Forwards Draft Suppl to Fire Protection Safety Evaluation Re Incomplete Items Identified in 790321 Rept.Requests Util Response Re Alternative to Satisfy Item 3.2.2.Status Sheet Re Open Item Encl
ML17339A558
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/26/1980
From: Lainas G
Office of Nuclear Reactor Regulation
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML17339A559 List:
References
NUDOCS 8002150217
Download: ML17339A558 (4)


Text

A. Schwencer 2

JAN 28 1S80 Me have also enclosed a status sheet to reflect the present status of each fire protection open item.

Contact:

L. Derderian, X27690

Enclosures:

1; Status Sheet 2.

Safety Evaluation Report cc w/enclosures:

D. Eisenhut R. Tedesco R. Vollmer V. Benaroya P. Matthews G. Lainas R. Ferguson T. llambach M. Grotenhuis J. Stone, I8E L. Derderian PSB Reviewers M. Antonetti, BNL R. Hall, BNL G. Lainas, Chief Plant Systems Branch Division of Operating Reactors OTTlOC3N'QRIIASCR~

DATC~

.P.OR:..I'.

L

'n:s j /~/80

.DO),

RFe uson J

/ZI/80

......:.PSB(PI4 C ain

/80 e 0 s-3I:50-

~ ~ ~

~ ~ ~ ~

~

~ ~

~

~ ~

~ ~

SEC ~>>

310 (9 76) HRCM 02(0 Q U 4 OOVORNMCNT PRINTINO OPT ICOI IDTD 44 ~

TDD

~e il>.

L L,g

TURKEY POINT UNITS 3 5 4 RESOLUTION'OF'INCOMPL'ETE ITEMS - STATUS Licensee I<<

I

~RR Staff Action Due 3.1.1 Fire Detection Systems 3.1.2 Fire Water Supply 3.1.6 Water Suppression Systems 3.1.7 Foam Suppression 3.1.15 Hydrogen Supply Lines Ongoing Information Ongoing Ongoing Ongoing 3/15/79 Late 2/1/80 2/1/80 2/1/80 2/1/80 3.2.1 Smoke Detection System 3.2.2 Reactor Coolant Pumps 3.2.3 Water Supply 3.2.4 Auxiliary Building Corridor 3.2.5 Cable Spreading Room

','RR Acceptance

'I riterqa Requirement

- Requirement Requirement Requirement None 20 days 20 days 20 days 20 days BNL(2/1/80)

1