Notification of Intent to Perform Analysis Using Vendor Methodology in Accordance with Generic Letter 83-11, Supplement 1
ML17347A095
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 12/12/2017
From: Gullott D
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-83-011, S01, RS-17-169
Download: ML17347A095 (4)


Text

Addollow

% ExeLon Generation,f 4300 Winfield Road Warrenville, IL 60555 630 657 2000 Office RS-17-169

GL 83-11 Supplement 1 December 12, 2017 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455

Subject:

Notification of Intent to Perform Analysis Using Vendor Methodology in Accordance with Generic Letter 83-11, Supplement 1

Reference:

Generic Letter 83-11 Supplement 1, "Licensee Qualification for Performing Safety Analysis," dated June 24, 1999 As requested in Generic Letter (GL) 83-11, Supplement 1, "Licensee Qualification for Performing Safety Analyses," Exelon Generation Company, LLC (EGC) is notifying the NRC of our intent to perform safety analyses using computer codes and methodology supplied by Westinghouse wiI7ich have been previously approved by the NRC. Specificaiiy, t;,ie EGC Nuclear Fuels group will oe~ rorm reload physics analyses for Byron and Qraidwood Stations that were previously performed by Westinghouse Electric Company, LLC. EGC I,as implemented the program outlined G

33-11, Suop;emert 'I as t isc°-issed in At' achmert 1.

As noted in Section 2.0, "Guidelines," of the GL, "... he licensee should send -.-he NRC a notification of r.s,paving followed t'?e guidelines at least 3 rronti ~s nesore :lie date of 'ts intended first licensing

~opl cation." ~ ie rst application of the Westinghouse methods will occur in support ofi tl~e s;a up of

-aiu'wocd Station, Unit 1 C,/cle 21, currently schedc'.ed :o becin in Apr] 20180

December 12, 2017 U. S. Nuclear Regulatory Commission Page 2 If you have any questions or require additional information, please contact Joseph A. Bauer at (630) 657-2804.

Respectfully, G-'

David M. Guilott Manager Licensing Bxeion Generation Company, LLC : Braidwood Station and Byron Station, Summary of Program Controlling Use of Verdor Uethodclogy cc:

NRC Regional Administrator, Recion III NRC Senior Resident Inspector, Braidwood Station NRC Senior Resident Inspector, Syron Station

ATTACHMENT 1 Braidwood Station and Byron Station Summary of Program Controlling Use of Vendor Methodology Eligibility The NRC has approved the Westinghouse Methodology detailed in WCAP 9272-P-A (Reference 1). Exelon Generation Company, LLC (EGC) intends to use the Westinghouse Methodology to perform core reload physics design work.

Abdication Procedures Procedures were developed on a task-specific basis utilizing Westinghouse training as well as the Westinghouse Methodology Manual (Reference 2). All applicable procedures were reviewed, approved and implemented. The Westinghouse Methodology Manual will be consulted during the performance of each analysis task.

Training and Qualification of Licensee Personnel A training program has been implemented and EGC personnel have been qualified to perform the reload physics analyses for a core reload. Certification guides have been generated to align with task-specific procedures. The qualification of personnel is obtained on a task-specific basis through completion of the certification guide requirements.

Comparison Calculations Calculated results utilizing the Westinghouse Methodology (References 1 and 2) were compared to the actual startup physics test results, measured flux detector data and plant boron data. The scope of these comparisons encompassed only the parameters that EGC will be authoring upon completion of this notification.

The results of these comparison calculations have met the applicable acceptance criteria and have been documented in a benchmark report (Reference 3). This report will be maintained in the EGC Records System for the life of Byron and Braidwood Stations.

Quality Assurance and Chanae Control Westinghouse provides quality assurance, change control documents and updates for their Reload Methodology. An Issues Report is issued monthly by Westinghouse and placed on a shared web portal for use by the Utility. The EGC core designer reviews the Issues Report and changes to the Westinghouse Methodology Manual (Reference 2) when completing documentation of the reload products. Calculations and analyses performed by EGC using the Westinghouse Methodology will be performed in accordance with the EGC Quality Assurance Program.

The EGC Software Quality Assurance Program requires that any identified errors that affect the use or operation of software products be documented in the EGC corrective action program.

Any issues found that involve vendor software will be immediately communicated to the vendor.

ATTACHMENT 1 Braidwood Station and Byron Station Summary of Program Controlling Use of Vendor Methodology References WCAP-9272-P-A, "Westinghouse Reload Safety Evaluations Methodology," July 1985

2. Westinghouse METCOM (Current Release)
3. NF173310, "Core Design Benchmark to Support Generic Letter 83-11 Supplement 1 Requirements," September 29, 2017 2