AVERAGE'DAILYUNITPOWER LEVEL DOCKET NO.

50 250 Turkey Point.

DATE Tune 6

1981 COMPL'ETED IIY T'- Chilson MONTf&

MAY, 1981 DAY'VER'AGEDAIL'YPOWER LEVEL.

(MWe-Net)

DAY AVERAGEDAlLYPOWER'LEVEL (MWe-Net) 18.

5 6;

7O 20'L 2Z 23'4:

25'3:

14 l516'S'-'9'1 INSTRUCTIONS Qn tliis format; list the'average daily unit power level'in MWeNet for each day in the reporting'month; Compote to thenearest'whole megawatt.

{'r(77) 816 6 z e o i79

IQ I

11

OPERATING DATAREPORT OPERATING STATUS I. Unit Name Tur Z. Reporting Period:

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

No.

3 DOCKET NO. ~u~~1981 COMPLETED BY ~~)LU,son TELEPHONE ~~j52-3824-Notes Unit No.

3 remained'ut of service; due to the; failure of the Generator'tator Core

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through,7) Since Last Report'. Give Reasons:

9'. Power L'evel To Which Restricted. If'Any(Net'MWe):

IO. Reasons Fur Restrictions, IfAny:

This Month.

Yr..to.Date<<

744;0 '

'623.0 1 459.3 408. 0 631.0 I'85.6 3 025 27T 940 415 922 586' 1 789'8.2 38.

2'9.

4 0

36.6 100.0:

Type, Date. and Duration of Each):

I l. Hours In Reporting Period IZ. Number Of Hours Reactor Was Critical, I3'. Reactor Reserve Shutdown Hours l4; Hours Generator On-Line.

l5. Unit R'eserve Shutdown Hours.

16; Gross. Thermal'Energy Generated (MWH)

17. Gross Electrical Energy Generated.(MWH),

Ig. Net Electrical Energy. Generated (MWH) l9'. Unit Service Factor ZO. Unit Availahility Factor Zl. Unit Capacity Factor (Using MDC Net)

ZZ. Unit.Capacity Factor (Using DER;Net)

Z3. Unit Forced Outage-Rate Z4. Shutdowns Scheduled Over Next 6 Months I Cumulative 74 408.6 55 760.3 844.4 53'91.0 121.8 109-'97 555 34 693'25 32 83K 071

72. 4 72.6 68.6 6

5: IfShut.D wn,At,End Of;Report Period, Eti ted:D ofStart p

Z6; Units.ln Test Status {Priorto Commercial'Operation)t Forecast Achieved.'NITIA L

CRITICALITY'N ITIAL.ELECTRICITY COMMERCIAL,OPERATION Iil/77,)

1It

UNIfS))ll'fDOWNS AND POIYER I(/DURATIONS PEN OR T h(ONTII MAY 1981 DOCKE'f QO.

UQ)T N$ME DATE ri S~

Vo.

Vh O

A J

~

10

~ g C/l LI<<cllscc Event Repoil =

Cautc Ec (.'I>ircclive AcllollIo I'reve>>I Rc<<urrcnce Pl-0$-21 7)4.0 GE+RA (n) stator corp failed while preparing go synchronize generator after schedule4 refueling.

(Continued from previous montP)

(kfon-nuclear system) f': ForccrI S: Scheer!!crl Reason'.

A-Equip>>tent failure (Explain)

II.h1aintenance nr Tesl C-Rcfueliot, D.Regulatory Reslri<<l(oo I:. Operator Trainiot',8: Li<<cose Exaolillalion I"Adnuolstlative G.opclallooal Llror (Explalll)

I I Other (Explailr) hfethog:

I 4(annal 2.h(ant!pl Serai!I.

3.Auto!Italic Serai>>.

0 Qtl~g+ajlt!I.'o(Itinuinp g-r.oqP RegqctIon rI-Otgpr (Explain)

I!Xhibit G - InSlru<<lionS lor Preparation nl Data Lolry Sheets lot l.ice>>see Event Report (I.Lrlh!File (NUTMEG.

OI6I)

Lrxhibil I

~ Salo" gotlrcc

AVERAGE DA'ILY;UNITPOWER. LEVEL'.

DOCKET NO 50 251 MONTH MAY; 1981 DAY AVERAGE'DAIL'YPOWER:L'EVEL (MWe-Net) 671 DAY"',AVERAGEDAILYPOWER. LEVEL'.

(MWe-Net) 662'7 9.

10-'4-15 l6-INSTRUCTIONS.

673'78'76 677 678 668 668'66 666 I S.

12.

24:

25'6 28s 30>

31 NOTE::

662'64:

66-7'6T 671 678 656 550 673:

669 667 Average. daily'ower level greater than.

646, MWe, due to cooler.

condenser cooling water Qn this format; list theaverage.daily-unit. power level. in MWe-Net for each day in the reporting month: Computeto the. nearest. whole megawat t..

