ML17341A232
| ML17341A232 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 06/06/1981 |
| From: | Chilson V FLORIDA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML17341A231 | List: |
| References | |
| NUDOCS 8106160179 | |
| Download: ML17341A232 (22) | |
Text
AVERAGE'DAILYUNITPOWER LEVEL DOCKET NO.
50 250 Turkey Point.
DATE Tune 6
1981 COMPL'ETED IIY T'- Chilson MONTf&
MAY, 1981 DAY'VER'AGEDAIL'YPOWER LEVEL.
(MWe-Net)
DAY AVERAGEDAlLYPOWER'LEVEL (MWe-Net) 18.
5 6;
7O 20'L 2Z 23'4:
25'3:
14 l516'S'-'9'1 INSTRUCTIONS Qn tliis format; list the'average daily unit power level'in MWeNet for each day in the reporting'month; Compote to thenearest'whole megawatt.
{'r(77) 816 6 z e o i79
IQ I
11
OPERATING DATAREPORT OPERATING STATUS I. Unit Name Tur Z. Reporting Period:
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
No.
3 DOCKET NO. ~u~~1981 COMPLETED BY ~~)LU,son TELEPHONE ~~j52-3824-Notes Unit No.
3 remained'ut of service; due to the; failure of the Generator'tator Core
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through,7) Since Last Report'. Give Reasons:
9'. Power L'evel To Which Restricted. If'Any(Net'MWe):
IO. Reasons Fur Restrictions, IfAny:
This Month.
Yr..to.Date<<
744;0 '
'623.0 1 459.3 408. 0 631.0 I'85.6 3 025 27T 940 415 922 586' 1 789'8.2 38.
2'9.
4 0
36.6 100.0:
Type, Date. and Duration of Each):
I l. Hours In Reporting Period IZ. Number Of Hours Reactor Was Critical, I3'. Reactor Reserve Shutdown Hours l4; Hours Generator On-Line.
l5. Unit R'eserve Shutdown Hours.
16; Gross. Thermal'Energy Generated (MWH)
- 17. Gross Electrical Energy Generated.(MWH),
Ig. Net Electrical Energy. Generated (MWH) l9'. Unit Service Factor ZO. Unit Availahility Factor Zl. Unit Capacity Factor (Using MDC Net)
ZZ. Unit.Capacity Factor (Using DER;Net)
Z3. Unit Forced Outage-Rate Z4. Shutdowns Scheduled Over Next 6 Months I Cumulative 74 408.6 55 760.3 844.4 53'91.0 121.8 109-'97 555 34 693'25 32 83K 071
- 72. 4 72.6 68.6 6
5: IfShut.D wn,At,End Of;Report Period, Eti ted:D ofStart p
Z6; Units.ln Test Status {Priorto Commercial'Operation)t Forecast Achieved.'NITIA L
CRITICALITY'N ITIAL.ELECTRICITY COMMERCIAL,OPERATION Iil/77,)
1It
UNIfS))ll'fDOWNS AND POIYER I(/DURATIONS PEN OR T h(ONTII MAY 1981 DOCKE'f QO.
UQ)T N$ME DATE ri S~
Vo.
Vh O
A J
~
10
~ g C/l LI<<cllscc Event Repoil =
Cautc Ec (.'I>ircclive AcllollIo I'reve>>I Rc<<urrcnce Pl-0$-21 7)4.0 GE+RA (n) stator corp failed while preparing go synchronize generator after schedule4 refueling.
(Continued from previous montP)
(kfon-nuclear system) f': ForccrI S: Scheer!!crl Reason'.
A-Equip>>tent failure (Explain)
II.h1aintenance nr Tesl C-Rcfueliot, D.Regulatory Reslri<<l(oo I:. Operator Trainiot',8: Li<<cose Exaolillalion I"Adnuolstlative G.opclallooal Llror (Explalll)
I I Other (Explailr) hfethog:
I 4(annal 2.h(ant!pl Serai!I.
3.Auto!Italic Serai>>.
0 Qtl~g+ajlt!I.'o(Itinuinp g-r.oqP RegqctIon rI-Otgpr (Explain)
I!Xhibit G - InSlru<<lionS lor Preparation nl Data Lolry Sheets lot l.ice>>see Event Report (I.Lrlh!File (NUTMEG.
OI6I)
Lrxhibil I
~ Salo" gotlrcc
AVERAGE DA'ILY;UNITPOWER. LEVEL'.
DOCKET NO 50 251 MONTH MAY; 1981 DAY AVERAGE'DAIL'YPOWER:L'EVEL (MWe-Net) 671 DAY"',AVERAGEDAILYPOWER. LEVEL'.
(MWe-Net) 662'7 9.
10-'4-15 l6-INSTRUCTIONS.
673'78'76 677 678 668 668'66 666 I S.
12.
24:
25'6 28s 30>
31 NOTE::
662'64:
66-7'6T 671 678 656 550 673:
669 667 Average. daily'ower level greater than.
