Advises That Response to NRC Bulletin 87-002, Fastener Testing to Determine Conformance W/Applicable Matl Specs, Will Be Submitted by 880212,per 880111 Telcon.Delay Due to Incomplete Verification & Validation of Test Results
ML17342B076
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 01/12/1988
From: Woody C, Woody C
FLORIDA POWER & LIGHT CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-87-002, IEB-87-2, L-88-14, NUDOCS 8801150220
Download: ML17342B076 (3)


Text

ACCELERATED DIS1&BUTION DEMONSTRA1'ION SYSTEM ACCESSION NBR:

FACIL:50-000 50-250 50-251 50-335 50-389 AUTH.NAME

'OODY,C.D.

RECIP.NAME GRACE,J.N.'EGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) 8801150220 DOC. DATE: 88/01/12 NOTARIZED: NO Generic Docket Turkey Point Plant, Unit 3, Florida Power and Light Turkey Point Plant, Unit 4, Florida Power and Light St. Lucie Plant, Unit 1, Florida Power

& Light Co.

St. Lucie Plant, Unit 2, Florida Power

& Light Co.

AUTHOR AFFILIATION Florida Power

& Light Co.

RECIPIENT AFFILIATION Region 2, Ofc of the Director DOCKET 05000000 C

05000250 C

05000251 05000335 05000389 R

SUBJECT:

Advises that response to NRC Bulletin 87-002 will be submitted by 880212,per 880111 telcon.

DISTRIBUTION CODE:

IE11D COPIES RECEIVED:LTR ENCL ~ SIZE:

TITLE: Bulletin Response (50 DKT)

NOTES:

RECIPIENT ID CODE/NAME PD2-2 LA McDONALD,D COPIES LTTR ENCL 1

0 1

1 RECIPIENT ID CODE/NAME PD2-2 PD TOURIGNY,E COPIES LTTR ENCL 1

1 1

1 j

A INTERNAL AEOD/DOA AEOD/DSP/TPAB NRR/DEST/ADS NRR/DOEA/EAB

~P/EPB 6 FIL~

02 RC3'2=5'ZLE 01 EXTERNAL: LPDR NSIC 1

1 1

1 1

1 1

1 1

1 1

1 1

1 2

2 1

1 AEOD/DSP NRR/DEST/ADE NRR/DEST/MEB NRR/DOEA/GCB NRR/PMAS/ILRB RES/DE/EIB NRC PDR 1

1 1

1 1

1 1

1 1

1 1

1 1

1 R

D I

S TOTAL NUMBER OF COPIES REQUIRED:

LTTR 21 ENCL 2

tAtJUARY i 2 '"88 L-88-14 Dr. J.

Nelson Grace Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta St.,

N.W., Suite 2900

Atlanta, GA 30323

Dear Dr. Grace:

Re:

St. Lucie Units 1 and 2

Docket Nos.

50-335 and 50-389 Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 NRC Bulletin 87-02:

Fastner Testing to Determine Conformance with A licable Material S ecifications On January 11,

1988, a

telephone conference call was held between Florida Power

& Light (FPL) and the NRC Region II Staff to discuss an extension in FPL's response to NRC Compliance Bulletin No.

87-02.

FPL requested a

one month delay from the original response schedule of January 12, 1988.

The new response schedule as agreed is February 12, 1988.

The reason for delay is that the verification and validation of test results has not been completed.

Should there be questions, please contact us.

Very truly yours, C.

O.

Wo Execut Vice President COW/MSD/gp cc:

Document Control Desk, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant Senior Resident Inspector, USNRC, Turkey Point Plant MSD/0 11. BUL 8801150220 88011?

PDR ADOCK 05000250 0

DCD i/0 an FPL Group co~pany