L-87-474, Forwards Integrated Schedule Turkey Point Nuclear Power Plant Regulatory Rept Nov 1987, Containing Correct Baseline Schedules for Forthcoming Integrated License Amends
| ML17342B032 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 11/16/1987 |
| From: | Woody C FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML17342B033 | List: |
| References | |
| L-87-474, NUDOCS 8711200189 | |
| Download: ML17342B032 (4) | |
Text
REGULA Y INFORMATION DISTRIBUTlO YSTEM <RIDS)
ACCESSION NBR: 8711200189 DOC. DATE: 87/11/16 NOTARIZED:
NO FACIL: 50-250 Turkey Point P)anti Unit 3~ Flor ida Power and Light C
50-251 Turkey Point Plant>
Unit 4i Florida Power and Light C
AUTH. NAME AUTHOR AFFILIATION WOODYi C. O.
Florida Power 8< Light Co.
RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOCKET 0 05000250 05000251
SUBJECT:
Forwards Integrated Schedule for Nov 1987 containing correct baseline schedules for forthcoming Integrated Schedule license amends.
DISTRIBUTION CODE:
A001D COPIES RECEIVED: LTR ENCL +
SIZE: /+~
TITLE:
OR Submittal:
General Distribution NOTES:
RECIPIENT ID CODE/NAME PD2-2 L*
McDONALD>D COPIES LTTR ENCL 0
1 1
REC IP IENT ID CODE/NAME PD2-2 PD COPIES LTTR ENCL 5
5 INTERNAL: ARM/DAF/LFMB NRR/DEST/CEB NRR/DEST/RSB
/ILRB R
FILE 01 EXTERNAL:
EG8cG BRUSKEi S NRC PDR 1
0 1
1 1
1 1
1 1
1 1
1 1
NRR/DEST/ADS NRR/DEST/MTB NRR/DOEA/TSB OGC/HDS2 RES/DE/EIB LPDR NSIC 1
1 1
1 1
0 1
1 1
1 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 21 ENCL 18 I
r 0
L
\\
1' p
f
P.
OX 14000, JUNO BEACH, FL 33408.0420 I:I
~l/N NOVEMBER i. 6 19j~T L-87-474 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:
Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-25 I Proposed License Amendments Inte rated Schedule Enclosed please find a
copy of the Turkey Point Integrated Schedule for
- November, l987 containing the correct baseline schedules for the forthcoming Integrated Schedule license amendments.
This report is provided as an update to our previous report provided with our letter of June 22, I 987 (L-87-263).
Should there be any questions regarding this information, please contact us as soon as possible, so that we may resolve any concerns which could delay issuance of the amendments.
Very truly yours, C. O.
dy Group ice President Nuclear Energy Department COW/JRL/gp cc:
Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Mr. Lyle Jerrett, Florida Dept. of Health and Rehabilitative Services
~ ski>aooie9 a7iiib PDR ADDCK 05000250 P
PDR MLC/009/ I
)ool I)i an FPL Group company
4 4 IS
.41 11 JM
~ UL t
~ UVJJ U
4 4
4 L
~
I U
V. I'
~
4 4
I t
4 II 4
4 4U I
,4
<<4 4
I h 4 4
1 4 4