Text

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 50 250 COMPLETED BY TEI.EPHONE (305) 552-3824 MONTH APRIL 1978 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) (MWe-Net) 679 674 '7 679 18 675'52 19 678 20 481 21 673 ~ ~

672 23 6 3 670 24 680 669 25 679 10 26 514 672 7 671 12 670 28 549 13 672 29 674 14 675 30 646 15 674 16 675 NOTE: Average dao.ly power level greater than 666 MWe due to cooler condenser cooling water.

INSTRUCTIONS On this format, list the average daily unit power level in M1Ve-Net for each day in the reporting month: Compute to the nearest whole megawatt.

(0/77) 8 0{)42 QO

OPERATING DATA REPORT DOCKET NO. 50-250 DATE 5~~78 COMPLETED BY ~.T. Chilson TELEPHONE, ~305 552-3824 OPERATING STATUS Notes Unit No.'-3 operated I. Unit Name: T rke Reportihg period: A ril Po'.

1978 at approximately 100% R.P.

except for outage of April 2200

3. Licensed Thermal Power (MWt): 19-20; 1978, and load reduc-
4. Nameplate Rating (Gross hIWe): tion's on April 26 and 28,
5. Design Electrical Rating (Net MWe): 1978.
6. hlaximum Dependable Capacity (Gross Mme): 700 7 Mx a imumDe p endableCa p acit y(NethIWe:

666

)

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To 'LVhich Restricted, IfAny (Net MWe): NONE
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative

'9

12. Number Of Hours Reactor Was Critical 7 15 ~ 3 1 766.1 36.992.0
13. Reactor Reserve Shutdown Hours 0.0 34.3 145.4
14. Hours Generator On-Line 713.1 1 648.9 35 735.3
15. Unit Reserve Shutdown Hours 0.0 85.0
16. Gross Thermal Energy Generated (MWH) 1 537 183 3 479 197 70 253 389
17. Gross Electrical Energy Generated (MWH) 496 430
18. Net Electrical Energy Generated (MWH) 1 060 '995 21 207 645
19. Unit Service Factor 99.2 57.3 75.5
20. Unit Availability Factor ~ 2 . 57.3 75.6
21. Unit Capacity Factor (Using MDC Net) 98.7 55.3  : . . 68.0
22. Unit Capacity Factor (Using DER Net)

'4.8. 53 ~ 3 64;6

23. Unit Forced Outage Rate 0.5 0.4 2.7
24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each): ~

Steam Generator Tube Tns ection Pro ram Au ust 17 '- Se tember ll 1978

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMhIERCIAL OPERATION

('>/77 I

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 250 VNITNAME Turke Point Unit No. 3 COMPLETED BY V REPORT MONTH APRIL, 1978 rs 0 A.0V Licensee ~Ill Cause & Corrective n o ~

No. Date I/I Event Q Action to fJ

~0 CA Rcport ~ E~

O Prevent Recurrence Cr 78-04-19 5.9 B N/A RB CRDRVE Reactor was manually tripped during the perfornance of reactor physics tests when three control rods were out of alignment with their bank by more than allowable limits. (Nuclear system) 78-04-26 A N/A HC HTEXCH Load reduction to locate and repair (B) condenser tube leak. (Non-nuclear system) 78-04-28 A 4 N/A HC HTEXCH Load reduction to locate and repair (D) condenser tube leak. (Non-nuclear system) 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A.Equipment Failure (Explain) I -Manual for Preparation of Data B-Maintenance oi Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Rcport (LER) File (NVREG-D.Regulatory Restriction 4 Otllcf (Explallt) OI6I)

E.Operator Training & Uccnsc Examination F-Administrative G.Operational Error (Explain) Exhibit I - Satne Source

(')/77) I I.Other (Explain)

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

Tur ey Pox.nt COMPLETED IIY V. T. Chilson MONTH APRIL, 1978 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) (MWe.Net) 674 660 17 671 IS 62 19 658 669 20 653 666 21 655 665 22 660 663 23 665 662 24 614 660 25 650 10 662 26 657 27 666 12 663 28 670 13 659 29 668 14 658 30 663 15 658 16 662 NOTE: Average daily power level greater than 666 MWe due to cooler condenser cooling water.

INSTRUCTIONS On this format, list the average daily unit power level in Mme-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(<>!7>>

OPERATING DATA REPORT DOCKET NO. 50-251 DATE ~Ma 6 1978 COMPLETI.:D IIY V.T. Chilson TELEPHOiVE. ~~-3824 OPERATING STATUS Turke Point Unit No. 4 Notes - Unit No. 4 operated Unit Name at approximately 1.

2. Reporting Period: A ril, 1978 except for 100% R.P.

the load reduc-.

3, Licensed Thermal Power (MWt):

2200 tion on April 24-25,. 1978.

4. Nameplate Rating (Gross MWc): 760
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 700
7. Ma x imum De p endable Ca p acit y(Net MWe: 666

)

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Reuort. Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe): NON
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date ..Cumulative 41'88.0

11. Hours In Reporting Period Number Of Hours Reactor Was Critical ~

'19 719.

