Notice of Deviation from Insp on 810101-28
ML17340B312
Person / Time
Site: Turkey Point  
Issue date: 03/17/1981
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML17340B297 List:
References
50-251-81-02, 50-251-81-2, NUDOCS 8106080443
Download: ML17340B312 (2)


Text

APPENDIX B NOTICE. OF DEVIATION Florida Power and Light Company Turkey Point4'ocket No. 50-251 License No.

DPR-41 Based on the results-of the, U.S..

Nuclear Regulatory Commission inspection conducted on January 1-28, 1981 certain of. your activities appear to deviate from your commitments to the Commission as indicated below:

Your September 16, 1980 response to IE Bulletin No.

80-20, Failures of.

Westinghouse Type W.-2 Spring. Return to Neutral Control Switches, stated in response 2 that a, continuity test will be repeated on all the control switches listed at least every ninety-two (92) days after the init,ial test.

Contrary to the. above, the continuity test was not repeated:

on. the.: required, switches until

, more than 92 days had elapsed since the initial test.

'The tests were performed on November 29, 1980 after the resident inspector's identification; This is a.deviation..