ML17340B164

From kanterella
Jump to navigation Jump to search
Forwards LER 81-006/03L-0
Date released: 07/31/2018 Download: ML17340B164


LER 81-006/03L-0:on 810324,rept Not Submitted Per Tech Spec 6.9.2.b.2 When Action Mode of Tech Spec 3.1.5.d Was Entered. Caused by Misinterpretation of Reporting Requirements.Plant in Process of Obtaining Interpretations of Requirements
ML17340B165
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 04/23/1981
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17340B165 (3)
Forwards LER 81-006/03L-0
ML17340B163
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 04/23/1981
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17340B163 (1)