ML17340A116

From kanterella
Jump to navigation Jump to search
Forwards LER 80-008/01X-1,updating 800519 Initial Rept
Date released: 07/31/2018 Download: ML17340A116


Forwards LER 80-008/01X-1,updating 800519 Initial Rept
ML18008A015
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 08/11/1980
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18008A015 (1)
LER 80-008/01X-1:on 800505,insp & Reanalyses Per IE Bulletin 79-14 Revealed Inadequate Support of 3A & 3B Resistance Temp Detector Bypass Loops.Change Mod Installed to Properly Support Piping
ML17340A115
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 08/11/1980
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17340A115 (3)