ML17347A289
| ML17347A289 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 02/12/1987 |
| From: | Rubenstein L Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17347A290 | List: |
| References | |
| NUDOCS 8702270435 | |
| Download: ML17347A289 (6) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 FLORIDA POWER AND LIGHT COMPANY DOCKET NO. 50-250 TURKFY POINT PLANT, UNIT NO.
3 AMENDMENT TO FACILITY OPEPATIN(i LICENSE Amendment No.
122 License No.
PPR-31 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
B.
The application for amendment by Florida Power and Light Company (the licensee) dated February 4, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFP Chapter I; The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.8 of Facility Operating License No.
DPR-31 is hereby amended to read as follows:
8702270435 870212 PDR ADOCK 05000250=
P PDR
l pe
2 (B)
Technical S ecifications The-Technical Specifications contained in Appendices A and B, as revised through Amendment No. 122, are hereby incorporated in the license.
The license shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of issuance.
Attachment:
Changes to the Technical Specifications FOR THE NUCLEAR REGULATORY COMMISSION Lester S. Rubenstein, Director PWR Pro ect Directorate P2 Division of PWP. Licensing-A Office of Nuclear Reactor Pegulation Date of Issuance:
February 12'987
ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. l22 TO FACILITY OPERATING LICENSE NO. DPR-31 DOCKET NO. 50-250 Revise Appendix A as follows:
Remove Paaes 4.7.1 4.7.R Insert Pa es 4.7.1 4.7.R
Applicability:
Applies to the Emergency Contasanent Filter Syst~,
the Post Accident Containment vent Systen, and tne Control Roan V'ntilation System.
To verify that these SyStemS and thei r components will be able tO perfOrm th~>r deSign runCtiOnS.
Ob.'c t tv e s:
In the event that painting, l'>re, or chemical release OCCurS SuCh that tne filterS are expOSed tO tn~
etfluentS Of theSe
- eventS, the SyStem weal I
be tcSted tO verify its performance or design teatures.
Specification:
1.
EMERGENCY CONTAIs'(MENT FILTER SYSTEM l.
Operate net Tests System tests shall be performed once,per operating cycle or once per 1d months, wn>chevier comes rirst.
The tests snail consist of pressure drop and flow measurements across all filter banks in tne plenum.
Less tnan 6" ot water pressure drop at design rlow (37,500 ctm 10.) across tne canbined HEpA filter and charcoal adsorbers shall constitute acceptaole performance.
Visual inspec:ion snail include search for any toreign material ana gasket deterioration of the HEPA filters and cnarcoai adsorbers.
C
'. 7 EMERGENCY CONTAINMENT FILTER SYST M, POST ACCIDENT CONTAINMENT VENT
- SYSTEM, ANO CONTROL ROOM VENTILATION SYSTEM.
The surveillence period may be extended for Unit 3
until the refueling outage for Cycle 11.
Amendment No.
122
Once per operating cycle, each unl t ot'ne Emergency Containment Fi Itering System snaI I oq teSted tO aemOnStrat~
autOmatiC initidtiOn upOn receipt of a Safety Ingection signal.
Eden u>>it or tne Emergency Contaianent Filtering System Shal I
De Operated mOnthly tvr dt I~dSt 15 minutes on a staggered odsls tv aemonstrdt<
Operab i I ity.
2.
Perrormance T.sts a.
A visual inspection snail oe mad~ Derore
~den in-place air tlow distribution test, OUP test or halOgendtda Ieak teSt.
At IeaSt OnCe per Id months~or after every 72U nours vf system operation, in-place OOP ana nalogenatea hydrOCdrbon teStS ct deSign rlOW (37,5UO Ctrn
+
1UX) ana carbon analysis t'or eacn tmergency Containment Filter plenum snail be pertormea.
In ddditivn, caroon analysis and in-place
- OOP, ana halogendted hydrocarbon tests at a~sign rlow (37,500 cfm 1U") shall be performed after
( 1) any structural mdintendnce vn system hous
- ngs, wnich might nave aftectea rilter bank ef iciency, (2) dr'ter complete vr pdrtia,l replacement of a rilter bank, or (3) arter operational exposure of tne tilters to ~rr'Iue>>ts fran painting, tire, or chenical releas~.
Removal of 99",.
OOP and
> 99 hdlog~ndted hydrocarbon snail constitute acceptable perrormance.
Fans snail operate dt design tlow (37,5UO cfm + 1&).
The cnarcval surveillanc~
specimen trom one ot the energency Containment filters snail snow
> 89.95 ranvvaI erficiency for elemental iodine.
Samples will be taxman in accordance witn position C.6.b.ot Regulatory Guide 1.52.
Carbun analysis will be p~rror~d in accoraance witn ANSI N51U-1975.
Analysis shall verify tne above removal erricency ror elenentai iodine within 45 days after renoval vt'he sample.
Failing tnis, the cnarcodl siiail be replaced with charcoal
~hich meets or exceeds tiie criteria ot'osi:.ion C.6.a of Regulatory Guide 1.52 (Revision 2).
b.
An air distribution test shal I oe pertormea at design tlow (37,500 cfm + 10
) at Ieast once a ter maintenance afrecting t'low ai stribution.
c.
Flow rate shoula be verified tollowing maintenance to HEPA or cnarcoal nousing, or fallOwing painting Or CnemiCal reledSe in i:S ventilation zone wnile tne system is oper~ting, or once each 13 months.
- The surveillence period may be extended for Unit 3 until the refueling outage for Cycle 11.
4.y.. g Amendment No.