L-88-533, Forwards Turkey Point Unit 4 Flux Map Thimble Tube Eddy Current Test Rept for NRC Bulletin 88-009
| ML17345A608 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 12/19/1988 |
| From: | Conway W FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML17345A609 | List: |
| References | |
| IEB-88-009, IEB-88-9, L-88-533, NUDOCS 8901050180 | |
| Download: ML17345A608 (2) | |
Text
, kC CKlZRA.TED D1STR1BUTI ON DEMONSTRAT10Ã SYSTEM 0
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8901050180 DOC.DATE: 88/12/19 NOTARIZED: HO DOCKET FACXL:50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.
Florida Power
& Light Co.
RECXP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards "Turkey Point Unit 4 Flux Map Thimble Tube Eddy Current Test Rept for NRC Bulletin 88-009."
I DISTRIBUTION CODE:
IE18D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Bulletin 88-09 Thimble Tube Thinning xn Westinghouse Reactors NOTES:
RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: AEOD/DOA AEOD/DSP/TPAB NRR RAMSEY,J RGN2 FILE 01 EXTERNAL: LPDR NSXC COPIES LTTR ENCL 1
0 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1'
RECXPIENT ID CODE/NAME PD2-2 PD AEOD/DSP
'RR HOU,S NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1
>rRIDS<> RECIPIENIS PIZASE HELP US 'lO.RZZUCE HASTE!
CXMACT 'IHE DOCUMEZI'ONZROL DESK, ROOM Pl-37 (EXT. 20079)
KO EZZMZNATE YOUR NAME HKH DXSTEUBUTIGN LISTS H)R DOCIIMENXS YOU DONIT NEED)
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 17 ENCL 16
P.O.
14000, Juno Beach, FL 33408.0420 PEGEMBER 1 9.
$9SQ L-88-533 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.
C.
20555 Gentlemen:
Re:
Turkey Point Unit 4 Docket No. 50-251 IE Bulletin 88-09 Thimble Tube Thinnin in Westin house Reactors Provided as an attachment is the Thimble Tube Eddy Current Inspection Report for Turkey Point Unit 4.
Unit 3
has scheduled a
similar inspection program for its upcoming refueling outage, now scheduled for Fall 1989.
Should there be any questions, please contact us.
Very truly yours, W.
F Conwa Senior Vice President Nuclear WFC/RG/gp Attachment 0
cc:
Mr. Malcolm L. Ernst, Acting Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 8901050180 881>19 PDR ADOCK 05~000251 PDC an FPL Group company
/i