ML17342B112
| ML17342B112 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point, 05000000 |
| Issue date: | 02/01/1988 |
| From: | Woody C FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR GL-87-02, GL-87-2, L-88-51, NUDOCS 8802050097 | |
| Download: ML17342B112 (6) | |
Text
REGULA Y INFORMATION DISTR IBUTIO" YSTEM (RIDS)
ACCESSION NBR: 8802050097 DOC. DATE: 88/02/
1 NOTARIZED:
NO FACIL: 58-000 Gener i c Doc k et 50-250 Turkey Point Plant>
Unit 3> Florida Power and Light C
50251 Turkey Point Plant>
Unit 4> Florida Power and Light C
50-335 St.
Lucie Plant>
Unit 1> Florida Poeer Kc Light Co.
AUTH. NAME AUTHOR AFFILIATION WOODY> C. O.
Florida Poeer 5 Light Co.
RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Submits info on probability o+ initiating SSE conditional public dose for WASH-1400 Category 2 release> per commitment in 871001 ltr re response to Generic Ltr 87-02.
DISTRIBUTION CODE:
A048D COPIES RECEIVED: LTR I ENCL 0 SIZE:
TITLE: OR/Licensing Submittal:
Equipment Qualification NOTES:
DOCKET 0 05000000 05000250 05000251 05000335 RECIPIENT ID CODE/NAME PD2-2 LA McDONALD>D INTERNAL: ARM/DAF/LFMB NRR/DEST/ADE RR-/
B R
G FIL 01 EXTERNAL'PDR NSIC COPIES LTTR ENCL REC IP IENT ID CODE/NAME PD2-2 PD TOUR IGNY> E GC NRR/DEST/MEB OGC/HDS2 RES/DE/E IB NRC PDR COPIES LTTR ENCL TOTAL NUMBER OF COPlES REQUIRED:
LTTR ib ENCL
l I l'
P. O.
'< 14000, JUNO BEACH, PL 33408-0420
,"1,(, fI Jf I",g FEBRUARY 1
1988 L-88-51 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555 Gentlemen:
Re:
St. Lucie Unit 1 Docket No. 50-335 Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors (Generic Letter 87-02)
Unresolved Safety Issue A-46 By letter number L-87-211, dated May 15, l987, Florida Power and Light Company (FPL) provided a response to Generic Letter 87-02.
By letter number L-87-401 dated October l, 1987, FPL provided a
progress update and committed to provide a
further progress update by January 31, 1988.
This letter provides the committed progress update.
FPL has received the final site specific Seismic Hazard and Radiological Release information providing the numbers for the probability of an initiating Safe Shutdown Earthquake (SSE) and for the conditional public dose for a
WASH-1400 Category 2
release.
These numbers may be summarized as follows:
St. Lucie Turkey Point Probability of SSE (p(i) )
- 1. 27E-5/RY
PDR an FpL Group company
'\\
U. S. Nuclear Regulatory Commission L-88-51 Page Two The above listed data verifies FPL's previous conclusion that the Value-Impact (V/I)
Ratio for the seismic adequacy review requested by Generic Letter (GL) 87-02 is much less than one and that consideration of the costs of the review was appropriate since FPL plants now have a more than adequate level of safety with regard to risk from potential seismic events.
Since the V/I Ratio is so much less than one, FPL has not yet investigated additional factors and probabilities which would tend to reduce it even more.
FPL would like to schedule a meeting with the NRC to make a more detailed presentation of the results of its site specific Value/Impact analyses and will coordinate the meeting through the respective Project Managers.
FPL will provide a further written progress update on or before March 31, 1988.
Very truly yours, C.
O.
ody Executive Vice President COW/JRL/dh cc: