ACCESSION NBR FAC IL: 50-250 50-251 AUTH. NANiE WOQDYi C. O.
REC lP. NAMiE FtEGULA
'.Y INFORNATIGN DISTR IBUTIC SYSTEM (RIDS) 8802160272 DOC. DATE: 88/02/08 NOTARIZED; NO Tu1 keg Point Planti Unit 3i Florida Power and Light C
Turkeg Point PiantI'nit 4I Florida Power and Light C
AUTHOR AFFILIATION Florida Power 5 Light Co.
F'oT ida Power 5 Light,Co.
REC IP IENT AFFILIATION
'ocument Control BTanch (Document Control Desk)
DOCKET 05000250 05000251
SUBJECT:
Speciai 1ept on fire protection sos (FPS) impairments requiring NRC notification. Rept consists of monthly rept of FPS impairments incurred during peT formance of continuing plan" f o" s LE deficient penetrations
';. barriers. W/880208 ltr, DISTR IBUTIDIV CDDE:
IE22D CDPIES RECEIVED: LTR I
ENCLj SIZE TITLE:
- 50. 73 Licensee Event Report (LER) > Incident Rpti etc.
NOTES:
F<Ei I~ IENT ID CODE/M*ME PD2-2 L:2 EDI SQNi v CQP I ES LTTR ENCL 1
1 REC IP IENT ID CODE/N*ME PD2-2 PD COPIES LTTR ENCL INTERN*L: ACRS NI0:.=LSGN AEGD/DG~
AEGD/D"=."/RGA13 ARiN/OC i ~ > i '-" B NRR/DEST/ADS NRR/DEST/ELB NRR/DESF/iNEB NRR/DEST/PSB NRR/DC:-'": 2;
'.='RR/DLPG/GAB NRR/DREP/RAB I Ci1S/DDIB REG F L.
02
- t. I B Fli E 01 1
r J
2 1
1 1
0 1
1 1
1 1
1 ACRS NGELLER
- EOD/DSP/N*S AEOD/DSP/TP*B DEDRG NRR/DEST/CEB NRR/DEST/ICSB NRR/DEST/NTB NRR/DEST/RSB NRR/DLPQ/HFB NRR/DOEA/EAB NRR/DREP/RPB NRR/PNAS/ILRB RES TELFGRDP J RES/DRPS DIR 2
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 EXTERNAL:
EGczG GRGHI M H ST LOBBY WARD NRC PDR NSI C MAYSI G 5
1 1
1 FORD BLDG HQYi A LPDR NS I C HARRIS 1
1 1
1 1
1 TOT*L NUMBER GF CGP IES REGUIRFD:
LTTR 46 ENCL 45
P. O.
14000, JUNO BEACH, FL 33408-0420 FEBRUARY 8
1980-L-88-56 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555 Gentlemen:
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 Special Report:
Breached Fire Barriers and Other Fire Protection S stem Im airments In accordance with Technical Specification 6.9.3, the attached Special Report is provided for your information.
If there should be any questions, please contact us.
Very truly yours, C.
O.
Woo Executiv Vice President Nuclear Energy COW/SDF/dh Attachment cc:
Dr. J.
Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 8802i60172 880208 PDR ADOCK 05000250 8
PDR SDF/003.FPS an FPL Group company
SPECIAL REPORT February 8, 1988 FIRE PROTECTION SYSTEM IMPAIRMENTS REQUIRING NRC NOTIFICATION
~Psr ese:
Technical Specification (TS) 3.14.5.b requires the submission of a report to the NRC if a non-functional fire barrier penetration is not returned to functional status within 7 days.
TS 3.14 also states that certain other conditions require NRC notification.
In accordance with the above requirements, this special report is being generated in order to notify the NRC.
This report is being updated on a
30 day basis.
Event:
Turkey Point has been and is continuing to implement plant modifications.
Fire Protection System (FPS) impairments are, at times, incurred during the performance of these modifications.
Occasionally, certain FPS features fail due to random component failure.
Additionally, this report includes deficient penetrations and barriers which were identified during the 18 month periodic surveillance of penetrations..
Cause and Corrective Actions:
The penetrations and barriers identified during the periodic surveillance are considered to be impaired because they do not meet the design s minimum requirements The surveillance being performed presently, incorporates inspection criteria which are more stringent than the previous surveillance.
As a result, many penetrations and barriers are being identifi'ed as impaired, whereas previously they would have met the then existing criteria.
Additionally, certain impairments have been identified which are due to elastomer shrinkage.
