ML17341A571

From kanterella
Jump to navigation Jump to search
Amend 66 to License DPR-41,authorizing Continued Operation of Facility for 10 Equivalent Full Power Months from 810113
ML17341A571
Person / Time
Site: Turkey Point 
Issue date: 09/10/1981
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17341A572 List:
References
NUDOCS 8110130097
Download: ML17341A571 (5)


Text

~p,S RE@(

~4 O

~

+c

+a**+

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 FLORIDA*POMER AND LIGHT COMPANY DOCKET'NO; 50-251

'TURKEY POINT PLANT, UNIT NO.

4

'AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

66 License No.

DPR-41 1

~

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application'or amendment by Florida Power and Light Company (the licensee) dated Duly 30, 1981, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the CoInnission C.

There is reasonable.assurance

{i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and {ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the ComIission's:regulations and all applicable requirements

'ave been satisfied.

8ii0i30097 8i09i0 >

PDR ADOCK 0500025i'i PDR

2.

Accordingly, paragraph 3.D.l of the license is amended to read as follows:

D.

Steam Generator Ins ection l.

After operation of six* equivalent full power months from the last inspection of all three steam generators, Turkey Point Unit 4 shall be brought to cold shutdown condition and all three steam generators shall be inspected unless; (1) an inspection of the steam generators is performed within this period, or (2) an extention is granted by the NRC to authorize period. of operation.

Any request for continued operation must be submitted at least 45 days prior to the expiration date of the authorized period of operation.

'For, the purpose of this requirement equivalent operation is defined as operation with the reactor coolant at a temperature greater than 350'F.

  • extended to ten equivalent full power months of operation. for cycle 7 subject to the following conditions:

(1)

The NRC staff shall be promptly notified in the event of any detectable trends in the indicated primary to secondary

leakage, and (2) If the reactor is shutdown because of steam generator leakage the subsequent findings and any corrective action shall be discussed with the NRC staff prior to the resump-tion of power operation.

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COIRIISSION

Attachment:

Changes to the Technical Specifications Date of Issuance:

September 10, 1981 Steven A. Varga, ief.

Operating Reactors ranch

..1 Division of Licensing

ATTACHMENT TO L'ICENSE AMENDMENT AMENDMENT NO.

66 TO FACILITY OPERATING LICENSE NO.

DPR-41 DOCKET NO. 50-251 Replace the iollowing 'page of Facility Operating License No.

DPR-41 as indicated.

B.

Technical Specifications The Technical Specifications contained in Appendices A and B as revised through Amendment Ho.

are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

C.

This license is subject to the following conditions for the protection of the environment:

(1) The applicant shall pursue evaluations of al ernatives to

.he proposed cooling;channel system during construction, interim operation, and evaluation of the channel sys

.em.

These evaluations shall include at least the following:

(a) Study of availabili

.y of groundwater or other alternative sources of surface water to use in the cooling system.

(b) Study of applicability of mechanical cooling devices, including powered spray modules and cooling owers.

(c) Study of marine environmental impacts of once-through cooling alternatives (described in Section X of the AEC Final Environmental Statenen on Turkey Point. Units 3 and 4, July 1972).

(23 The applicant shall take appropriate corrective action on any adverse effects determined as' result of monitoring and s.udy programs.

To.he fulles ext nt prac icable, the applicant shall utilize results of s udy programs in improving and modi ying :he opera ion of the acility and its cooling sys em so as to achi ve a minimal adv rse environmen

.al impac..

0.

S.earn Generator inspec ion 1

A.er operat on of six equivalent full power mon hs from the las. inspection of all

.hree s.earn generators, Turkey Point Unit shall be brought to.he cold shutdown;condition and all

.h'r e s.earn generators shall be inspec.ed unless:

(1) an inspec.ion of the s.earn generators

',s per,ormed witl(in this period, or (2) an extention is granted

."y.he HRC.o authorize period of operation.

Any reques. for continued operation must be submitted at 'i'east 45 days prior to the expiration date o,

the

. authorized period o

o.. ra-tion.

or the purpose of this requiremen equivalent operation is defined as operation with.he reac or coolant at,a temperature greater than 350 F.

  • extended to ten quivalent full oower months for cycle 7

subject to the following conditions:

(1) the HRC staff shall be promptly notified in the event of any detectable trends in the indicated primary to secondary

leakage, and (2) if the reactor is shutdown because of steam generator leakage the subsequent findings and any corre'ctive action shall be discussed with the HRC staff prior to the resumption of power.operation Amendment No.

66

0