L-85-368, Forwards Reactor Containment Bldg Integrated Leak Rate Test,Types A,B & C Periodic Test, Per 10CFR50 App J

From kanterella
(Redirected from ML17342A208)
Jump to navigation Jump to search
Forwards Reactor Containment Bldg Integrated Leak Rate Test,Types A,B & C Periodic Test, Per 10CFR50 App J
ML17342A208
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 09/26/1985
From: Williams J
FLORIDA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML17342A210 List:
References
L-85-368, NUDOCS 8509300190
Download: ML17342A208 (4)


Text

REGULATOf INFORMATION DISTRIBUTION TEM (RIDS)

ACCESSION NBR;8509300190.

DOC ~ DATE! 85/09/26 NOTARIZED; NO DOCKE~T' FACIL:50 250 Turkey Point. Planti Unit'g Florida Power 'and Light C

05000250 AUTH',NAME,'UTHOR AFFILIATION WILLI'AMSiJ ~ W."

Florida Power L Light Co; RECIP ~ NAME'ECIPIENT>> AFFILIATION DENTONiH.

Office~ of Nuclear Reactor Regul ationi Director>>

SUBJECT:

Forwards "Reactor Containment Bldg, Integrated Leak~ Rate" Test<

ppes A'i

~ 5 C.Per.iodic Test;",per 10CFR50, App J.

((

DISTRIBUTIOlf: A 1

PIES RECEIYED:LTR

'NCL 4" SIZE": "gg TITLE:

OR S4bmittal:

Append J Containment Leak. Rate Testing NOTES'L

~ 07/19/72; 05000250 RECIPIENT'D CODE/NAMEi NRR ORB4 BC Oli

~

COPIES'TTR ENCL>

7 7

RECIPIENT" ID CODE/NAME!

COPIES LiTTR ENCL>

INTERNAL:" ACRS 07 ELD/HDS4 08 NRR/DS I'/CSB" 06" RGN2 10 10 1

1 1

1 1a

]

ADM/LFMB EG.- FILE~

OA 1

0 1

EXTERNAL: 2AX NRC>> PDR<

02K 1i 1

1 1

LPDR NSIC 03~

05 1

1>>

1

, TOTAL NUMBER OF COPIES'- REQUIRED!

L'TTR 27 ENCL<

26"

M

~

fhhlh fh V

M

\\

h R

M ll I

'f M'

I e

M I

M

P.o. BOX 029100 MIAMI,FL 33102

<<QliI~~

FLORIDAPOWER & LIGHTCOMPANY SEP 2 8 198$

L-85-368 Office of Nuclear Reactor Regulation Attention: Mr. Harold Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Denton:

Re:

Turkey Point Unit 3 Docket No. 50-250 Reactor Containment Building Inte rated Leak Rate Test

'nclosed please find the summary technical report of the Reactor Containment Building Integrated Leak Rate Test QLRT) for Turkey Point Unit 3, as required by 10CFR50,. Appendix 3.

Very truly yours,

.W. Williams, 3r.

Group Vice President Nuclear Energy 3WW/SAV/mls Attachment cc:

Dr. 3. Nelson Grace, Region II Harold F. Reis, Esquire PNS-LI-85-330/2 8509300i90 850

,PDR

  • DOCK 05000>5D ',

'g-'

PDR PEOPLE... SERVING PEOPLE

/

1'