ML17340A449

From kanterella
Jump to navigation Jump to search
Forwards LER 80-020/03L-0
Date released: 07/31/2018 Download: ML17340A449


LER 80-020/03L-0:on 801018,periodic Test of RHR Pump 3A Not Completed within Prescribed Time Interval.Caused by Personnel Being Unaware That 3A 4160-volt Bus Returned to Svc.Scheduling Sys Modified
ML17340A450
Person / Time
Site: Turkey Point 
Issue date: 11/14/1980
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17340A450 (2)
Forwards LER 80-020/03L-0
ML17340A448
Person / Time
Site: Turkey Point 
Issue date: 11/14/1980
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17340A448 (1)