FLORIDA POWER AND LIGHT COMPANY TURKEY POINT UNITS 3 AND 4 EMERGENCY PROCEDURE 20126 OCTOBER 15 1981
1.0 Title
OFF-SITE DOSE CALCULATIONS 2.0 A
royal and List of Effecti ve Pa es:
2.1
~Arcual:
Change Dated 10/15/81 Reviewed PNSC October 15 1981 Approved by Approved by 2.2 List of Effective Pa es:
Plant Mgr-Nuclear, ~
'ce President Power Resources 19~c8 24 195'7
~Pa e
Date
~Pa e
Date
~Pa e
Date
~Pa e
Date 1
10/15/81 5
2 10/15/81 6
3 10/15/81 7
4 10/15/81 8
3.0
~Sco e:
3.1
~Pur ose:
10/15/81 10/15/81 10/15/81 10/15/81 9
10/15/81 13 10/15/81 10 10/15/81 14 10/15/81 11 10/15/81 15 10/15/81 12 10/15/81 This procedure provided guidelines for calculating thyroid and whole body dose rates and integrated whole body and thyroid dose for the area surrounding the plant out to ten miles.
3.2 Discussion
During any emergency involving release of radioactivity to the environment, the Emergency Plan requires that radiation dose rates and integrated doses to offsite areas within ten miles be calculated.
This information will be used in making protective action recoranendations and will be an input to the State of Florida Bureau of Disaster Preparedness in determining what offsite protective actions should be taken.
When the Technical Support Center or the Emergency Operations Facility are operational, the function of dose calculation will be shifted to one of these locations.
3.3
~Authorit This procedure implements the Turkey Point Plant Radiological Emergency Plan.