AVERAGE DAILYUNITPOWER LEVEL DOCKET NO. 50 250 COMPLETED BY TEI.EPHONE (305) 552-3824 MONTH APRIL 1978 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 679 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 674

'7 10 12 13 14 15 16 INSTRUCTIONS 679 678 673 670 669 672 670 672 675 674 675 18 19 20 21

~

~

23 24 25 26 7

28 29 30 NOTE:

675'52 481 672 6

3 680 679 514 671 549 674 646 Average dao.ly power level greater than 666 MWe due to cooler condenser cooling water.

On this format, list the average daily unit power level in M1Ve-Net for each day in the reporting month: Compute to the nearest whole megawatt.

(0/77) 8 0{)42 QO

OPERATING DATAREPORT OPERATING STATUS DOCKET NO.

50-250 DATE 5~~78 COMPLETED BY ~.T. Chilson TELEPHONE, ~305 552-3824 Notes Unit No.'-3 operated at approximately 100% R.P.

except for outage of April 19-20;

1978, and load reduc-tion's on April 26 and 28, 1978.

I. Unit Name:

T rke Po'.

Reportihg period:

A ril 1978

3. Licensed Thermal Power (MWt):

2200

4. Nameplate Rating (Gross hIWe):
5. Design Electrical Rating (Net MWe):
6. hlaximum Dependable Capacity (Gross Mme):

a imumDe endableCa acit NethIWe:

700 666 7 Mx p

p y(

)

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To 'LVhich Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

NONE This Month Yr.-to-Date Cumulative 36.992.0 145.4 35 735.3 85.0 70 253 389 1 060 '995 21 207 645 57.3 75.5 75.6 55.3 68.0 64;6 2.7

12. Number Of Hours Reactor Was Critical 715 ~ 3 1 766.1
13. Reactor Reserve Shutdown Hours 0.0

-': 34.3

14. Hours Generator On-Line 713.1 1 648.9
15. Unit Reserve Shutdown Hours 0.0
16. Gross Thermal Energy Generated (MWH) 1 537 183 3 479 197
17. Gross Electrical Energy Generated (MWH) 496 430
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 99.2
20. Unit AvailabilityFactor'9

~ 2

. 57.3

21. Unit Capacity Factor (Using MDC Net) 98.7
22. Unit Capacity Factor (Using DER Net)

'4.8.

53 ~ 3

23. Unit Forced Outage Rate 0.5 0.4
24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):

~

Steam Generator Tube Tns ection Pro ram Au ust 17 '- Se tember ll 1978

25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMhIERCIALOPERATION

('>/77 I

UNITSHUTDOWNS ANDPOWER REDUCTIONS REPORT MONTH APRIL, 1978 DOCKET NO. 50 250 VNITNAMETurke Point Unit No.

3 COMPLETED BY V No.

Date rs I/I fJ 0

0 A.Vn 0~ CA Licensee Event Rcport ~

~Ill o ~

QE~

O Cr Cause &Corrective Action to Prevent Recurrence 78-04-19 5.9 B

N/A RB CRDRVE Reactor was manually tripped during the perfornance of reactor physics tests when three control rods were out of alignment with their bank by more than allowable limits.

(Nuclear system) 78-04-26 A N/A HC HTEXCH (B)

Load reduction to locate and repair condenser tube leak.

(Non-nuclear system) 78-04-28 A 4

N/A HC HTEXCH (D)

Load reduction to locate and repair condenser tube leak.

(Non-nuclear system)

F: Forced S: Scheduled

(')/77)

Reason:

A.Equipment Failure (Explain)

B-Maintenance oi Test C-Refueling D.Regulatory Restriction E.Operator Training & Uccnsc Examination F-Administrative G.Operational Error (Explain)

I I.Other (Explain)

Method:

I -Manual 2-Manual Scram.

3-Automatic Scram.

4 Otllcf(Explallt) 4 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Rcport (LER) File (NVREG-OI6I)

Exhibit I - Satne Source

AVERAGE DAILYUNITPOWER LEVEL DOCKET NO. Tur ey Pox.nt COMPLETED IIY V. T. Chilson MONTH APRIL, 1978 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 674 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) 660 17 10 12 13 14 15 16 INSTRUCTIONS 671 669 666 665 663 662 660 662 663 659 658 658 662 IS 19 20 21 22 23 24 25 26 27 28 29 30 NOTE:

62 658 653 655 660 665 614 650 657 666 670 668 663 Average daily power level greater than 666 MWe due to cooler condenser cooling water.

On this format, list the average daily unit power level in Mme-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(<>!7>>

OPERATING STATUS OPERATING DATAREPORT DOCKET NO.

50-251 DATE

~Ma 6

1978 COMPLETI.:D IIY V.T. Chilson TELEPHOiVE.~~-3824 Notes - Unit No.

4 operated at approximately 100% R.P.

except for the load reduc-.

tion on April 24-25,. 1978.