The primary cause of the impairments which were not identified as a result of the periodic surveillance is the number of modifications being performed.
Many of these modifications require the impairment of certain FPS features for their completion.
The secondary cause for the impairments is FPS equipment malfunction.
Because Turkey Point incurs a variable number of impairments, the plant is reporting the impairments in a monthly report, rather than on a case-by-case basis.
The impairments reported this month may be either open or closed at the present time, however they were open in excess of the Technical Specification permitted time limit.
This report includes impairments not reported previously which were:
1) opened prior to January and 2) stayed open for longer than the time permitted by the Technical Specifications, and 3) are either still open or were closed prior to January.
The closed impairments have been reported at the time opened, unless noted otherwise.
The plant continues to implement the compensatory measures as applicable.
FIRE PROTECTION SYSTEM IMPAIRMENTS OPENED SINCE JANUARY REPORT WHICH HAVE BEEN OPEN FOR LONGER THAN TECH SPEC LIMITS 1199 1264 1266
'7-0362
- 88-0002
- 88-0003
- 88-0004
- 88-0005
- 88-0006
- 88-0007
- 88-0008
- 88-0009
- 88-0010
- 88-0011
- 88-0012
- 88-0013
- 88-0014
- 88-0015
- 88-0016
- 88-0017
- 88-0018
- 88-0019
- 88-0020
- 88-0021
- 88-0022
- 88-0023
- 88-0024
- 88-0025
- 88-0026
- 88-0027
- 88-0028
- 88-0030
- 88-0032
- 88-0033
- 88-0034
- 88-0035
- 88-0036
- 88-0037
- 88-0038
- 88-0039
- 88-0040
- 88-0041
- 88-0042 arm 65 arm 26 67W-M001 67N-E027 68W-E001 Fireproof 93F-E010 67F-E002 25W-M003 70N-E015 70W-M002 70S-E006 70S-M008 70S-M010 72S-E008 73E-E002 75N-E002 72E-E003 74S-E002 73N-E007 108E-H001 5551-M005 16N-E005 12W-M005 M005 14N-M025 46W-E004 Elec. Fire Pump Fire Detection Al Fire Detection Al Fire Barrier 12W Penetration Seal Penetration Seal Penetration Seal Structural Steel Penetration Seal Penetration Seal Penetration Seal Penetration Seal Fire Barrier 70W Penetration Seal Penetration Seal Fire Barrier 70W Fire Barrier 70N Penetration Seal Penetration Seal Fire Barrier 71E Penetration Seal Penetration Seal Penetration Seal Penetration Seal Penetration Seal Penetration Seal Fire Door 27-1 Fire Barrier 26N1 Fire Barrier 28W Fire Barrier 27N Penetration Seal Fire Barrier 28 Penetration Seal Fire Barrier 61E Penetration Seal Fire Barrier 13E Penetration Seal Fire Barrier 63E Fire Barrier 40N-Penetration Seal Penetration Seal Fire Barrier 12S Fire Barrier 19W 01/23/88 01/01/88 01/05/88 12/30/87 12/31/87 12/31/87 12/31/87 12/28/87 01/12/88 01/18/88 01/13/88 01/12/88 01/12/88 01/12/88 01/12/88 01/12/88 01/12/88 01/12/88 01/12/88 01/12/88 01/12/88 01/12/88 01/12/88 01/12/88 01/12/88 01/12/88 01/18/88 01/18/88 01/18/88 01/18/88 01/16/88 01/18/88 01/20/88 01/20/88 01/20/88 01/20/88 01/20/88 01/20/88 01/20/88 01/20/88 01/20/88 01/20/88 01/20/88 SDF/003.FPS
Impg Description Open Closed
- 88-0043
- 88-0044
- 88-0045
- 88-0046
- 88-0047
- 88-0048
- 88-0049 Penetration Seal 16W-M003 Penetration Seal 13W-M004 Fire Barrier llS Penetration Seal 19W-E008 Fire Barrier 19S Penetration Seal 46N-M002 Fire Barrier 20W 01/20/88 01/20/88 01/20/88 01/20/88 01/20/88 01/20/88 01/20/88 FIRE PROTECTION SYSTEM IMPAIRMENTS CLOSED SINCE ZANUARY REPORT BUT WERE OPEN FOR LONGER THAN TECH SPEC LIMITS Impg Description Open Closed 1267 Firedoor 106-1 12/22/87 01/05/88 Asterisk
(*)
denotes fire system impairments that were detected as a result of Technical Specification periodic surveillance inspection.
SDF/003. FPS