L-87-500, Forwards Partial Florida Power & Light Co Turkey Point Plant Unit 3 Cycle XI Startup Rept, to Cover Testing Performed Up to 30% Power & to Document first-time Use of Hafnium Vessel Flux Depression Assemblies

From kanterella
(Redirected from ML17347A645)
Jump to navigation Jump to search
Forwards Partial Florida Power & Light Co Turkey Point Plant Unit 3 Cycle XI Startup Rept, to Cover Testing Performed Up to 30% Power & to Document first-time Use of Hafnium Vessel Flux Depression Assemblies
ML17347A645
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 12/07/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17347A646 List:
References
L-87-500, NUDOCS 8712110242
Download: ML17347A645 (2)


Text

REGULA Y INFORMATION DISTRIBUTION SYSTEM (BIDS)

ACCESSION NHR: 8712110242 DQC. DATE: 87/12/07 NOTARIZED:

NO 'OCKET 0 FACIL:50-250 Turkey Point Planti Unit 3i Florida Power and Light C

05000250 AUTH. NAME AUTHOR AFFILIATION WOODY'. Q.

Florida Power 5 Light Co.

RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards partial startup physics test rept. Rept documents first time use of hafnium vessel flux depr ession assemblies 5 effect on core physics. Remaining part of rept will be submitted within 90 days after completion of 100/ testing.

DIBTRIBUTION CODE:

IEB6D COP IEB RECEIVED: LTR J. ENCL J BIZE:

I +

TITLE: Btartup Report/Refueling Report (per Tech Specs)

NOTES:

INTERNAL:

RECIPIENT ID CODE/NAME PD2-2 LA McDONALD>D

  • DV REG FILE 02 R

FILE 01 COPIES LTTR ENCL 1

0 2

2 1

1 1

1 1

REC IP IENT ID CODE/NAME PD2-2 PD NRR/PMAS/ILRB RES DEPY GI RGN2/DRSS/EPRPH COPIEB LTTR ENCL 1

EXTERNAL:

LPDR NBIC NRC PDR TOTAL NUMBER OF COP IEB REQUIRED:

LTTR 13 ENCL 12

l " 8OX14000,JUNOBEACH, FL 334CS0420 DECEMBER O '?

1S8?

L-87-500 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D. C.

20555 Gentlemen:

Re:

Turkey Point Unit 3 Docket. No. 50-250 Startu Ph sics Re ort n

accordance with Technical Specification 6.9.1.a, the attached partial start-up physics test report to cover testing performed up to 304 power is being submitted.

The Unit 3 Cycle XX Start-Up Report documents the first time use of Hafnium Vessel Flux Depression Assemblies and their effect on core physics.

The remaining part of the report will be submitted within 90 days following completion of the 1004 power testing.

Should you have any questions, please contact us.

Very truly yours, C. 0.

Woody Executive Vice President COW/SDF/gp Attachment cc:

Dr. Z. Nelson Grace, Regional Administrator, Region IX, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 12220242 871207 f DR ADOCZ 05000250 PDR

+jPll SDF/008.SPR

"-n FPL Grouo congas",