(0/771

~

~i 4

OPERATING DATAREPORT DOCKET NO.

DATE, Mn~

1983 COMPLETED'BY %~~~son TELEPHONE ZBLi3'~3824-OPERATING STATUS 646 Turke Point Unit No.. 4

2. Reporting Period:
3. Licensed. Thermal Power (MWt):

2200

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
7. Maximum Dependable Capacity (Net MWe):

N<<es-Unit No. 4 operated at.

approximately 100X R.P'., ex-ceptt for load reduction of May 25.-26,. 1981:..

8; IfChanges Occur in Capacity Ratings (Items Number 3 Through.7) Since. Last Report'. Give. Reasons; 9'. Power Level To Which Restricted. IfAny (Net'MWe):

10. Reasons For Restrictions, lfAny:

This Month Yr:to-Date Cumulative 3 623.0 68 136.

0 3 186.0 50 198.9 166.6 6 768 949 101 150 304

2. 182. 270 32 155.'43.

2 072 505 30 456 525 0

85.9 71.1 88.6 69.4 3.0 I I. Hours In Reporting Period 744.0

12. Number Of Hours Reactor Was Critical 744.0
13. Reactor Reserve Shutdown Hours

-0<< 14. Hours Generator On-Line 744 0

15. Unit'Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH)
l. 634 117 17: Gross Electrical Energy GeneratetL(MWH)
18. Net Electrical Energy Generated (MWH)

I9. Unit Service Factor 100. 0

20. Unit AvailabilityFactor 100. 0
21. Unit Capacity Factor (Using MDC Net) 103. 1
22. Unit Capacity Factor IUsing DER,Net),
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months(Type, Date. and Duration of Each):

Steam, Generator Tube Ins ection Program Jul

11. - Au ust 14, 1981
25. IfShut-Down At End Of R'eport Period'. Estimated Date ofStartup:

26-. Units ln:Test Status

{Prior. to Commercial, Operation):

F.orecast',

Achieved.

INITIAL CRITICALITY INITIAL EL'ECTRICITY.

COMMERCIALOPER'ATION'o/77 I

UNI'fSIIU')DOWNS AND PQW)R PEI)U/T)ONS REPORT hIONfll MAY 1981 2-382 Dale rr A,J C/l Ltu.nscc F-vcIll Rcporl -"

Cause & ('urrectivc A<<tiorl to j'rcvcrtl Recurrcn<<c 08 81-95-.25 B N/A QALQHX Load reduction to perform periodic test of turgine main steam stop, reheat stop, and reheat intercept yalyes.

(Non-nuclear systetn)

F: Forced S: Sclredulcd

! I117)

Reason:

Q.Equipmcnt Failure (Explain) 8-hIairrtenaltce or Tesl C.Refueling D Regulatory Restri<<tio>>

E-Operator Training & I.iccrlsc Lxanljnaljon I'dntrntsl fallvc G.Operational Error (j:xplaiit)-

I j Ot her (E xplairr )

hjethod:

I.hlanual 2 hlanual Scram.

3 Autornali<<Scranl.

QWIr+HK+pbitHContinuing g-Loqd Re4ucttion g-Other (gx plain)

Exhibit G - Instructions lor Preparatii>It of Data Entry Sheets I'or l.rccnsee Evc>>l Report I I.E R 1 File (NUREG.

016I )

Exjlibil I - Sante Source

Qi

II '

AVERAGEDAILYUNLT.POWER. LEVEL DA~ Zune 6, 198 1 COMPLETED IIY V.T.

Chilson'ONTHS MAY',. 1981.

DAY,'AVERAGE'DAILYPOWER: LEVEL',

(MWe-Net)

I 78 DAY AVERAGE DAIL'YPOWER'LEVEL (MWe-Net) 78 17 3

7'8' 10' 2'5 l6i INSTRUCTIONS-.

785'8T 78'0'8.

788 784-'75:

7 8 0 788.

89 790 789~

790'89:789'8 26.

27 2S~

'79l 30>

31 NOTE'79.

74'3'88'88.

790:

- '783' 90 782'75 791.

789'92.

.Average d'aily power level greater than 777* MWe due, to cooler condenser cooling water..

On this'format; list the average, daily unit power, level in MWe-Net for each;day in.the reporting. month. Contpute to

.the nearest;whole megawatt:

~l~

I

4 OPERATING DATAREPORT CCCHETNO.

3E - 333 DATE Jmm ~81 COMPCETEE EV V T. Chilson TELEPHONE l3333L532-383!i OPERAT1 i4G STATUS I. Unit Name:

St Tucie Unit. No. 1

2. Reporting Period:
3. Licensed. Thermal Power (MWt):

2560

4. Nameolate Rating (Gross MWe):

S.