1. Unit Name Turke Point Unit No.

4

2. Reporting Period:

A ril, 1978 3, Licensed Thermal Power (MWt):

2200

4. Nameplate Rating (Gross MWc):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Ma imum De endable Ca acit Net MWe:

666 760 700 x

p p

y(

)

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Reuort. Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

NON This Month Yr.-to-Date

..Cumulative

11. Hours In Reporting Period 719.

0'2.

Number Of Hours Reactor Was Critical

~ '19

~ 0

13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 719.0
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1 569 518
17. Gross Electrical Energy Generated (MWH) 498 805
18. Net Electrical Energy Generated (MWH) 475 161
19. Unit Service Factor 100.0
20. Unit AvailabilityFactor
21. Unit Capacity Factor (Using MDC Net) 99.2
22. Unit Capacity Factor (Using DER Net)

'5.3

23. Unit Forced Outage Rate 0.0
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration Refueling, Maintenance, and Inspections July 2 879.0 2 318.1 0:0 "

2 312.'1 0.0 41'88.0 29 791.0 138;8 28 435.4 0..0 1 613 655 19 437 580 1 534 694 8 431 179 80.3 80.3 80.0 76.9 0.0 69.2

69.2 67.9 64.

7'.1 of Each):.

25 September 18, 1978'.

5 052 271 60 137 939

25. IfShut Down At End Of Report Period. Estimated Date of Startup:
26. Units ln Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION I<)/77 l

UNITSHUTDOWNS AND POWER REDUCTIONS REPORT MONTH APRIL 1978 DOCKET NO 50 251 UNITNAMFTurke Point Unit No.

4 COMPLETED BYV No.

Date PI EA CJ A<<

C v

C

~ C/l c:

Licensee Event Report 4 c~

o ~D E~

O CJ Cause k. Corrective Action to Prevent Recurrence 78-04-24 B 4

N/A VALVEX and VALOP

'oad reduction to perform periodic test of turbine main steam stop, reheat stop, and reheat intercept valves.

(Non-nuclear system)

F: Forced.

S: Scheduled (9/77)

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training &. Liccnsc Examination F-Administrative G.Operational Error (Fxplain)

II-Other (Explain) 3 Method:

I-Manual 2-Manual Scram..

.3-Automatic Scram.

4-Other (Explain)'xhibitG - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-OI6 I )

Exhibit I - Sante SourlY.

4

AVERAGE DAlLYUNITPOWER LEVEL DOCKET NO. St. Lucre UNIT Unit No.

1 COMPLETED BY V T

Chi1son TELEPHONE (3O5) 552-3824 MONTH APRIL 1978 DAY AVERAGEDAILYPOWER LEVEL (MWe-Net) 10 12 13 14 15 16 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) 17 18 19 20 2]

22 23 24

'75 26 27 28 29 30 INSTRUCTIONS On this format, list the average daily unit power level in MIVe.Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9I77 )

OPERATING DATAREPORT DOCKET NO.

'i~O-DATE ~V~78 COMPLETED BY

~V. ~~son TELEPHONE. ~~-3824 OPERATING STATUS

'otes - Unit No.'1 remained out of s'ervice for scheduled refueling, maintenance, and inspections.

St. Lucie Unit No.

1

2. Reporting Period:

A ril 1978 3, Licensed Thermal Power (MWt):

2560

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross hDVe):
7. Maximum De endable Ca acit Net MWe:

p p

y(

)

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:.
11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) l7. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months This Month 719.0 0.0

~

0.0 Yr.-to.Date 2 879.0 2 003.0

':0

.Cumulative

.11 903.0 9

03.1 101.5 0.0 0.0 0.0 2 870 0..0 Q.O 4 891 229 22 740 443 1 599 030 7 393 790 1 506 283 6 948 860 69.0 69.0 67.3 65.2 1.6 81.1 81.1 75.1 72;8 8.4 0.0 0.0 0.0 0.0 0.0 (Type, Date. and Duration of Each):

~

25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation}:

June 10 1978 Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIALOPERATION

('t/77 }

UNITSIIUTDOWNS AND POWER REDUCTIONS REPORT MONfH APRIL 1978 DOCKET NO. 50 COMPLFTED Ily jt. T. Chilson o.

1 No.

Date PI 4/i Cl fP~

a

~ Vl Licensee Event Report4'Vl o ~O E~

Ocr Cause &Corrective Action to Prevent Recurrence 78-03-28 S

719.0 C

N/A zz zzzzzz Unit No.

1 remained out of service for scheduled refueling, maintenance, and inspections.

(Nuclear. and non-nuclear systems)

(Continued from previous month)

F: Forced.

S: Scheduled (9177)

Reason:

A.Equipment Failure (Explain)

B.Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G.Operational Error (Explain)

I I-Other (Explain) 3 Method:

I-Manual 2-Manual Scram.

3-Automatic Scram.,

4-Other (Exphin)

Exhibit G - Instructions for Preparation of Data

"..ntry Sheets for Licensee Event Report (LER) File (NUREG.

OI 6I )

Exhibit I - Satne Source