ML17339A805

From kanterella
Jump to navigation Jump to search
Forwards LER 80-003/03L-0
Date released: 07/31/2018 Download: ML17339A805


LER 80-003/03L-0:on 800215,while Testing 4C Steam Generator Feedwater Control Valve,Rapid Change in Steam Generator Level Resulted in Lifting RV-1410 Which Did Not Fully Reseat.Caused by Binding Between Gear & Nut.Valve Tested
ML17339A806
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 03/17/1980
From: Schoppman M
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17339A806 (2)
Forwards LER 80-003/03L-0
ML17339A804
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 03/17/1980
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17339A804 (2)