Notice of Violation from Insp on 880725-0825.Violation Noted:Steam Generator B Steam Flow Control Transfer Switch & Feedwater Flow Control Transfer Switch Inadvertently Placed on Channel Iii,Resulting in Reactor Scram
ML17345A435
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/26/1988
From: Wilson B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML17345A434 List:
References
50-250-88-21, 50-251-88-21, NUDOCS 8810070181
Download: ML17345A435 (2)


Text

ENCLOSURE 1

NOTICE OF VIOLATION Florida Power and Light Company Turkey Point Units 3 and 4

Docket Nos. 50-250, 50-251 License Nos.

DPR-31, DPR-41 During the NRC inspection conducted on July 25, through August 25,

1988, a

violation of NRC requirements was identified.

The violation involved failure to follow procedures.

In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions",

10 CFR Part 2, Appendix C (1988),

the violation is listed below:

TS 6.8.1 states, in part, that written procedures that meet or exceed the requirements of Appendix A, of Regulatory Guide 1.33, shall be established, implemented and maintained.

Appendix A, of Regulatory Guide 1.33, recommends surveillance procedures for reactor protection system tests.

Operating Procedure 14004.1, Steam Generator Protection Channel

- Periodic

Test, dated February 2,
1988, section 8.3.2, requires verification that the steam generator 8 steam flow control transfer switch and feedwater flow control transfer switch be placed on channel IV.

Contrary to the above, on August 19, 1988, while performing section 8.3 of OP 14004. 1, the steam generator B steam flow control transfer switch and feedwater

.flow control transfer switch were inadvertently placed on channel III, resulting in a reactor scram on steam generator B low-low water level.

This is a Severity Level IV violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, Florida Power and Light Company is hereby required to submit to this Office within 30 days of the date of the letter transmitting this Notice a written statement or explanation in reply including (for each violation):

( 1) admission or denial of the violation, (2) the reason for the violation if admitted, (3) the corrective steps which have been taken and the results

achieved, (4) the corrective steps which will 88l0070i81 880926 PDR ADOCK 05000250 0

PDC

Florida Power and Light Company Turkey Point Units 3 and 4

Docket Nos.

50-250, 50-251 License Nos.

DPR-31, DPR-41 be taken to avoid further violations, and (5) the date when full compliance will be achieved.

Where good cause is shown, consideration will be given to extending the response time.

FOR THE NUCLEAR REGULATORY COMMISSION lug M rvjqa) Jrp 6Auu. 6.gQ~.

Bruce A. Wilson, Chief Reactor Projects Branch 2

Division of Reactor Projects Dated at Atlanta, Geaorgia this Q$

day of September 1988