ML17342A995

From kanterella
Jump to navigation Jump to search
Forwards Procedure 0-ADM-019, Mgt on Shift, Per NRC 871019 Order.Augmented Mgt on Shift Program Initiated on 871024.Util Understands That No Further Order Associated Restrictions Prevent Plant from Entering Mode 2 Startup
ML17342A995
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/30/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17342A996 List:
References
L-87-443, NUDOCS 8711040120
Download: ML17342A995 (4)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

'CCESSION NOR: 87110401 DOC. DATE: 87/10/30 NO IZED: NO DOCKET ¹ FAC IL: 50-250 Turkey Point Plant> Unit 3 Florida Poujer and Light C 05000250 50-251 Turkey Point Plant> Unit 4> Florida Poujer and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION WOODY> C. O. Florida Poujer 5 Light Co.

RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forujards Procedure 0-ADM-019> "Mgt on Shift> " per NRC 871019 order.

DISTRIBUTION CODE: AOOID COPIES RECEIVED: LTR I ENCL + SIZE: /~ /6 TITLE: OR Submittal: General Distribution NOTES:

REC IP IENT COP IEB RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 0 PD2-2 PD 5 5 McDONALD> D 1 1 INTERNAL: ARM/DAF/LFMB 1 0 NRR/DEBT/ADS 1 NRR/DEBT/CEO 1 1 NRR/DEBT/MTH 1 NRR/DEBT/RSB 1 1 NRR/DOEA/TBB 1 1 NR A RB 1 1 OGC/HDS2 1 0 F 01 1 1 REB/DE/EIB 1 EXTERNAL: EG5G BRUSKE> S 1 1 LPDR 1 NRC PDR 1 NSIC 1 1 TOTAL NUMBER OF, COP IEB REQUIRED: LTTR 21 ENCL 18

~

~

l

), 1 Qy,g I,

)i l

P. O. BOX 14000, JUNO BEACH, FL 33408.0420 OCTOBER 3 0 1987 L-87-443 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 G ent I emen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-25 I Au mented Mana ement on Shift Pro ram Paragraph V.D.2 of the NRC order regarding Turkey Point Units 3 and 4 dated October I 9, I 987 requires FPL to provide a copy of the guidance document for the Management On Shift Program to the NRC. FPL has prepared Turkey Point Nuclear Plant Procedure O-ADM-OI9, titled Management on Shift, to provide administrative instructions to management personnel on shift. The instructions delineate the on shift program, guidelines, standards, policy clarifications and reporting requirements. A copy of this procedure is attached in compliance with the requirements of the order.

The augmented management on shift program was initiated on Saturday, October 24, l987 as previously committed. It is our judgement that the on shift program is in compliance with the requirements of the order. Accordingly, it is our understanding that there are no further order associated restrictions preventing the units from entering Mode 2 (star tup) following the current maintenance ou tages. Please advise us if you do not concur with our understanding of the implementation requirements of the order.

Very truly yours, C. O. Wo Group President Nuclear Energy COW/PLP /gp cc: Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 8711040120 87)030 ply PDR ADGCK 05000250 p PDR an FPL Group company PLP I /057/ I

A