0'2.

~ 0 2

2 879.0 318.1 0:0 "

29 791.0 138;8

13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 719.0 2 312.'1 28 435.4
15. Unit Reserve Shutdown Hours 0.0 0..0 1 569 518 5 052 271 . 60 137 939 16.

17.

18.

Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH) 498 805 475 161 100.0 1 613 1 534 694 80.3 655

8 19 437 580 431 179 69.2

19. Unit Service Factor
20. Unit Availability Factor 80.3 ;69.2
21. Unit Capacity Factor (Using MDC Net) 99.2 80.0 67.9
22. Unit Capacity Factor (Using DER Net)

'5.3 76.9 64. 7'.1

23. Unit Forced Outage Rate 0.0 0.0
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):.

Refueling, Maintenance, and Inspections July 25 September 18, 1978'.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units ln Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION I<)/77 l

251 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO 50 UNITNAMFTurke Point Unit No. 4 COMPLETED BY V REPORT MONTH APRIL 1978 PI A<< c~

C Licensee Cause k. Corrective o ~D No. Date EA Event Action to CJ

~v C/l C Report 4 O E~ Prevent Recurrence c: CJ 78-04-24 B 4 N/A VALVEX and

'oad test reduction to perform periodic of turbine main steam stop, VALOP reheat stop, and reheat intercept valves. (Non-nuclear system)

F: Forced.

S: Scheduled Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling 3

Method:

I-Manual 2-Manual Scram..

.3-Automatic Scram.

'xhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) OI6 I )

E-Operator Training &. Liccnsc Examination F-Administrative G.Operational Error (Fxplain) Exhibit I - Sante SourlY.

(9/77) I I-Other (Explain) 4

AVERAGE DAlLYUNIT POWER LEVEL DOCKET NO.

St. Lucre UNIT Unit No. 1 COMPLETED BY V T Chi1son TELEPHONE (3O5) 552-3824 MONTH APRIL 1978 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) (MWe.Net) 17 18 19 20 2]

22 23 24

'75 10 26 27 12 28 13 29 14 30 15 16 INSTRUCTIONS On this format, list the average daily unit power level in MIVe.Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9I77 )

OPERATING DATA REPORT DOCKET NO. 'i~O-DATE COMPLETED BY ~V.

~V~78

~~son TELEPHONE. ~~-3824 OPERATING STATUS St. Lucie Unit No. 1 'otes - Unit No.'1 remained

2. Reporting Period: A ril 1978 out of s'ervice for scheduled refueling, maintenance, and 3, Licensed Thermal Power (MWt):

2560 inspections.

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross hDVe):
7. Maximum De p endable Ca p acit y(Net MWe: )
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, If Any: .

This Month Yr.-to.Date .Cumulative

11. Hours In Reporting Period 719.0 2 879.0 .11 903.0 2 003.0 03.1 12.

13.

Number Of Hours Reactor Was Critical Reactor Reserve Shutdown Hours 0.0 ~ ':0 9 101.5

14. Hours Generator On-Line 0.0
15. Unit Reserve Shutdown Hours 0.0 0..0 Q.O
16. Gross Thermal Energy Generated (MWH) 0.0 4 891 229 22 740 443 l7. Gross Electrical Energy Generated (MWH) 0.0 1 599 030 7 393 790 2 870 1 506 283 6 948 860
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 0.0 69.0 81.1
20. Unit Availability Factor 0.0 69.0 81.1
21. Unit Capacity Factor (Using MDC Net) 0.0 67.3 75.1
22. Unit Capacity Factor (Using DER Net) 0.0 65.2 72;8
23. Unit Forced Outage Rate 0.0 1.6 8.4
24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each): ~
25. If Shut Down At End Of Report Period, Estimated Date of Startup: June 10 1978
26. Units In Test Status (Prior to Commercial Operation}: Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

('t/77 }

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50

o. 1 COMPLF TED Ily jt. T. Chilson REPORT MON fH APRIL 1978 No. Date PI 4/i Cl a

~ Vl fP~

Licensee Event Report 4'Vl o ~O E~

O cr Cause & Corrective Action to Prevent Recurrence 78-03-28 S 719.0 C N/A zz zzzzzz Unit No. 1 remained out of service for scheduled refueling, maintenance, and inspections. (Nuclear. and non-nuclear systems) (Continued from previous month) 3 F: Forced. Reason: Method: Exhibit G - Instructions S: Scheduled A.Equipment Failure (Explain) I-Manual for Preparation of Data B.Maintenance or Test 2-Manual Scram. "..ntry Sheets for Licensee C-Refueling 3-Automatic Scram., Event Report (LER) File (NUREG.

D-Regulatory Restriction 4-Other (Exphin) OI 6I )

E-Operator Training & License Examination F-Administrative G.Operational Error (Explain) Exhibit I - Satne Source (9177) I I-Other (Explain)