. J.. Vias, Project Engineer, Reactor Projects Section 2B, DRP G.
E. Edison, Senior Project Manager, Office of Nuclear
'eactor Regulation (NRR)
E.
V. Imbro, Chief, Team Inspection Section B, Special Inspection
- Branch, NRR Licensee Attendees:
H.
N. Paduano, Manager of Nuclear Engineering R;
D. Gill, Manager of Civil Engineering - Nuclear L.
F. Papst, Project Manager, Design Basis Reconstitution R.
L. Wade, Project Supervisor - Turkey Point R.
E.
- Rose, Supervisor Configuration Control - Turkey Point J. J.
Hutchenson, Manager Plant Support G.
- Madden, Senior Licensing Engineer NOTE:
Attendance by NRC personnel at this NRC/Licensee meeting should be made known by 4:00 p.m., January 16, 1990, via telephone call to P.
M. Madden, FTS:
841-5561.
Di stribution (See page 2)
Approved by:
R.
V.
- enjak, Ch' Reactor Projects, Section 2B Division of Reactor Projects
'+OOi.<10i05 DA ariiiu:
IQ
~
Notice of Significant Meeting JAN OR 1ggg Distribution:
J.
M. Taylor, Executive Director for Operations J.
H. Sniezek, Deputy Director, NRR G.
C. Lainas, Assistant Director for Region II Reactors, NRR H.
N. Berkow, Director, Project Directorate II-2, NRR R.
W. Borchardt, Regional Coordinator, EOO G.
E. Edison, Senior Project Manager, NRR bcc:
NRC Resident Inspector Document Control Desk All NRC attendees
, "Concurrences
- R
eye
/g.f89 R
P J ilhoan 01/g /P