ML17345B382
| ML17345B382 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 12/09/1983 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17345B380 | List: |
| References | |
| NUDOCS 8312280202 | |
| Download: ML17345B382 (6) | |
Text
U. S.
NUCLEAR REGULATORY COMMISSION FLORIDA POWER AND LIGHT COMPANY DOCKET NOS.
50-250 AND 50-251 NOTICE OF ISSUANCE OF AMENDMENTS TO FACILITIES OPERATING LICENSES AND FINAL DETERMINATION OF NO SIGNIFICANT HAZARDS CONS IDERATION The U. S. Nuclear Regulatory
.Commission (the Commission) has issued Amendment No.98 to Facility Operating License No.
DPR-31, and Amendment No. 92to Facility Operating License No.
DPR-41 issued to Florida Power and Light Company (the licensee),
which revised Technical Specifications for operation of Turkey Point Plant, Unit Nos.
3 and 4 (the facilities) located in Dade County, Florida.
The amendments are effective as of the date of issuance for Unit 3 and startup of Cycle 10 for Unit 4.
The application for these amendments comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations.
The Commisison has made appropi rate findings as requied by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the these license amendments.
Notice of Consideration of Issuance of Amendments and Proposed No Significant Hazards Consideration Determination and Opportunity for Hearing in connection with this action was published in the FEDERAL REGISTER (48 FR 33080) on July 20, 1983.
No significant hazards considerations comments have been received on this action, but comments relevant to this action have been received on a related amendment (48 FR 45862, October 7, 1983).
93i2280202 831209
~DR ADOCK 0S000250 PDR
0
~
)
~
Under its regulations, the Commission may issue and make an amendment immediately effective, notwithstanding the pendency before it of a request for a hearing from any person, in advance of the holding and completion of any required hearing, where it has determined that no significant hazards consideration is involved.
The Commission has applied the standards of 10 CFR 50.92 and has made a final determination that these amendments involve no significant hazards consideration.
The basis for this determination is contained in the Safety Evaluation related to this action.
Accordingly, as described
- above, these amendments have been issued and made immediately effective for Unit 3 and startup Cycle 10 for Unit 4.
The Commission has determined that the issuance of the amendments will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of the amendments.
For further details with respect to the action see (1) the application for amendments dated June 3,
- 1983, as supplemented November 16,
- 1983, (2)
Amendment Nos.
98 and 92 to Facilities Operating License Nos.
DPR-31 and DPR-41 and (3) the Commission's related Safety Evaluation.
All of these items are available for public inspection at the Commission's Public Document
- Room, 1717 H Street, N.W., Washington, D.C
, and at the Environmental and
Urban Affairs Library, Florida International University, Miami, Florida 33199.
A copy of items (2) and (3) may be obtained upon request addressed to the U.
S. Nuclear Regulatory Commission, Washington, D.C..
20555, Attention:
Director, Division of Licensing.
Dated at Bethesda, Maryland this 9th
.day of December 1983.
FOR THE U.
S.
NUCLEAR REGULATORY COMMISSION ev rga.
Chief Operating Reactors Branch
~1 Division of Licensing
Fi 4
~
wW+j