Design Electrical Rating (Net MWe):

6. Maximum Dependable Capacity (Gross MWe):

77 Notes Unit, operated. at.

approximately 100X'.P., ex-ce'pt for load. reduction of May 4-5,, 1981

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report'. Give Reasons:

9'; PowerLevel To Which Restricted. IFAny (Net MWe);

10. Reasons For Restrictions; IfAny:

This Month Yr.-to-Date Cumulative:

8 891 512 Z 758'47 s

11. Hours In'Reporting Period
12. Number Of Hours Reactor. Was Critical, 744.0 3 503.7
13. Reactor. Reserve Shutdown Hours 14; Hours Generator On-Line 744. 0.
15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) 1 181 121
17. Gross Electrical Energy Generated.(MWH)

'l8'.,Net Electrical Energy Generated:. (MWH) 578'91

19. Unit'Service Factor 100'.0 96.7 20; Unit AvailabilityFactor 100;0'6.7

~~. Unit Capacity Factor (Using DER Net)

~D. Unit ForcetLOutage Rate 0

7

24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and, Duration of Each I:

Scheduled refuelin maintenance and ins ections - October 31 929.0 129.5 39.3'6 139 660 4 723 720 23'85'33'9.9 80; 0" 5'.3 4 - December 5

1981.

253 IfShut Down At End,Of;R'eport,Period; Estimated.DateofiStartup:

26; Units In:Test Status (Prior to Commercial:Operation):

Forecast'chieved.

INITIAL CRITICALITY INITIAL EL'ECTRICITY'OMMERCIA'L,OPER'ATlON

('>/77 )

~ ~

VN)'f$))U')DOWNS AND PQWgR PEPLJCTIOQS Pg)ORT MONfi)

MAY 1981 Y "'DD=DDY-D..

D".. DY~

TELEP))ON/

go,l DD; gz b

r)

D ID))

)r, ac r>C

)I> $

Lice>>sec Event Report =

Cause 8) Cr>rrc<<ltvc A<<rior> to f'rcvcot Re<<urrco<<c 03 81-05-04 B

N/A PIP/XX (E)

Load reduction to pepair sweam leak located in jiping between

))P turbine and moisture-separistor-reheater.

Corrective actions includeg repairs by gelding.

(Non-pucleqr system) l': F)>r<<ed S: Sch>>du!crl Reason:

A-Equipntent Failure (Explain)

B.h)aintena!tce or Test C Refueling D Regulatory Restriction E-Opera!>>r Trainiog 4. Li<<crtsc Exaotittalion F-Ad>nioistrative G.Operational Error (t.xp!aIn)

It Other (Exp)air>)

h)ethod:

I.hlanual 2.hiartual Serg>!t.

3.Automatic Scraro.

9+hqrg&pliti>HContinuing 5-,Load Re))tction r)-Other (IIqplt)in)

Exltibit G - Instructions for Pref>atalloo of Data L'>>try Sheets for Licensee Event Report (l.ER) Fil>> (NLIREG.

OI6))

Exltibit I - Sam>> Source

I+I

" SUMMERY'Z OPERATING EXPERIENCE'OCKET NO.

5'0 250 Turkey Point Unit No.

3 June 6', 1981 COHPZXZZD: BY V., T'. Chilson TELEPHONE.

(305.)

552-3824',

'EPORT'ONTE MAY'i. 1981 Uni&No; 3 remained'. out. of. service:

due-. to. the. fai1ure of the Generator; Stator. Core Refer. to; "Uni't Shutdowns; ancL Power Reductions,'-'ection.

of; Hay'1981.. Operating:, Status'eport. far.acMitionaL" information Major Safety-related; maintenance: activities performed. during the month.

fncZuded."

Inspections:.

ance requirements. of'E BuIleti:ns: and; NUREG-0578: are continuing.

Florida:, Power

& Light Company. commitments, for NUREG-0578-.implementation. are" continuing., ~Refer to correspondence between FPL, and. NRC for ad-ditionaI: information Started.- preparationr. for In-Service Inspections of. reactor, vessel

I

~

~

SUMMA OP OPERATXNG'XPERZENCE DOCKET NO-50 251 Turkey Point UNET Unit No.

4 DATE.

June 6,

1981 CQBPEIHKD"~

V. T.. Chilson

'REPORT'ONTEE (305) 552-3824'nit=

No"=. 4: operated: at: approximately.

XOOt R P'except for load'eduction.

of May. 25.-26,. 1981 Refer to'Unit Shutdowns; and. Power Reductions."

sectiozx. of May:

E9&ZOperating. Status-Report for additiozzaZ izzformatiozr.

Ma.j.or Safety-related maintenance activities. performed. during the month included.:..

inspections and'equirements. of ZE Bulletins and. NUREG-057& in progress.

Florida Power 6 Light, Company-commitments for NUREG-057&', implementation. are continuing Refer to correspondence between FPL.and, NRC for ad'ditional information

I~

I 4