APPENDIX A NOTICE OF VIOLATION Florida Power and Light Turkey Point 3 and 4
Docket Nos. 50-250 & 50-251 License Nos.
DPR-31 8 DPR-41 As a result of the inspection conducted on February 26
- March 25,
- 1981, and in accordance with the Interim Enforcement
- Policy, 45 FR 66754 (October 7, 1980),
the following violation was identified.
Technical Specification 6.8. 1 requires written procedures and administrative policies be established, implemented, and maintained that meet the require-ments and recommendations of Section
- 5. 1 and 5.3 of ANSI 18.7-1972 and Appendix "A" of Regulatory Guide 1.33.
Operating Procedure
- 5120, Waste Disposal System - Laundry and Hot Shower System - Normal Operation did not specify waste water tranfer to CVCS Monitor Tank A.
Contrary to the above, on March 10, 1981 operating procedure 5120 was not followed in that laundry waste water was inadvertently transferred to CVCS Monitor Tank A which subsequently overflowed.
t This is a Severity Level V Violation (Supplement I.E.).
Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit-to this office within twenty-five days of the date of this Notice, a written state-ment or explanation in reply, including:
(1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.
Under the authority of Section 182 of the Atomic Energy Act of
- 1954, as amended, this response shall be submitted under oath or affirmation.