ML17341B648

From kanterella
Jump to navigation Jump to search
Requests Revision of Section 3.5.1.2 of Physical Protection Plan Re Search Procedures for Armed Uniformed Protective Svc Personnel.Metal Detection Capability Statement Should Be Revised to Be Consistent W/License Condition 9.A.3.28
ML17341B648
Person / Time
Site: 07000025
Issue date: 01/29/1982
From: Evans L
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Remley M
ROCKWELL INTERNATIONAL CORP.
References
NUDOCS 8203170222
Download: ML17341B648 (3)


Text

ACCELERATED DISTRIBUTION DEMONSTPATION SYSTEM 4'~j REGULATOR INFORMATION DISTRIBUTION TEM (RIDS)

X

'ACCESSION NBR:9203170222 DOC.DATE: 92/03/09 NOTARIZED:

NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and 'Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION PLUNKETT,T.F.

Florida Power a Light Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET ¹ 05000250 05000251

SUBJECT:

Revised Emergency Plan Implementing Procedure

20106, "Natural Emergencies."N/920309 ltr.

DISTRIBUTION CODE:

A045D COPIES RECEIVED:LTRi ENCLj SIZE: 9 7 TITLE: OR Submittal:

Emergency Preparedness

Plans, Implement'g Procedures, C

NOTES:NRR RAGHAVAN,L NRR RAGHAVAN,L Ce,'pg y/wr/cu-REC1'PIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD/DOA/IRB NUDOCS-ABSTRACT EXTERNAL: NRC PDR NOTES:

COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME AULUCK,R NRRJ DREE/~E PB9 D R

~FILE 7

Ol=

N IC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 05000250 05000251 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WAS'ONTACTTHE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 9

ENCL 9

P.O. Box 029100, Miami, FL, 33102-9100 NR'09 1992 L-92-53 10 CFR 50 Appendix E

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.

20555 Gentlemen:

Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 Emer enc Plan Im lementin Procedure In accordance with the requirements of 10 CFR 50 Appendix E, enclosed is one copy of the following revised Emergency Plan Implementing Procedure (EPIP):

Number Title Im lementation Date 20106 Natural Emergencies 02/14/92 EPIP 20106 was revised to remove the requirements of temporary flood protection for the Emergency Diesel Generator fuel oil transfer pumps.

The fuel oil transfer pumps have been raised above the maximum design flood elevation specified in the Updated Final Safety Analysis Report.

Should there be any questions please contact us.

Very truly yours, pP~~-

T. F. Plunkett Vice President Turkey Point Nuclear TFP/OIH enclosure cc:,

Stewart D. Ebneter, Regional Administrator, Region II, USNRC (2 copies)

R.

C. Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant (no enclosure) 9203170222 920309

)/

PDR'ADOCK 05000250 F

PDR an FPL Group company

~q5

~

~

W Ik