ML17340A789

From kanterella
Jump to navigation Jump to search
Amends 63 & 55 to Licenses DPR-31 & DPR-41 Respectively, Moving Precipitation Sample Station to Uncontaminated Area, Insuring Capability of Obtaining Reliable Monthly Precipitation Samples from Onsite Location
ML17340A789
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/23/1981
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17340A790 List:
References
NUDOCS 8103060267
Download: ML17340A789 (7)


Text

UNITEDSTATES NUCLEAR REGULATORY COMMtSSION WASHINGTON, D. C. 20555 FLORIDA POWER AND LIGHT COMPANY DOCKET NO. 50-250 TURKEY POINT PLANT UNIT NO.

3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

63 License No.

DPR-31 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

B.

C.

D.

E.

The application for amendment by Florida Power and Light Company (the licensee) dated December 31, 1980, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the COIIIIission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

~030IIO Qg7 2.

Accordingly,, the license is amended by changes to the Technical Specifications as indicated in, the attachment to this license amendment, and paragraph 3.B of Facility Operating License No.

DPR-31 is hereby amended to read as follows:

(B)

Technical S ecifications The Technical Specifications contained in. Appendices A and B, as revised through Amendment No.

63, are'ereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment's effective as of the date of its issuance.

FOR THE NUCLEA REGULATORY COMMISSION

Attachment:

Changes to the Technical Specifications Date of Issuance:

February 23, 1981 eve Ak

arga, C

> f Operating Reactors nch Pl

~ Division of Licensing

+p,R flEg>

P

~4 0

Cy UNITEDSTATES NUCLEAR REGULATORY COMMJSSION WASHINGTON, D. C. 20555 FLORIDA POWER AND LIGHT COMPANY DOCKET NO. 50-251 TURKEY POINT PLANT UNIT NO.

4 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 55 License No.

DPR-41 1.

The Nuclear Regulatory Commission {the Commission) has found that:

A.

The application for amendment by Florida Power and Light Company (the licensee) dated December 31, 1980, complies with the standards and requirements of. the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application,.

the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment c'n be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the. common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with'0 CFR Part 51 of the Commission's regulations and a'll 'applicable requirements have been satisfied.

2 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No.

DPR-41 is hereby amended to read as follows:

(B)

Technical S ecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.

~b, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance.

F THE NUCLEAR R GULATORY COMMISSION

, Chi teven A.

V rg Operating Reactors nch 81 Division of Lice'nsing

Attachment:

Changes to the Technical Specifications Date of Issuance:

February 23, 1981

ATTACHMENT TO LICENSE AMENDMENTS AMENDMENT NO. 63 TO FACILITY OPERATING LICENSE NO.

DPR-31 AMENDMENT NO. 55 TO FACILITY OPERATING LICENSE NO.

DPR-41 DOCKET NOS.

50-250 AND 50-251 Revise Appendix A as follows:

Table 4.12-1 Table 4.12-1

TABLE 4.12 SHEET 1

OPERATIONAL ENVIRONMENTAL RADIOLOGICAL SURVEILLANCE PROGRAM (1)

Criteria and Sam lin Locations Collection Fre uenc 2

Anal sis/Countin AIR

~

1.1 Particulate and Iodine Comparison of on-site versus off-site

& reference locations 3 locations on-site in prevailing wind directions from plant T58, T71, T72 4 locations off-site within a radius of 10 miles of plant in prevailing wind directions from the plant T51, T52, T56, T57 1 location for reference 22 miles north of plant site T64 Weekly Gross Beta Gamma spectral analysis of monthly. composite..

if 'indicat ed by high beta activity Radioactive Iodine 1.2 Direct Radiation 1.3 Precipitation (3)

MATER 2.1 Surface Water 2.1.1 Estuarine

'.1.2 Cooling Canal System Amendment Nos.

63

& 55 Comparison of on-site versus off-site

& reference locations Sampling locations same'as

1. 1, plus off-site on North Key Largo T70 Comparison of on-site versus off-site

& reference locations 1 location on-site T72 1 location for refer ence 22 miles north of plant site T64 2 locations off-site within a radius of 10 miles of plant in prevailing wind directions from the plant T52, T57 5 locations - Biscayne Bay T51, T67, T69,

T71, T93 5 locations - Card South T66, T81, T86, T94, T95 1 location - Lake Warren T84 1 location - Loch Rosetta T97 Monthly Monthly quarterly Monthly Determine direct radiation exposure by TLD readout Gross beta Galena spectral analysis (4)'

Tritium (4)

Gamma spectral analysis Tritium Sr-89

& 90 (if detected in 2.1.2

~

~

aroma spectral analysis rltlum Sr-89

& 90