ML17341B663

From kanterella
Jump to navigation Jump to search
Public Version of Revision 1 to Emergency Plan Implementing Procedure 1004.14, Monitoring/Controlling Liquid Discharge for Normally Uncontaminated Sys.
ML17341B663
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 05/28/1982
From:
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML17341B664 List:
References
1004.14-01, 1004.14-1, NUDOCS 8206160241
Download: ML17341B663 (4)


Text

DISTRIBUTION

~;;Docket Fi.le RSB R/F Plant File: Turkey Point JGuttmann'<C~o~,

RSB JGuttmann R/F TSpeis +++up BSheron NLauben JUN. 04 198P rO NEt<ORANDS1 FOR: Thomas H. Novak, Assistant Director for Operating Reactors, DL FROI1: Themis P. Speis, Assistant Director. for Reactor Safety, DSI

SUBJECT:

SER TO THI ACTION ITEN II.K.3.25,FOR TURKEY POINT UNITS 3 5 4 Docket Number: 50-250/251 TAC Number: 40648 Plant Project Hanager: tl. Grotenhuis II.K.3.25 .Project t1anager: J. Hegner Review Branch: Reactor Systems Branch Review Status: Complete Me have reviewed Florida Power and Light Company's response to TflI Action Item II.K.3.25, as transmitted to RSB by DL for the Turkey Point Nuclear Power Stations. This Action Item requires licensees to demonstrate that the integrity of their reactor coolant pump (RCP) seals is maintained (e.g.,

adequately cooled) during a loss-of-offsite-power event.

The applicant's response stated that the reactor coolant pump sea'Is are cooled by two independent methods: (1) the chemical and volume control system, and {2) the component cooling water system. During a loss-of-off-site-power event, the RCP motor is de-energized and both cooling systems to the seals are terminated. However, the diesel generators are automatically started and "either" the seal injection flow or the component cooling water to the thermal barrier heat exchanger is automatically restored within seconds. Either of these cooling supplies is adequate to provide seal cool-ing and prevent seal failure during a loss-of-offsite-power event.

Me find the licensee's submittal acceptable, conditional upon the clarifica-tion of which system is automatically restored during a loss-of-offsite-power event (e.g.. component cooling water, seal injection, or both).

He request that you keep us appraised as to the applicant's response. Should you have questions regarding our review, please contact Jack Guttmann at X29442.

<g'al Sigaeg AcDlis p g~ p~

Themis P. Speis, Assistant Director for Reactor Safety, DSI cc: R. Capra.

J. Hegner {PN for II.K.3.25)

". Engle (P> for >Iorth Anna') . *SEE PREVIOUS CONCURRE E-SHEET FOR t4. Grotenhuis (PN for Turkey Point) ATES 5 ITIALS DSI:RSB* DS 'R D I:ADRS OFFICE CONTACT:. J. Guttmann ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

'"'NE) ..JRUtt5iND.:. d..ULauhen .. 0 ~ ~

820hi6042i 820604...,

05000250

)

06/'9 /82 06/+(82 06/Q J82 06/

/ /82

,CF. ADQCK

,, ~cp ',:,: .,"'~', 'FFICIAL RECORD COPY

Qi R ~,,

l 4

t C

I

(

'If

,P ',

I CLI J

gik

'7 0 4 MEMORANDUM R: Thomas M. Novak, Assistant Director for Operating Reactor, DL Themis P. Speis, Assistant Director for Reactor Safe, DSI FROH'UBJECT:

S TO THI ACTION ITEM II.K.3.25 FOR TURKEY POI UNITS 3 5 4 (DO ET S5O-25O/251) l<e have reviewed Florida wer and Light Company's resp@ se to THI Action Item II.K.3.25, as transmit d to RSB by DL for the T &key Point nuclear power stations. This Action tern requires licensee to demonstrate that the integrity of their reactor oolant pump (RCP) ea'Is is maintained (e.g.,

adequately cooled) during a loss of-offsite-pow event.

The applicant's response stated tha the re tor coolant pump seals are cooled by two independent methods: ) th chemical and volume control system, and (2) the component cooling r system. During a loss-of>>off-site-power event, the RCP motor is de- rgized and both cooling systems to the seals are terminated. However, e d sel generators are automatically started and "either" the seal inde ion flo or the component cooling water to the thermal barrier heat exch ger is auto atically restored within seconds. Either of these-cooli g suppl ies is /equate to provide seal cool-ing and prevent. seal'ailure ring a loss-of-of'ite-power event.

Me find. the licensee's su ittal acceptable, condit nal upon the clar ifica-tion of which system is tomatically restored during loss-of-offsite-power event (e.g., comp nent cool.ing water, seal in$ ec on, or both).

Ile request that you ep us appraised as to the applicant'esponse. Should you have questions egarding our review, please contact Jack uttmann at x29442.

Themis P. Speis, Assistant Direc or for Reactor Safety, DSI CC: R. Capri J. He ner (P/H for II.K.3.25) DISTRIBUTION L. En le (P/H for N. Anna)

H. G otenhuis (P/H for Turkey Point) RSB Rdg.

RSB Plant JGuttmann CONTACTS O. Guttmnnn, x29442 Guttmann Rdg.

Lauben Sheron TSpeis OFFICES RSB: DSI RSB: DSI ADRS:DSI SuRttaME) JGuttma :cs Lauben S eis

~ ~ ~ ~ ~ im ~

DATE P 5/Q/82 5/g(p/82 5/+82 5/ /82 NRC FORM 318 00/80) NRCM 0240 OFFICIAL RECORD COPY

  • USGFO: 1990-329424

rw Ch rwch a C>>

~ >>>> r = ~

~ I~

r C ~

rh ~ ~

g I PC h c'r" ~ c I

I Ih>>h rr ~ .

-~

Cr IP

~ P

>> I~ = P ~ I

- CI

~ 'r IC

~ '

~

P I w 4

>> 'I C