ML17342A927
| ML17342A927 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 09/16/1987 |
| From: | NRC |
| To: | |
| Shared Package | |
| ML17342A928 | List: |
| References | |
| NUDOCS 8709300108 | |
| Download: ML17342A927 (6) | |
Text
TABLE 3.5-5 (Continued)
ACTION STATEMENTS ACTION 9 With the number of OPERABLE Channels less than the Minimum Channels OPERABLE requirements, restore the inoperable channel(s) 'to OPERABLE status within 08 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
If repairs are not feasible without shutting down:
'1.
Initiate an alternate method of monitoring the reactor vessel inventory; and 2.
Prepare and submit a Special Report to the Commission pursuant to Specification 6.9.3(n) within 30 days following the event outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status; and 3.
Restore at least one channel to OPERABLE status at the next scheduled refueling.
8709'300108 870926 PDR ADQCK 05000250
'('DR Amendment Nos. 125 and 119
gf
~
o r
%)
t ~
1 W ~
t
~"
TABLE3.5-5 (Continued)
ACTION STATEMENTS ACTION I With the number of OPERABLE accident'onitoring instrumentation channel(s) less than the Total Number of Channels shown in Table 3.5-5. either restore the inoperable channel(s) to OPERABLE status within 7 days, or be in a condition with Keff) < 0.99, % thermal power excluding decay heat equal to zero, and an average coolant temperature
- Tavg,
< 350oF within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
ACTION 2 With the number of OPERABLE accident monitoring instrumentation channels less than the minimum channels OPERABLE requirements of Table 3.5-5, either restore the inoperable channel(s) to OPERABLE status within 08 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, or be in a condition with Keff, < 0.99, % thermal power excluding decay heat equal to zero, and an average coolant temperature Tavg, < 350oF within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
ACTION 3 Operation may continue up to 30 days with Jess than minimum channels OPERABLE for narrow range instruments.
ACTION 0 Or close the associated block valve and open its circuit breaker.
ACTION 5 With the number of OPERABLE Channels less than required by the Minimum Channels OPERABLE requirements, initiate the preplanned alternate method of monitoring the appropriate parameter(s), within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, and:
1) either restore the inoperable channel(s) to OPERABLE status within 7 days of the event, or 2) prepare and submit a Special Report to the Commission pursuant to Specification 6.9.3 within 30 days following the event outlining the action
- taken, the cause of the inoperability, and the plans and schedule for restoring the system to OPERABLE status.
ACTION 6 With one hydrogen monitor inoperable, restore the inoperable monitor to OPERABLE status within 30 days or be in at least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
ACTION 7 With both hydrogen monitors inoperable, restore at least one monitor to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
ACTION 3 With the number of OPERABLE Channels one less than the Total Number of Channels restore the system to OPERABLE status within 7 days. If repairs are not feasible without shutting down, prepare and submit a Special Report to the commission pursuant to the specification 6.9.3(n) within 30 days following the event outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.
Amendment Nos. 125 and 119
g/
<r 1
TABLE 3.5-5 (Continued)'CTION STATEMENTS ACTION 9 With the number of OPERABLE Channels less than the Minimum Channels OPERABLE requirements,'estore the inoperable channel(s) 'to OPERABLE status within 08 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
If repairs are not feasible without shutting down:
l.
Initiate an alternate method of monitoring the reactor vessel inventory; and 2..Prepare and submit a Special Report to the Commission pursuant to Specification 6.9.3(n) within 30 days following the event outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status; and 3'.
Restore at least one channel to OPERABLE status at the next scheduled refueling.
Amendment Nos. 125 and 119 equi.e mme, ~-i~-87
e'
~ -, ~
'