ML17347B339

From kanterella
Jump to navigation Jump to search
Notification of 890919 Meeting W/Licensee Onsite for Mgt Meeting to Discuss Significant Programmatic Issues
ML17347B339
Person / Time
Site: Turkey Point  
Issue date: 09/07/1989
From: Crlenjak R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8909200263
Download: ML17347B339 (3)


Text

SEP 0 7 1989 NOTICE OF SIGNIFICANT MEETING Name of Licensee:

Florida Power and Light Company Name of Facility:

Turkey Point, Units 3 and 4

Docket Nos.:

50-250 and 50-251 Date and Time of Meeting:

September 19, 1989, at 12:30 p.m.

Location of Meeting:

Turkey Point Site Purpose of Meeting:

Management Meeting to discuss significant programmatic issues.

NRC Attendees:

S.

D. Ebneter, Regional Administrator, RII L. A. Reyes, Director, Division of Reactor Projects (DRP), RII S.

A. Varga, Director, Division of Projects I/II, NRR G.

C. Lainas, Assistant Director for Region II Reactors, NRR R.

M. Borchardt, Regional Coordinator, EDO M. V. Sinkule, Chief, Reactor Projects Branch 2, DRP, RII B. Grimes, Director, Division of Reactor Inspection and Safeguards, NRR H.

N. Berkow, Director, Project Directorate II/2, NRR G.

E. Edison, Senior Project Manager, NRR R.

C. Butcher, Senior Resident Inspector, Turkey Point G. Schnebli, Resident Inspector, Turkey Point T.

F. McElhinney, Resident Inspector, Turkey Point Licensee Attendees:

J.

H.

C. A.

K. N.

J.

E.

R. J.

J.

B.

F.

H.

D. A.

Goldberg, Executive Vice President Pell, Assistant to Senior VP - Nuclear Operation Harris, Site Vice President

- Turkey Point

Cross, Plant Manager Acosta, Acting Vice President, Nuclear Hosmer, Director, Nuclear Engineering Southworth, Technical Department Supervisor Chancy, Director - Nuclear Licensing NOTE:

Attendance by NRC personnel at the NRC/Licensee meeting should be made known by 4:00 p.m.,

September 14, 1989, via telephone call to P.

M. Madden at FTS:

841-5509.

Approved By:

Ori g ina 1 s i g ned by M. V. Sinkule (for)

R.

V. Cr enjak, Chief Reactor Projects Section 2B Division of Reactor Projects Distribution:

(See page 2) 8909200263 890907 PDR ADQCK 05000250 P

PNU

- Notice of Significant Meeting SEP 0 7 1989 Distribution:

H. L. Thompson, Jr.,

Deputy Executive Director for Nuclear Materials Safety, Safeguards and Operations

Support, EDO J. Lieberman, Director, Office of Enforcement G. Lainas, Acting Director for Region II Reactors, NRR G.

E. Edison, Senior Project Manager, NRR bcc:

All NRC Attendees NRC Resident Inspector Personnel Management Specialist Document Control Desk-Receptionist RI RP P

aden'9/6 /89 RI 1

jak 09/6/89 RII:D P MSinkule Og/$ /89 RII:

RP RII:

P RII:ORA B,

L y

BGr' 09/

/89 09/ 0/89

/89