ML17341A724
| ML17341A724 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 10/20/1981 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML17341A722 | List: |
| References | |
| 50-250-81-20, 50-251-81-20, NUDOCS 8112170022 | |
| Download: ML17341A724 (4) | |
Text
APPENDIX A "NOTICE OF VIOLATION Florida Power
& Light Company Turkey Point 3
& 4 Docket Nos.
50-250
& 50-251 License Nos.
& DPR-41 0
As a result of the inspection conducted on August'26 - September 25,
- 1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980),
the following violations were identified.
A.
Technical Specification 6.8.1 requires the establishment and implementation of written procedures for safety-related activities.
Administrative Procedure 103.2, Duties and Responsibilities of Operators on Shift and t1aintenance of Operating Logs and Records, specify that technical specifi-cation time limits be entered on the Equipment Out of Service Log.
Contrary to the above, on September 9, 1981, an inadequate review to recognize that only one boric acid transfer pump was available resulted in the failure to enter Technical Specification 3.6.d.2 time limit on the Equipment Out of Service Log when one of the Unit 3 and Unit 4 boric acid transfer pumps were taken out of service.
/
This is a Severity Level V Violation (Supplement I.E.).
B.
Technical Specification 3.9.1.i. requires that steam generators be con-tinuously monitored while being blown down to assure that releases to the environmental are within the limits specified in 10 CFR Part 20.
Contrary to the above, on August 21, 1981, Unit 4 steam generator 4A was blown down for about three minutes with its blowdown sample isolation valve FCV 4-1427 shut.
This is a Severity Level Y Violation (Supplement I.E.).
Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to this office within thirty days of the date of this Notice, a written statement or explanation in reply, including:
(1) admission or denial of the alleged viola-tions; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.
Consideration may be given to extending your response time for good cause shown.
Under the authority of Section 182 of the Atomic Energy Act of
- 1954, as
- amended, this response shall be submitted under oath or affirmation.
8if2i70022 8ii208 PDR ADOCK 05000250 G
DR
J l
t
Florida Power 5 Light Company Notice of Violation Docket Nos.
50-250 5 50-251 License Nos.
& DPR-41 The responses directed by this Notice are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.