L-87-443, Forwards Procedure 0-ADM-019, Mgt on Shift, Per NRC 871019 Order.Augmented Mgt on Shift Program Initiated on 871024.Util Understands That No Further Order Associated Restrictions Prevent Plant from Entering Mode 2 Startup
| ML17342A995 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 10/30/1987 |
| From: | Woody C FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML17342A996 | List: |
| References | |
| L-87-443, NUDOCS 8711040120 | |
| Download: ML17342A995 (4) | |
Text
'CCESSION NOR:
FACIL: 50-250 50-251 AUTH. NAME WOODY> C. O.
RECIP. NAME REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) 87110401 DOC. DATE: 87/10/30 NO IZED:
NO DOCKET ¹ Turkey Point Plant>
Unit 3 Florida Poujer and Light C
05000250 Turkey Point Plant>
Unit 4> Florida Poujer and Light C
05000251 AUTHOR AFFILIATION Florida Poujer 5 Light Co.
RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forujards Procedure 0-ADM-019>
"Mgt on Shift> " per NRC 871019 order.
DISTRIBUTION CODE:
AOOID COPIES RECEIVED: LTR I
ENCL +
SIZE: /~ /6 TITLE:
OR Submittal:
General Distribution NOTES:
REC IP IENT ID CODE/NAME PD2-2 LA McDONALD> D COP IEB LTTR ENCL 1
0 1
1 RECIPIENT ID CODE/NAME PD2-2 PD COPIES LTTR ENCL 5
5 INTERNAL: ARM/DAF/LFMB NRR/DEBT/CEO NRR/DEBT/RSB NR A
RB F
01 EXTERNAL:
EG5G BRUSKE> S NRC PDR 1
0 1
1 1
1 1
1 1
1 1
1 1
NRR/DEBT/ADS NRR/DEBT/MTH NRR/DOEA/TBB OGC/HDS2 REB/DE/EIB LPDR NSIC 1
1 1
1 1
0 1
1 1
1 TOTAL NUMBER OF, COP IEB REQUIRED:
LTTR 21 ENCL 18
l
~ ~
),
1 Qy,g I,
)i l
P. O. BOX 14000, JUNO BEACH, FL 33408.0420 OCTOBER 3 0 1987 L-87-443 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 G ent Iemen:
Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-25 I Au mented Mana ement on Shift Pro ram Paragraph V.D.2 of the NRC order regarding Turkey Point Units 3 and 4 dated October I 9, I 987 requires FPL to provide a copy of the guidance document for the Management On Shift Program to the NRC.
FPL has prepared Turkey Point Nuclear Plant Procedure O-ADM-OI9, titled Management on Shift, to provide administrative instructions to management personnel on shift.
The instructions delineate the on shift program, guidelines, standards, policy clarifications and reporting requirements.
A copy of this procedure is attached in compliance with the requirements of the order.
The augmented management on shift program was initiated on Saturday, October 24, l987 as previously committed.
It is our judgement that the on shift program is in compliance with the requirements of the order.
Accordingly, it is our understanding that there are no further order associated restrictions preventing the units from entering Mode 2
(star tup) following the current maintenance ou tages.
Please advise us if you do not concur with our understanding of the implementation requirements of the order.
Very truly yours, C. O. Wo Group President Nuclear Energy COW/PLP /gp cc:
Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 8711040120 87)030 PDR ADGCK 05000250 p
PDR ply PLP I /057/ I an FPL Group company
A