646, MWe, due to cooler.
condenser cooling water Qn this format; list theaverage.daily-unit. power level. in MWe-Net for each day in the reporting month: Computeto the. nearest. whole megawat t..
(0/771
~
~i 4
OPERATING DATAREPORT DOCKET NO.
DATE, Mn~
1983 COMPLETED'BY %~~~son TELEPHONE ZBLi3'~3824-OPERATING STATUS 646 Turke Point Unit No.. 4
- 2. Reporting Period:
- 3. Licensed. Thermal Power (MWt):
2200
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 7. Maximum Dependable Capacity (Net MWe):
N<<es-Unit No. 4 operated at.
approximately 100X R.P'., ex-ceptt for load reduction of May 25.-26,. 1981:..
8; IfChanges Occur in Capacity Ratings (Items Number 3 Through.7) Since. Last Report'. Give. Reasons; 9'. Power Level To Which Restricted. IfAny (Net'MWe):
- 10. Reasons For Restrictions, lfAny:
This Month Yr:to-Date Cumulative 3 623.0 68 136.
0 3 186.0 50 198.9 166.6 6 768 949 101 150 304
- 2. 182. 270 32 155.'43.
2 072 505 30 456 525 0
85.9 71.1 88.6 69.4 3.0 I I. Hours In Reporting Period 744.0
- 12. Number Of Hours Reactor Was Critical 744.0
- 13. Reactor Reserve Shutdown Hours
-0<< 14. Hours Generator On-Line 744 0
- 15. Unit'Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH)
- l. 634 117 17: Gross Electrical Energy GeneratetL(MWH)
- 18. Net Electrical Energy Generated (MWH)
I9. Unit Service Factor 100. 0
- 20. Unit AvailabilityFactor 100. 0
- 21. Unit Capacity Factor (Using MDC Net) 103. 1
- 22. Unit Capacity Factor IUsing DER,Net),
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months(Type, Date. and Duration of Each):
Steam, Generator Tube Ins ection Program Jul
- 11. - Au ust 14, 1981
- 25. IfShut-Down At End Of R'eport Period'. Estimated Date ofStartup:
26-. Units ln:Test Status
{Prior. to Commercial, Operation):
F.orecast',
Achieved.
INITIAL CRITICALITY INITIAL EL'ECTRICITY.
COMMERCIALOPER'ATION'o/77 I
UNI'fSIIU')DOWNS AND PQW)R PEI)U/T)ONS REPORT hIONfll MAY 1981 2-382 Dale rr A,J C/l Ltu.nscc F-vcIll Rcporl -"
Cause & ('urrectivc A<<tiorl to j'rcvcrtl Recurrcn<<c 08 81-95-.25 B N/A QALQHX Load reduction to perform periodic test of turgine main steam stop, reheat stop, and reheat intercept yalyes.
(Non-nuclear systetn)
F: Forced S: Sclredulcd
! I117)
Reason:
Q.Equipmcnt Failure (Explain) 8-hIairrtenaltce or Tesl C.Refueling D Regulatory Restri<<tio>>
E-Operator Training & I.iccrlsc Lxanljnaljon I'dntrntsl fallvc G.Operational Error (j:xplaiit)-
I j Ot her (E xplairr )
hjethod:
I.hlanual 2 hlanual Scram.
3 Autornali<<Scranl.
QWIr+HK+pbitHContinuing g-Loqd Re4ucttion g-Other (gx plain)
Exhibit G - Instructions lor Preparatii>It of Data Entry Sheets I'or l.rccnsee Evc>>l Report I I.E R 1 File (NUREG.
016I )
Exjlibil I - Sante Source
Qi
- II '
AVERAGEDAILYUNLT.POWER. LEVEL DA~ Zune 6, 198 1 COMPLETED IIY V.T.
Chilson'ONTHS MAY',. 1981.
DAY,'AVERAGE'DAILYPOWER: LEVEL',
(MWe-Net)
I 78 DAY AVERAGE DAIL'YPOWER'LEVEL (MWe-Net) 78 17 3
7'8' 10' 2'5 l6i INSTRUCTIONS-.
785'8T 78'0'8.
788 784-'75:
7 8 0 788.
89 790 789~
790'89:789'8 26.
27 2S~
'79l 30>
31 NOTE'79.
74'3'88'88.
790:
- '783' 90 782'75 791.
789'92.
.Average d'aily power level greater than 777* MWe due, to cooler condenser cooling water..
On this'format; list the average, daily unit power, level in MWe-Net for each;day in.the reporting. month. Contpute to
.the nearest;whole megawatt:
~l~
I
4 OPERATING DATAREPORT CCCHETNO.
3E - 333 DATE Jmm ~81 COMPCETEE EV V T. Chilson TELEPHONE l3333L532-383!i OPERAT1 i4G STATUS I. Unit Name:
St Tucie Unit. No. 1
- 2. Reporting Period:
- 3. Licensed. Thermal Power (MWt):
2560
- 4. Nameolate Rating (Gross MWe):
S.
Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
77 Notes Unit, operated. at.
approximately 100X'.P., ex-ce'pt for load. reduction of May 4-5,, 1981
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report'. Give Reasons:
9'; PowerLevel To Which Restricted. IFAny (Net MWe);
- 10. Reasons For Restrictions; IfAny:
This Month Yr.-to-Date Cumulative:
8 891 512 Z 758'47 s
- 11. Hours In'Reporting Period
- 12. Number Of Hours Reactor. Was Critical, 744.0 3 503.7
- 13. Reactor. Reserve Shutdown Hours 14; Hours Generator On-Line 744. 0.
- 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) 1 181 121
- 17. Gross Electrical Energy Generated.(MWH)
'l8'.,Net Electrical Energy Generated:. (MWH) 578'91
- 19. Unit'Service Factor 100'.0 96.7 20; Unit AvailabilityFactor 100;0'6.7
~~. Unit Capacity Factor (Using DER Net)
~D. Unit ForcetLOutage Rate 0
7
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and, Duration of Each I:
Scheduled refuelin maintenance and ins ections - October 31 929.0 129.5 39.3'6 139 660 4 723 720 23'85'33'9.9 80; 0" 5'.3 4 - December 5
1981.
253 IfShut Down At End,Of;R'eport,Period; Estimated.DateofiStartup:
26; Units In:Test Status (Prior to Commercial:Operation):
Forecast'chieved.
INITIAL CRITICALITY INITIAL EL'ECTRICITY'OMMERCIA'L,OPER'ATlON
('>/77 )
~ ~
VN)'f$))U')DOWNS AND PQWgR PEPLJCTIOQS Pg)ORT MONfi)
MAY 1981 Y "'DD=DDY-D..
D".. DY~
TELEP))ON/
go,l DD; gz b
r)
D ID))
)r, ac r>C
)I> $
Lice>>sec Event Report =
Cause 8) Cr>rrc<<ltvc A<<rior> to f'rcvcot Re<<urrco<<c 03 81-05-04 B
N/A PIP/XX (E)
Load reduction to pepair sweam leak located in jiping between
))P turbine and moisture-separistor-reheater.
Corrective actions includeg repairs by gelding.
(Non-pucleqr system) l': F)>r<<ed S: Sch>>du!crl Reason:
A-Equipntent Failure (Explain)
B.h)aintena!tce or Test C Refueling D Regulatory Restriction E-Opera!>>r Trainiog 4. Li<<crtsc Exaotittalion F-Ad>nioistrative G.Operational Error (t.xp!aIn)
It Other (Exp)air>)
h)ethod:
I.hlanual 2.hiartual Serg>!t.
3.Automatic Scraro.
9+hqrg&pliti>HContinuing 5-,Load Re))tction r)-Other (IIqplt)in)
Exltibit G - Instructions for Pref>atalloo of Data L'>>try Sheets for Licensee Event Report (l.ER) Fil>> (NLIREG.
OI6))
Exltibit I - Sam>> Source
I+I
" SUMMERY'Z OPERATING EXPERIENCE'OCKET NO.
5'0 250 Turkey Point Unit No.
3 June 6', 1981 COHPZXZZD: BY V., T'. Chilson TELEPHONE.
(305.)
552-3824',
'EPORT'ONTE MAY'i. 1981 Uni&No; 3 remained'. out. of. service:
due-. to. the. fai1ure of the Generator; Stator. Core Refer. to; "Uni't Shutdowns; ancL Power Reductions,'-'ection.
of; Hay'1981.. Operating:, Status'eport. far.acMitionaL" information Major Safety-related; maintenance: activities performed. during the month.
fncZuded."
Inspections:.
ance requirements. of'E BuIleti:ns: and; NUREG-0578: are continuing.
Florida:, Power
& Light Company. commitments, for NUREG-0578-.implementation. are" continuing., ~Refer to correspondence between FPL, and. NRC for ad-ditionaI: information Started.- preparationr. for In-Service Inspections of. reactor, vessel
I
~
~
SUMMA OP OPERATXNG'XPERZENCE DOCKET NO-50 251 Turkey Point UNET Unit No.
4 DATE.
June 6,
1981 CQBPEIHKD"~
V. T.. Chilson
'REPORT'ONTEE (305) 552-3824'nit=
No"=. 4: operated: at: approximately.
XOOt R P'except for load'eduction.
of May. 25.-26,. 1981 Refer to'Unit Shutdowns; and. Power Reductions."
sectiozx. of May:
E9&ZOperating. Status-Report for additiozzaZ izzformatiozr.
Ma.j.or Safety-related maintenance activities. performed. during the month included.:..
inspections and'equirements. of ZE Bulletins and. NUREG-057& in progress.
Florida Power 6 Light, Company-commitments for NUREG-057&', implementation. are continuing Refer to correspondence between FPL.and, NRC for ad'ditional information
I~
I 4