ML17341A290

From kanterella
Jump to navigation Jump to search
Response in Support of NRC 810427 Motion for Summary Disposition of Contention 4B.Repair Schedule Should Not Be Based on Timing of Hurricane Season or Low Probability of Tornadoes
Date released: 07/31/2018 Download: ML17341A290


Comparative Study of Fl Most Severe Tornadoes W/Those in Other Parts of Continental Us.
ML17341A293
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 12/20/1974
From: Brooks E, Gerrish H, Hiser H, Senn H
BOSTON COLLEGE, CHESTNUT HILL, MA, MIAMI, UNIV. OF, CORAL GABLES, FL
To:
References
Download: ML17341A293 (72)
Affidavit Re Risks Posed by Hurricanes & Tornadoes on Repair Activity & Sgla Storage.Prof Qualifications & Certificate of Svc Encl
ML17341A292
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 05/04/1981
From: Flugger F, Jabali H, Wan P
BECHTEL GROUP, INC., FLORIDA POWER & LIGHT CO.
To:
References
Download: ML17341A292 (56)
Response in Support of NRC 810427 Motion for Summary Disposition of Contention 4B.Repair Schedule Should Not Be Based on Timing of Hurricane Season or Low Probability of Tornadoes
ML17341A288
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 05/05/1981
From: Reis H
FLORIDA POWER & LIGHT CO., LOWENSTEIN, NEWMAN, REIS, AXELRAD & TOLL
To:
Atomic Safety and Licensing Board Panel
References
Download: ML17341A288 (4)