ML17342A420
| ML17342A420 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/21/1986 |
| From: | Mcdonald D Office of Nuclear Reactor Regulation |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8603270363 | |
| Download: ML17342A420 (6) | |
Text
Docket Nos.
50-250 and 50-251 LICENSEE:
FACILITY:
SUBJECT:
DISTRIBUTION IIAR 2 I itSG6 NRC PDR Local PDR Florida Power and Light Company PAD¹2 Rdg J. Partlow Turkey Point Plant Units 3 and 4
L. Rubenstein DMcDonald OELD E. Jordan B. Grimes ACRS (10)
NRC Participants
SUMMARY
OF MEETING HELD WITH FLORIDA POWER AND LIGHT COMPANY MARCH 18,
- 1986, REGARDING TURKEY POINT PLANT TECHNICAL SPECIFICATIONS Back round Members of the NRC staff met with the licensee's representatives at Bethesda, Maryland, to discuss revision of the Turkey Point Plant, Units 3 and 4, Technical Specifications.
The licensee is in the process of converting the existing plant Technical Specifications to the format and content of the Standard Technical Specifications for Westinghouse Pressurized Water Reactors (NUREG-0452).
Details were discussed relating to integration with ongoing efforts, limitations and procedures relating to licensing approval.
The list of attendees is enclosed.
The licensee will submit a proposed schedule within three weeks.
The submi.ttal.
will include the rationale and basis to support the schedule.
The technical specification (TS) upgrade will eliminate the ambiguity in the existing TS and result in additional test and surveillance requirements.
The submittal will also take into consideration the near term improvements resulting from the industry and the NRC efforts to improve TS.
Plant specific justification will be provided for deviations from the Standard Technical Specifications and any near term.,improvements included in the TS upgrade.
As previously stated, we indicated we would keep the licensee appraised of any regulatory resource policy or procedural change which could impact their TS effort.
8603270363 86032i PDR ADOCK 05000250 P
Enclosure:
As stated cc w/enclos See next p,e PM:PAD¹ DMcDonald:hc 3/g V86 Daniel G. McDonald, Project Manager PWR Project Directorate ¹2 Division of PWR Licensing-A Office of Nuclear Reactor Regulation
~.
lit l III l
Mr. C. 0.
Woody Florida Power and Light Company Turkey Point Plant CC:
Harold F. Reis, Esquire Newman and Holtzinger, P.C.
1615 L Street, N.W.
Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Norman A. Coll, Esquire
- Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr. C.
M. Wethy, Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102 Mr. M. R. Stierheim County Manager of Metropolitan Dade County.
Miami, Florida 33130 Resident Inspector U.S. Nuclear Regulatory Commission Turkey Point Nuclear Generating Station Post Office Box 57-1185 Miami, Fl orida 33257-1185 Mr. Allan Schubert, Manager Public Health Physicist Department of Health and Rehabilitative Services 1323 Winewood Blvd.
Tallahassee, Florida 32301 Intergovernmental Coordination and Review Office of Planning 5 Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street Atlanta, Georgia 30323 Martin H. Hodder, Esquire 1131 NE, 86th Street Miami, Florida 33138 Joette Lorion 7269 SW, 54 Avenue Miami, Florida 33143 Mr. Chris J. Baker, Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304
r C
ATTENDANCE LIST D. G. McDonald C. Julian S. A. Elrod D. R. Brewer V.
Benaroya B. Clayton T. C. Gordon P.
Pace J.
K. Hays J. Arias, Jr.
C. M. Wethy J.
A. Labarraque C.
W. Moon L. S. Rubenstein Project Manager/NRR NRC Region II NRC Region II NRC Turkey Point Resident Inspector NRC/NRR/FOB NRC/NRR/FOB FPL FPL-Licensing FPL - Director of Licensing FPL - PTN Reg.
and Compl. Supv.
FPL PTN - V.P.
FPL - PEP Program Manager NRC/NRR/PWR-A/FOB NRR
y
~
~
P
~